Loading...
Northlake College-LR071017 (2) K L E I N F E L 0 E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/12/2007 Date: 10/17/2007 Technician: J. Mayo Report No: 107054 Page 1 of 3 IDENTIFICATION S-8 R.4-8 K-2 J-2 H-0.5 K.8 MARK SHAFT DIAMETER 30" 30" 24" 24" 24" 24" PLAN/ACTUAL 30" 30" 24" 24" 24" 24" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 98.55' 98.64' 98.61' 98.66' 98.59' 98.64' DEPTH TO BEARING STRATUM 8.25' 8.58' 9.25' 10.50' 10.42' 10.25' UNDERREAM DIAMETER 90" 1 90" 90" 1 90" 72" 1 72" 72" 1 72" 72" 1 72" 72" 1 72" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.08' 14.67' 14.00' 14.17' 14.33' 14.42' DESCRIPTION OF BEARING STRATUM Tan Tan Tan Tan Tan Tan clay clav clav clav clav clav STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Within Within Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 7:46AM 8:08 AM 8:27 AM 8:36 AM 8:42 AM 8:51 AM TIME DRILLING COMPLETED 9:39 AM 10:08 AM 2:15 PM 1 :36 PM 3: 14 PM 4:01 PM REINFORCING STEEL 11.9' 11.7' 13.2' 12.0' 11.6' 13.0' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 8 8 6 6 6 6 QUANTITY / SIZE #7 #7 #7 #7 #7 #7 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Drv Drv Dry Dry Dry Dry PLACEMENT OF CONCRETE STARTED 11:34AM 11:38 AM 4:34 PM 4:37 PM 5:01 PM 4:44 PM PLACEMENT OF CONCRETE COMPLETED 11:38 AM 11 :45 AM 4:36 PM 4:42 PM 5:04 PM 4:47PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Canst.; Attn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Cons\.; Attn: Andy Munoz (amunoz@starlingrichardson.com) r: K~ER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) h/i ~ DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) 7 l- Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) Joel Peters, P.E. 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K L E I N F E L D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 T est Date: 10/12/2007 Date: 10/17/2007 Technician: J. Mayo Report No: 107054 Page 2 of 3 IDENTIFICATION J-8 H-1.5 Q-8 T-6.8 U-5.8 V-4 MARK SHAFT DIAMETER 24" 24" 30" 24" 24" 24" PLAN/ACTUAL 24" 24" 30" 24" 24" 24" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 98.69' 98.74' 98.61' 96.71' 96.58' 96.84' DEPTH TO BEARING STRATUM 10.42' 10.67' 10.33' 8.42' 10.33' 8.50' UNDERREAM DIAMETER 72" 1 72" 72" 1 72" 90" 1 90" 72" 1 72" 72" 1 72" 72" 1 72" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.58' 14.25' 14.08' 14.25' 14.50' 14.08' DESCRIPTION OF BEARING STRATUM Tan Tan Tan Tan Tan Tan clav clay clay c1av clav clay STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Within Within Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 9:11 AM 9:27 AM 9:42 AM 9:57 AM 10:06 AM 10:16 AM TIME DRILLING COMPLETED 2:53 PM 12:47 PM 11:21 AM 10:46 AM 11 : 15 AM 11:43 AM REINFORCING STEEL 14.1' 14.3' 11.6' 13.2' 12.4' 12.9' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 6 6 8 6 6 6 QUANTITY / SIZE #7 #7 #7 #7 #7 #7 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Drv Dry Dry Drv Drv Dry PLACEMENT OF CONCRETE STARTED 4:47 PM 4:51 PM 6:02 PM 5:07 PM 5:11 PM 5:16 PM PLACEMENT OF CONCRETE COMPLETED 4:51 PM 4:53 PM 6:09 PM 5:11 PM 5:15 PM 5:19 PM Remarks: 1 - Top of shaft elevation obtained from construction drawings 1 contractor Reports 10: Starling Richardson Const.; Alln: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) ~]fj7~ER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Atln: James Williams Uames.williams@dcccd.edu) DCCCD Bond Office; Atln: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.slogner@jacobs.com) I Joel Peters, P.E. Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Atln: Lee Stone The results shown on this report are for the exclusive use of the chent for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K L E I N F E L D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/12/2007 Date: 10/17/2007 Technician: J. Mayo Report No: 107054 Page 3 of 3 IDENTIFICATION V.2-3.5 V-2.1 T-O.4 R.4-1Q MARK SHAFT DIAMETER 24" 24" 24" 30" PLAN/ACTUAL 24" 24" 24" 30" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 96.80' 96.79' 96.87' 98.56' DEPTH TO BEARING STRATUM 11.00' 10.58' 10.25' 10.00' UNDERREAM DIAMETER 72" 1 72" 72" 1 72" 72" 1 72" 90" 1 90" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.25' 14.17' 14.50' 14.50' DESCRIPTION OF BEARING STRATUM Tan Tan Tan Tan clav clav c1av c1av STEEL CASING N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 10:26 AM 10:34 AM 11:49AM 8:44 AM TIME DRILLING COMPLETED 12:45 PM 1 :02 PM 2:01 PM 10:43 AM REINFORCING STEEL 10.9' 10.7' 12.6' 13.7' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" VERTICAL REBAR 6 6 6 8 QUANTITY / SIZE #7 #7 #7 #7 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Dry Dry Dry Drv PLACEMENT OF CONCRETE STARTED 5:32 PM 5:36 PM 5:43 PM 5:54 PM PLACEMENT OF CONCRETE COMPLETED 5:36 PM 5:41PM 5:47 PM 5:59 PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Const.; AUn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; AUn: Andy Munoz (amunoz@starlingrichardson.com) G K~LDER DCCCD Bond Office; AUn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; AUn: James Williams (james.williams@dcccd.edu) 'j~ln'l~ DCCCD Bond Office; AUn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; AUn: Andrea Stogner (Andrea.stogner@jacobs.com) f v Jacobs; AUn: Jennifer Blount (Jennifer.blount@jacobs.com) Joel Peters, P.E. 1- City of Coppell; AUn: Larry Davis 1- City of Coppell; AUn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the samples tested andlor inspected. They are not intended to be Indicative of the qualities of apparentiy identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K L E I N F E L D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/10/2007 Date: 10/17/2007 Technician: S. Wilson Report No: 107038 Page 1 of 5 IDENTIFICATION L-8.5 0-20 0-14 0-10 M-6 M-8.5 MARK SHAFT DIAMETER 18" 30" 30" 30" 18" 18" PLAN/ACTUAL 18" 30" 30" 30" 18" 18" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 98.74' 98.71' 98.66' 98.69' 98.70' 98.65' DEPTH TO BEARING STRATUM 10.0' 9.0' 10.5' 8.0' 10.0' 11.0' UNDERREAM DIAMETER 54" 1 54" 90" 1 90" 90" 1 90" 90" 1 90" 54" 1 54" 54" 1 54" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.6' 14.0' 14.0' 14.7' 14.5' 14.9' DESCRIPTION OF BEARING STRATUM Light brown Light brown Light brown Light brown Light brown Light brown clay clav clav c1av clav clay STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) Within Within Within Within Within Within PLUMBNESS VARIATION Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 10:03 AM 10:52 AM 11 :06 AM 11 : 17 AM 3:32 PM 1:49PM TIME DRILLING COMPLETED 10:48 AM 2:16 PM 3:15 PM 3:50 PM 2:15 PM 2:40 PM REINFORCING STEEL 12.6' 12.8' 12.3' 13.1' 12.3' 12.8' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY I SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 6 6 6 6 6 6 QUANTITY / SIZE #6 #6 #6 #6 #6 #6 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Moist Moist Moist Moist Moist Moist PLACEMENT OF CONCRETE STARTED 3:35 PM 5:01 PM 4:55 PM 4:48 PM 5:50 PM 5:53 PM PLACEMENT OF CONCRETE COMPLETED 3:40PM 5:06 PM 5:00 PM 4:51 PM 5:53 PM 5:55 PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Const.; Attn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) GblJJl !!tINFELDER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) ~ I~ DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) 71 --c- Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) Joel Peters, P.E. 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K l E I N F E l 0 E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/10/2007 Date: 10/17/2007 Technician: S. Wilson Report No: 107038 Page 2 of 5 IDENTIFICATION G-5 C-8 L-2* L-3.5 L-5.5 L-10 MARK SHAFT DIAMETER 30" 24" 30" 30" 30" 30" PLAN/ACTUAL 30" 24" 30" 30" 30" 30" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION' 98.62' 98.69' 98.59' 98.67' 98.60' 98.58' DEPTH TO BEARING STRATUM 10.0' 9.2' N/A 10.0' 8.0' 10.7' UNDER REAM DIAMETER 90" 1 90" 72" 1 72" 90" 1 90" 90" 1 90" 90" 1 90" N/A PLAN/ACTUAL FINAL DEPTH OF SHAFT 15.4' 14.8' 15.6' 15.0' 14.3' 14.0' DESCRIPTION OF BEARING STRATUM Lig ht brown Light brown Light brown Light brown Light brown Light brown c1av c1av c1av c1av c1av c1av STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Within Within Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 8:32 AM 8: 18 AM 8:45AM 8:57 AM 9:07 AM 9:37 AM TIME DRILLING COMPLETED 9:36 AM 10:00 AM 10:12 AM 11:04AM 11 :23 AM 1:10PM REINFORCING STEEL 12.9' 12.4' 12.7' 12.7' 13.3' 13.0' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 8 6 8 8 8 8 QUANTITY / SIZE #7 #7 #7 #7 #7 #7 CONOITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Moist Moist Moist Moist Moist Moist PLACEMENT OF CONCRETE STARTED 12:30 PM 12:24 PM 12:40 PM 1 :28 PM 12:54 PM 2:00 PM PLACEMENT OF CONCRETE COMPLETED 12:35 PM 12:29 PM 12:47 PM 1 :33 PM 1 :02 PM 2:06 PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Canst.; Attn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) w~DER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) f Joel Peters, P.E. Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exciusive use of the client for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K L E I N F E L D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/10/2007 Date: 10/17/2007 Technician: S. Wilson Report No: 107038 Page 3 of 5 IDENTIFICATION S-10 S-8.5 L-21 C-20 C-18 C-16 MARK SHAFT DIAMETER 24" 24" 18" 18" 18" 18" PLAN/ACTUAL 24" 24" 18" 18" 18" 18" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 98.52: 98.60' 98.59' 98.63' 98.67' 98.60' DEPTH TO BEARING STRATUM 10.5' 12.0' 13.5' 13.5' 10.3' 11.4' UNDERREAM DIAMETER 72" 1 72" 72" 1 72" 54" 1 54" 54" 1 54" 54" 1 54" 54" 1 54" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.4' 14.3' 14.3' 14.4' 14.4' 14.0' DESCRIPTION OF BEARING STRATUM Light red Light red Light red Light red Light red Light red brown clav brown clav brown clav brown c1av brown clay brown clay STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Within Within Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 11 : 12 AM 11:17AM 11:50AM 11:51 AM 12:00 PM 12:09 PM TIME DRILLING COMPLETED 3:40 PM 4:10 PM 3:33 PM 3:50 PM 4:15 PM 4:35 PM REINFORCING STEEL 13.5' 12.8' 13.1 ' 12.4' 12.7' 12.1' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 6 6 6 6 6 6 QUANTITY / SIZE #7 #7 #6 #6 #6 #6 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Drv Dry Dry Dry Dry Dry PLACEMENT OF CONCRETE STARTED 5:43 PM 5:46 PM 1:34 PM 1 :37 PM 1:41 PM 1:44 PM PLACEMENT OF CONCRETE COMPLETED 5:45 PM 5:48 PM 1 :37 PM 1:41PM 1 :44 PM 1:48 PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Const.; Attn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) (bC1, PAR DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) 7 '- Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) Joel Peters, P.E. 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the dient for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K l E I N F E l D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/10/2007 Date: 10/17/2007 Technician: S. Wilson Report No: 107038 Page 4 of 5 IDENTIFICATION S-22 S-20 S-18 S-16 S-14 S-12 MARK SHAFT DIAMETER 24" 24" 24" 24" 24" 24" PLAN/ACTUAL 24" 24" 24" 24" 24" 24" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 98.63' 98.67' 98.60' 98.63' 98.65' 98.70' DEPTH TO BEARING STRATUM 10.0' 9.8' 10.2' 13.0' 10.0' 11.0' UNDERREAM DIAMETER 72" 1 72" 72" 1 72" 72" 1 72" 72" 1 72" 72" 1 72" 72" 1 72" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.1' 14.2' 14.0' 14.1' 14.0' 14.2' DESCRIPTION OF BEARING STRATUM Lig ht red Light red Light red Light red Lig ht red Light red brown clav brown clay brown clay brown clay brown clay brown clay STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) Within Within Within Within Within Within PLUMBNESS VARIATION Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 10:30 AM 10:40 AM 10:48 AM 10:53 AM 11 : 00 AM 11 : 07 AM TIME DRILLING COMPLETED 1 :20 PM 1:42 PM 2:00 PM 2:23 PM 2:45PM 3:40 PM REINFORCING STEEL 12.4' 12.7' 13.1' 12.5' 13.3' 12.9' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 6 6 6 6 6 6 QUANTITY / SIZE #7 #7 #7 #7 #7 #7 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Moist Moist Moist Moist Moist Moist PLACEMENT OF CONCRETE STARTED 4:18 PM 4:25 PM 4:29 PM 4:31 PM 4:43PM 4:45 PM PLACEMENT OF CONCRETE COMPLETED 4:24 PM 4:28 PM 4:31 PM 4:35 PM 4:46 PM 4:48PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starting Richardson Const.; Attn: Eric Stanaland (eps@startingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) (W ~DER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) jI Joel Peters, P.E. Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of aur name must receive prior written approval. Reports must be reproduced in their entirety. K L E I N F E L D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/10/2007 Date: 10/17/2007 Technician: S. Wilson Report No: 107038 Page 5 of 5 IDENTIFICATION L-14 L-12 M-21 M.3-10 MARK SHAFT DIAMETER 18" 18" 18" 18" PLAN/ACTUAL 18" 18" 18" 18" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION' 98.58' 98.62' 98.58' 98.61' DEPTH TO BEARING STRATUM 12.2' 13.0' 11.2' 10.4' UNDERREAM DIAMETER 54" 1 54" 54" 1 54" 54" 1 54" 54" 1 54" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.0' 14.4' 14.2' 14.3' DESCRIPTION OF BEARING STRATUM Light brown Light brown Light brown Light brown clay clay clay clay STEEL CASING N/A N/A N/A N/A DIAMETER (IN.) I DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 12:17 PM 12:20 PM 12:24 PM 2:20 PM TIME DRILLING COMPLETED 5:00 PM 5:15 PM 5:35 PM 4:25 PM REINFORCING STEEL 13.4' 13.0' 12.6' 12.8' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" 12" VERTICAL REBAR 6 6 6 6 QUANTITY I SIZE #6 #6 #6 #6 CONDITION OF SHAFT BOTTOM Clean Clean Clean BEFORE CONCRETE PLACEMENT Moist Moist Moist PLACEMENT OF CONCRETE STARTED 6:08 PM 6:04 PM 6:28 PM 5:55 PM PLACEMENT OF CONCRETE COMPLETED 6:14 PM 6:28 PM 6:32 PM 6:02 PM Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Const.; Attn: Eric Stanaland (eps@startingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) w;?2;ER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) f Joel Peters, P.E. Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K l E I N F E l D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/12/2007 Date: 10/17/2007 Technician: J. Schuler Report No: 107053 Page 1 of 2 IDENTIFICATION R1.-12 R.1-14 R.1-16 R.1-20 R-22 T-OA MARK SHAFT DIAMETER 18" 18" 18" 18" 18" 24" PLAN/ACTUAL 18" 18" 18" 18" 18" 24" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION 98.62' 98.59' 98.57' 98.63' 98.62' 98.74' DEPTH TO BEARING STRATUM 10.0' 10.2' 10.5' 9.6' 12.2' 11.2' UNDERREAM DIAMETER 54" 1 54" 54" 1 54" 54" / 54" 54" 1 54" 54" 1 54" 72" 1 72" PLAN/ACTUAL FINAL DEPTH OF SHAFT 14.0' 14.1' 14A' 15.9'** 14.2' 14.6' DESCRIPTION OF BEARING STRATUM Tan sandy Tan sandy Tan sandy Tan sandy Tan sandy Tan sandy c1av c1av clav c1av c1av clav STEEL CASING N/A N/A N/A N/A N/A N/A DIAMETER (IN.) I DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Within Within Within Tolerance Tolerance Tolerance Tolerance Tolerance Tolerance TIME DRILLING STARTED 10:36 AM 10:48 AM 11 : 02 AM 11: 12 AM 11 :25 AM 11:37 AM TIME DRILLING COMPLETED 1: 1 0 PM 1 :34 PM 2:04 PM N/A 3:05 PM 1 :51 PM REINFORCING STEEL 12.3' 12.10' 13.2' 12.7' 12.3' 12.5' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at #4 at #4 at #4 at QUANTITY I SIZE 12" 12" 12" 12" 12" 12" VERTICAL REBAR 6 6 6 6 6 6 QUANTITY I SIZE #6 #6 #6 #6 #6 #7 CONDITION OF SHAFT BOTTOM Clean Clean Clean Clean Clean Clean BEFORE CONCRETE PLACEMENT Dry Dry Drv Dry Drv Dry PLACEMENT OF CONCRETE STARTED N/A N/A N/A N/A N/A N/A PLACEMENT OF CONCRETE COMPLETED Remarks: 1 _ Top of shaft elevation obtained from construction drawings / contractor *_ Pier R.1-Z0 was drilled deeper when removing backfill from 10/11/07. The underlying sand layer was encountered during the underreaming process, and drilling was stopped. The contractor then followed the recommendations of BVNA Geotechnical Engineer. The pier will be completed on the next day of drilling. Reports to: Starling Richardson Const.; Attn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) ~INFELDER DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) 0oJ, DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) Ilk DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) 11 ~ Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) Joel Peters, P.E. 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the samples tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approval. Reports must be reproduced in their entirety. K L E I N F E L D E R 2211 Century Center Blvd., Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 UNDERREAM DRILLED SHAFT REPORT TO: Dallas County Community College Dist. PROJECT: North Lake College, N Campus 1505 South Lamar, Suite 1015 W Sandy Lake Road @ SH 121 Dallas, Texas 75215 PROJECT NO: 87015 Test Date: 10/12/2007 Date: 10/17/2007 Technician: J. Schuler Report No: 107053 Page 2 of 2 IDENTIFICATION S.5-0.7 S-0.3 R.6-0.7 MARK SHAFT DIAMETER 24" 24" 24" PLAN/ACTUAL 24" 24" 24" GROUND SURFACE ELEVATION TOP OF SHAFT ELEVATION' 98.74' 98.72' 98.76' DEPTH TO BEARING STRATUM 10.9' 11.1 ' 10.5' UNDERREAM DIAMETER 72" 1 72" 72" 1 72" 72" 1 72" PLAN/ACTUAL FINAL DEPTH OF SHAFT 15.0' 14.0' 14.1' DESCRIPTION OF BEARING STRATUM Tan sandy Tan sandy Tan sandy c1av c1av clav STEEL CASING N/A N/A N/A DIAMETER (IN.) / DEPTH (FT.) PLUMBNESS VARIATION Within Within Within Tolerance Tolerance Tolerance TIME DRILLING STARTED 12:37 PM 12:45 PM 12:53 PM TIME DRILLING COMPLETED 2:23 PM 2:54 PM 1 :25 PM REINFORCING STEEL 12.8' 13.2' 12.4' CAGE LENGTH HORIZONTAL REBAR #4 at #4 at #4 at QUANTITY / SIZE 12" 12" 12" VERTICAL REBAR 6 6 6 QUANTITY / SIZE #7 #7 #7 CONDITION OF SHAFT BOTTOM Clean Clean Clean BEFORE CONCRETE PLACEMENT Drv Drv Dry PLACEMENT OF CONCRETE STARTED N/A N/A N/A PLACEMENT OF CONCRETE COMPLETED Remarks: 1 _ Top of shaft elevation obtained from construction drawings 1 contractor Reports to: Starling Richardson Const.; Attn: Eric Stanaland (eps@starlingrichardson.com) Starling Richardson Const.; Attn: Andy Munoz (amunoz@starlingrichardson.com) Oal~R DCCCD Bond Office; Attn: Brenda Spinelli (brenda.spinelli@dcccd.edu) DCCCD Bond Office; Attn: James Williams Uames.williams@dcccd.edu) DCCCD Bond Office; Attn: Mike Daniels (mike.daniels@dcccd.edu) Jacobs; Attn: Andrea Stogner (Andrea.stogner@jacobs.com) I Joel Peters, P.E. Jacobs; Attn: Jennifer Blount (Jennifer.blount@jacobs.com) 1- City of Coppell; Attn: Larry Davis 1- City of Coppell; Attn: Lee Stone The results shown on this report are for the exclusive use of the client for whom they were obtained and apply only to the sampies tested and/or inspected. They are not intended to be indicative of the qualities of apparently identical products. The use of our name must receive prior written approvaL Reports must be reproduced in their entirety.