Loading...
Duke Lesley 1A-LR071029 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 303060 Project No.: 0713408 Date of Service: 10/25/2007 Report Date: 10/29/2007 Project: Point West VI Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Pier B/2, bridge, special detail Item s Inspected: Conforming Non Item s Inspected: Conforming Non Item s Ins petted: Conforming Non Conforming Conforming Conforming P lacing Drawings Bar Length Column Ties Property Appro ved x and Shape x Tied and Spaced x Bar Size x Pro per Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean NA Proper B ar Supports x Corner Bars NA Numberof Bars x ProperCover NA Mechanical Splices NA Discrepancies 1 Comments: No apparent discrepancies were noted at the locations listed above. Technician: Jimmy Hall Rone Engineering See Report 302904 for technician timep". -"'*"r.~.", ,. . Report Distribution: . _~""""'~L Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Larry Davis Project Manager 1-cc City of Coppell Attn: Mr. Lee Stone ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302590 Project No.: 0713408 Date of Service: 10/20/2007 Report Date: 10/29/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Ltd. Plant: On Site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5.0" - 7.0" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9341 Placement Date: 10/20/2007 Weather Conditions: Clear / Windy Time Sampled: 09:00am Batch time: 08:44am Temperature - Air: 700F Concrete: 750F Truck No: 103 Ticket No: 8072 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers: 348-350, 329-334, and 265-270 Measured Slump (inches) 6.75 Sample Location: Pier 348 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/27/2007 7 6.00 28.27 79,830 2,820 Cone/Split 1 2 11/17/2007 28 1 3 11/17/2007 28 1 4 12/15/2007 56 Technician: Bruce Eberts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans 1-cc City of Coppell Attn: Mr. Larry Davis 1-cc City of Coppell Attn: Mr. Lee Stone Rone Engineering See Ropo" 302589 foe "0"""''' ti~ P ~ K. Scott Watson, AET Project Manager ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (lB/lB) Page 1 of 1 Rone En2~ 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 303022 Project No.: 0713408 Date of Service: 10/25/2007 Report Date: 10/29/2007 Project: Point West VI Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Slab on grade, building 6, grid lines J-K/2-12 Rem sins pected: Conforming Non Items Inspected: Conforming Non Item s Ins peeled: Conforming Non Conforming Conforming Co nfo rm ing P lac ing Drawings Bar Length Column Ties Properly Approved x and Shape x Tied and Spaced NA Bar Size x Pro per Bar P lacem enl x Stirrup Spacing NA Bar Grade x Properly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar Suppo rts x Co rner Bars NA Numberof Bers x Proper Cover x Mechanical Splices NA Discrepancies / Comments: 1. Reinforcing steel placement was still in place at time of inspection. 2. Inspected logitudinal and transverse reinforcement, depermed and diamond dowels, vapor barrier and form work. 1. Missing chairs. 2. Impropercoverdue to missing bar supports. Per Potter Concrete, bar supports to be installed prior to and during concrete placement. Technician: Francisco Calvillo, CET Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans 1-cc City of Coppell Attn: Mr. Larry Davis 1-cc City of Coppell Attn: Mr. Lee Stone Started: 03:00pm Finished: 05:30pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (fMIJB) Page 1 of 1