Loading...
Gateway BP(3.1)-LR071024 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Inspection Report No.: 606987 Project No.: 0712786 Date of Service: 10/18/2007 Report Date: 10/24/2007 Project: Gateway Business Center Coppell, Texas Services: Structural Steel Inspection Report of Inspection Structural Fram ing Location: Eyebrow framing, visual weld inspection, building 1, grid lines 6.6-7.3/E and building 2, grid lines 6.7/E Non Code Com pliant Com pliant AWSD1.1 AISC Job Specs Bolt Tension Verification: Beam to Beam Bolt Tension Verification: Beam to Colum n BoltTension Verification: Girder to Column Weld Profile x x x x WQ 1's S tru ctu ral Visual Touch-Up Paint Verification Comments: 1. Framing has been modified, need supporting RFI documentation including weld detail. 2. not welded per general note. Request RFI documentation for minimum weld requirements. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/JC) Page 1 of 2 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Inspection Report No.: 606987 Project No.: 0712786 Date of Service: 10/18/2007 Report Date: 10/24/2007 Project: Gateway Business Center Coppell, Texas Services: Structural Steel Inspection Report Distribution: Orig: Transwestern Commercial Services (Dallas, TX) Attn: Mr. Ric Nelson (1-cc copy) 1-ec Constructors & Associates Attn: Mr. Frank Castro 1-cc City of Coppell Attn: Mr. Larry Davis 1-ec Mike Delvin Attn: Mr. Mike Delvin 1-cc Murray Construction Co., Inc. Attn: Mr. Terence Babler 1-cc City of Coppell Attn: Mr. Lee Stone 1-ec AECC, Inc. Attn: Mr. Brant Ince 1-ec Delaware Investment Advisers Attn: Mr. Keith Schinnerer PE 1-cc Aztec Environmental Attn: Mr. Mike Sexton Technician: Ron Cuba, CWI-97040341 K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIJC) Page 2 of 2 Rone Engineering ., Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299709 Project No.: 0712786 Date of Service: 09/24/2007 Report Date: 10/24/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 136 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 7.5 Mix Design I.D.: 1501 Placement Date: 09/24/2007 Weather Conditions: Clear, Calm Time Sampled: 08:00am Batch time: 07:28am Temperature - Air: 700F Concrete: 870F Truck No: 1190 Ticket No: 13697794 Air Content: 1.7% Unit Weight (pcf): NA Overall Placement Location: Building 2, 2nd floor slab on deck, grid line 0.9 to grid line A.1, grid line 1.1 to grid line 6 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 09/27/2007 3 6.00 28.27 56,260 1,990 Shear 1 2 10/01/2007 7 6.00 28.27 69,100 2,440 Cone/Split 1 3 10/22/2007 28 6.00 28.27 94,360 3,340 Shear 1 4 10/22/2007 28 6.00 28.27 98,590 3,490 Shear Average 3,410 1 5 11/19/2007 56 Remarks: Water added at site: 15 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in Quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 1 of 3 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 299709 Project No.: 0712786 Date of Service: 09/24/2007 Report Date: 10/24/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 136 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.5 Mix Design 1.0.: 1501 Placement Date: 09/24/2007 Weather Conditions: Clear, Calm Time Sampled: 10:30am Batch time: 10:00am Temperature - Air: 790F Concrete: 900F Truck No: 1032 Ticket No: 13697820 Air Content: 1.0% Unit Weight (pcf): NA Overall Placement Location: Building 2, 2nd floor slab on deck, grid line 0.9 to grid line A.1, grid line 1.1 to grid line 6 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 09/27/2007 3 6.00 28.27 74,130 2,620 Shear 2 2 10/01/2007 7 6.00 28.27 91,830 3,250 Shear 2 3 10/22/2007 28 6.00 28.27 113,730 4,020 Cone/Split 2 4 10/22/2007 28 6.00 28.27 115,270 4,080 Shear Average 4,050 2 5 11/19/2007 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBIED) Page 2 of 3