Duke Lesley 1A-LR071105
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Comp,ressive Strength Test
Report No.: 301202
Project No.: 0713408
Date of Service: 10/05/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: LMC
Plant: 7
Specification Requirements
Strength: 4,200 psi @ 28 days
Slump (in.): 2" - 4"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 1851
Placement Date: 10/05/2007
Weather Conditions: Sunny
Time Sampled: 03:00pm
Temperature - Air: 920F
Truck No: 1045
Air Content: NA
Overall Placement Location:
Manhole, flat top, Station 24+19
Batch time: 02:43pm
Concrete: 900F
Ticket No: 7183223
Unit Weight (pet): NA
Measured
Slump
(inches)
3.0
Sample Location:
Station 24+19
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/12/2007 7 6.00 28.27 120,860 4,270 Cone/Shear
1 2 11/02/2007 28 6.00 28.27 143,130 5,060 Cone/Split
1 3 11/02/2007 28 6.00 28.27 146,130 5,170 Cone/Split
Average 5,120
1 4 11/30/2007 56
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Rone Engineering
s.. Report 301130 Io"eo"';o;" time, ~
K. Scott Watson, AET
Project Manager
Technician: Denny Harris
~
L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(1M/ED) Page 1 of 1
Rone En~~
8908 Ambassador Row, Dallas, TX 75241
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303611
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: Auger
Pier Identification D /19 D /20 D /21 D /22 C /14
PierDiameter(in) 24#117 2 4 /# 1 1 8 2 4 /# 1 1 9 2 4/# 1 2 0 2 4 /# 8 7
Depth of Pier From Surface (ft) 42.00 41.30 41.50 37.60 43.00
Deoth of Bearing Stratum Fro m S urfa ce (ft) 36.40 35.00 35.10 32.50 37.90
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A c tu a I Pen e tra ti 0 n (ft) * 5.60 6.30 6.40 5.10 5.10
Condition of Bottom (wet/drv) D rv D rv D rv Dry D rv
Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes
CasinQ Diameter(in)/Casing Length (ft) 2 6/3 6 .5 2 6/3 5 2 6/3 5 26/32.5 27
Number of Bars / Reinforcing Bar Size 6 1#6 6 1#6 6 1#6 6 / #6 6 1#6
Lenath of Reinforcing Steel (ft) 40.00 39.00 39.50 36.00 41.00
Time Drilling was Comoleted (am 10m) 8:30 AM 9:00 AM 9 :20 A M 9 :4 5 A M 1 0 :2 5 AM
Time Concrete was Placed (am Ipm) 9:20 AM 9 :4 0 A M 10:12AM 1 0 :4 0 AM 11:00AM
Depth of Pier From Top of Concrete (ft) 41.50 40.80 41.00 37.10 42.50
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 57.50 58.20 58.00 61 .90 56.50
Elevation: Top of Bearing Stratum (ft.)** 63.10 64.50 64.40 67.00 61.60
Bearina Stratum (description) Gravshale
Note:See report# 303612 forCompressive StrengthTestSpecimens.
* Additional Penetration not requested unless noted. **Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfKW) Page 1 of 5
Rone En~~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303611
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auoer
Pie rid e ntifica lio n C /1 5 C /16 C /1 7 C /1 8 C /19
PierDiameterlin) 2 4 /# 8 6 2 4 /# 8 5 2 4 /# 8 4 2 4 /# 8 3 2 4 /# 8 2
Depth of Pier From Surface 1ft) 44.00 44.00 44.50 44.90 42.00
Depth ofBearino Stratum F ro m S u rfa c e (ft) 39.00 38.00 38.00 37.90 36.00
Reo u i re d Pen e tra li 0 n (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)" 5.00 6.00 6.50 7.00 6.00
Condition of Bottom (wet/drv) D rv D rv D rv D rv D rv
Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes
Casino Diameter(in)/Casina Lenoth (ft) 2 6 /3 9 26 /3 7 2 6 /3 7 26/3 7 26/36.5
NumberofBars /Reinforcina BarSize 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Lenoth of Reinforcino Steel 1ft) 43.00 42.50 43.50 43.90 40.00
Time Drillino was Completed lam tom) 10:55 AM 11 :20 AM 11:15AM 1 1 :35 AM 1 1 :35 AM
Time Concrete was Placed lam tom) 11:30AM 11:55AM 12:15 PM 1 2 :4 5 P M 1 :20 P M
Depth of Pier From Top of Concrete (ft) 43.50 43.50 44.00 44.40 41.50
Elevation: Surface 1m" 99.50 99.50 99.50 99.50 99.50
Elevation: Too of Pier 1m" 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom ofPier(ft).. 55.50 55.50 55.00 54.60 57.50
Elevation: Top ofBearino Stratum 1ft.)" 60.50 61.50 61.50 61.60 63.50
Be a rino Stratum Id e scriolio n) Gravshale
Not e: See re port # 303612 for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfKW) Page 2 of 5
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303611
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
I
D rille r: Auger
Pie r Id e ntifica tio n C 120 C 121 C 122 B 114 B 115
PierDiameter(in) 24/#81 2 41# 8 0 24/#79 2 4/# 3 2 2 4/# 3 3
Depth of Pier From Surface (ft) 44.60 40.50 37.00 42.00 45.00
Depth ofBearinQ Stratum From S u rfa c e (ft) 38.00 34.50 31.70 36.00 39.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 6.60 6.00 5.30 6.00 6.00
Condition of Bottom (wet/dry) Dry Dry D rv D rv Dry
Plumb Within Tolerance (ves / no) Yes Yes Yes Yes Yes
CasinQ Diameter(in)/Casina Lenath (fO 2 6/3 5 2 6/3 5 26/32.5 2 613 6 2 6/3 9
N um ber of Bars / ReinforcinQ Bar Size 6 1#6 6 / #6 6/#6 6 / #6 6/#6
Length of Reinforcina Steel (ft) 43.60 39.50 36.00 41.00 44.00
Tim e D ri IIi n Q was Com 0 Ie te d (a m / 0 m) 11:56AM 12:05 PM 12:25 PM 1 :56 PM 2:25 PM
Time Concrete was Placed (am 10m) 1 :35 PM 1 :45 PM 2 :00 PM 2:30 PM 3:15 PM
Deoth of Pier From Top of Concrete (ft) 44.10 40.00 36.50 41.50 44.50
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom ofPier(ft)** 54.90 59.00 62.50 57.50 54.50
Elevation: Top of BearinQ Stratum (ft.)** 61.50 65.00 67.80 63.50 60.50
Bearing Stratum (descriotion) G ra y s h a Ie
Note: See re port # 303612 for Com pressive Strength Test S pecim ens.
* Additional Penetration not requested u n Ie s s note d . **E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume rlO responsibility for variation in quality
(composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CHIKW) Page 3 of 5
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303611
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pie rid e ntifica tio n B 116 B 117 B 118 B 119 B 120
PierDiameter(in) 2 4 1# 3 4 2 4/# 3 5 2 4 1# 3 6 2 4 1# 3 7 2 4 1# 3 8
Deoth of Pier From Surface (ft) 41.60 42.70 42.40 42.30 41.00
Depth of Bearing Stratum Fro m Surface(ft) 36.00 37.70 37.00 37.20 35.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft). 5.60 5.00 5.40 5.10 6.00
Condition of Bolt om (wet/dry) Dry Dry Dry D rv Dry
Plumb Within Tolerance (ves Ino) ves ves ves Ves Ves
Casina Diameter(in)/Casing Length(ft) 26/37 2 6 13 7 26/37 26/36.5 26/35
Number of Bars I Reinforcina Bar Size 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcina Steel (ft) 43.00 41.70 40.50 40.50 40.00
Time Drilling was Comoleted (am Ipm) 3 :00 PM 3 :15 PM 3 :3 0 P M 3:36 PM 3 :5 0 PM
Time Concrete was Placed (am Ipm) 3:45 PM 4:00PM 4:15 PM 4:30 PM 4 :4 5 P M
DepthofPierFrom Top of Concrete (ft) 41 .1 0 42.20 41.90 41.80 40.50
E Ie va tio n: S urfa ce (ft).. 99.50 99.50 99.50 99.50 99.50
E Ie va tio n: To p of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom ofPier(ft).. 57.90 56.80 57.10 57.20 58.50
Elevation: Top of Bearina Stratum (ft.)" 63.50 61.80 62.50 62.30 64.50
Bearina Stratum (d escriptio n) Gravshale
Note: See report It 303682 for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. UElevation by others
LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 5
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303611
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pier Identification B /2 1
PierDiameter(in} 2 4 /# 3 9
D e 0 th 0 f Pie r Fro m S u rfa c e (ft) 40.00
Depth of Bear in a Stratum Fro m Surface(ft} 33.40
Reauired Penetration 1ft) 5.00
A ctua I P e ne tra tio n (ft)" 6.60
Condition of Bottom (wet/drv) o rv
Plumb Within Tolerance (ves /no) Yes
Casina Diameter(in)/Casina Lenath (ft) 26/32.5
NumberofBars /Reinforcing BarSize 6 / #6
LenClth of ReinforcinQ Steel (ft) 39.00
Time DrillinQ was Comoleted (am Ipm) 3 :4 7 P M
Tim e Con c re te was P la c e d (a m / pm) 5:00 PM
Deoth of Pier From Top of Concrete (ft) 39.50
Elevation: Surface (fl)" 99.50
Elevation: Top of Pie r (ft).. 99.00
Elevation: Botto m of Pier (ft).. 59.50
Elevation: Too of Bearina Stratum (ft.)" 66.10
BearinQ Stratum (descriotion) G ra V s h a Ie
Not e: See re port # 303612 for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. "Elevation by others
Technician: Denny Harris
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Started: 06:45am Finished: 06:00pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 5 of 5
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 302905
Project No.: 0713408
Date of Service: 10/25/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9341
Placement Date: 10/25/2007
Weather Conditions: Clear
Time Sampled: 12:10pm
Temperature - Air: 640F
Truck No: 104
Air Content: NA
Overall Placement Location:
Piers (see report #302904)
Batch time: 11:12am
Concrete: 860F
Ticket No: 8145
Unilt Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
Pier B/16
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength
Set No. Tested ( days) (in) (in') (Ibs) (psi)
1 1 11/01/2007 7 6.00 28.27 54,860 1,940
2 11/22/2007 28
3 11/22/2007 28
4 12/20/2007 56
Technician: Jimmy Hall
Fracture
Type
Shear
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Rone Engineering
See Report 3029,. 10< _"~i" 'mep ~
K. Scott Watson, AET
Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/JB) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303066
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9341
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 1 0:20am
Temperature - Air: 630F
Truck No: 101
Air Content: NA
Overall Placement Location:
See Pier Inspection sheet for 10/26/07
Sample Location:
Piers 8/21, 8/22
REPORT OF TESTS
Batch time: 09:46am
Concrete: 860F
Ticket No: 8226
Unit Weight (pct): NA
Measured
Slump
(inches)
6.5
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
89,680
Cylinder
Marked Date
Set No. Tested
1 1 11/02/2007
1 2 11/23/2007
1 3 11/23/2007
1 4 12/21/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Area
(inZ)
28.27
Compressive
Strength
(psi)
3,170
Fracture
Type
Cone/Shear
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Rone Engineering
See Report 303065 "" """';c;oo t'<rtep ~
K. Scott Watson, AET
Project Manager
Technician: Jimmy Hall
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 1
Rone En~==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 303776
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Paint West VI
Cappell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
100 %
60%
A B C D E
W e ig h t Percent W e ig h t Percent
Sam pie Retained Passing Retained Passing
Location W e ig h t 1 1/2" Sieve 1 1/2" Sieve #4 S ie v e #4 S ie v e
1 Building pad, grid lines A.5/41.5 11.6 0 1 00%. 4.1 64.6 %
2 Building pad, grid lin es C .5/41.5 1 1 .0 0 100% 4.0 63.6 %
3 Building pad, grid lin es E .5/41.5 1 1 .3 0 1 00% 4.1 63.7%
4 Building pad, grid lin es G .5/41.5 1 2.9 0 1 00% 4.2 67.4 %
5 Building pad, grid lines J.5/41.5 1 1 .5 0 1 00% 4.1 64.3 %
Technician: Joe Jernigan Rone Engineering
Report Distribution, ... Report 303775 "n."m""," time ~. . ~~~. . .
Orig: Duke Construction, LP (Dallas, TX) . r~
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans K. Scott Watson, AET
1-cc City of Coppell Attn: Mr. Larry Davis Project Manager
1-cc City of Coppell Attn: Mr. Lee Stone
~
LIMIT A TlaNS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIJB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 303604
Project No.: 0713408
Date of Service: 10/30/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 741 Current: 2552
Previous: 746 Previous: 2537
MOISTURE DENSITY RELATIONS
MID No.
299552
Description
Lime Treated Brown & Tan 1 Sandy Clay
Moisture
%
Maximum
Density
(pet)
85.7
Project Requirements
Moisture Density
Optimum +4 95 min
30.3
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Subgrade
Building pad, grid line A.5/38 6" 299552 31.5 110.7 84.2 98
Subgrade
2 Building pad, grid line C.5/38 6" 299552 31.7 111.7 84.8 99
Subgrade
3 Building pad, grid line E.5/38 6" 299552 33.7 111.6 83.5 97
Subgrade
4 Building pad, grid line G.5/38 6" 299552 33.5 110.9 83.1 97
Subgrade
5 Building pad, grid line J.5/38 6" 299552 30.4 111.9 85.8 100
Technician: Joe Jemigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 11 :OOam Finished: 12:45pm
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
L1MrTA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 303775
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 744 Current: 2563
Previous: 741 Previous: 2552
MOISTURE DENSITY RELATIONS
MID No.
272998
Description
Brown I Silty Clay wi Organics
Moisture
%
Maximum
Density
(pet)
96.5
Project Requirements
Moisture Density
Optimum +4 95 min
22.5
Test Location
FIELD DENSITY TESTS
Probe MID
Depth No.
Moisture Wet Density Dry Density Density
% (pet) (pet) (% max)
Test
No
Utility backfill
50' from south end of sanitary sewer line, 4' 6" 272998 24.9 116.8 93.5 97
below grade
Utility backfill
2 50' from south end of sanitary sewer line, 2' 6" 272998 23.9 116.6 94.1 98
below grade
Utility backfill
3 50' from south end of sanitary sewer line, final 6" 272998 23.7 116.3 94.0 97
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 01 :30pm Finished: 04:00pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 303753
Project No.: 0713408
Date of Service: 10/31/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Building 6, slab on grade, column lines E-G/2-12.
Item s Inspected: Conforming Non Item s Inspected: Conforming Non Item sins pected: Conforming Non
Conforming Co nfo rm ing Conforming
Placing Drawings 8 ar Length Column Ties Pro perly
Appro ved x and Shape x Tied and Spaced NA
8 ar Size x Pro per Bar P laeem ent x Stirrup Spacing NA
8 ar Grade x Pro perly Tied x Stirrup Type NA
8 ars Clean x Dowel 8 ars in Place x Lapped Splices x
Form Clean x Pro per 8 ar Suppa rts x Co mer 8 ars NA
Numberof 8ars x Proper Cover x Mechanical Splices NA
Discrepancies / Comments:
1. Reinforcement chairing is scheduled to be placed during concrete placement.
No other apparent discrepancies were noted at the locations listed above,
Technician: Clayton Snyder Started: 01 :30pm
Report Distribution:
Orig: Duke Construction, LP (Dallas. TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppel! Attn: Mr. Lee Stone
~
K, Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TM/JB) Page 1 of 1
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date ot Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 03: 1 Oam
Temperature - Air: 450F
Truck No: 127
Air Content: 1.2%
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 650F
Ticket No:
Unit Weight (pct): NA
Measured
Slump
(inches)
2.75
Sample Location:
Grid line A.5-11.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/02/2007 7 6.00 28.27 141 ,940 5,020 Cone/Split
1 2 11/23/2007 28
1 3 11/23/2007 28
4 12/21/2007 56
Remarks: Notified Mr. Dick of test results
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 10
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 04:11am
Temperature - Air: 400F
Truck No: 143
Air Content: 1.1 %
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 660F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
5.25
Sample Location:
Grid line B.9-11.1
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
2 1 11/02/2007
2 2 11/23/2007
2 3 11/23/2007
2 4 12/21/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
114,330
Compressive
Strength
(psi)
4,040
Fracture
Type
Shear
Area
(in')
28.27
LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CH/JB) Page 2 of 10
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 05:20am
Temperature - Air: 400F
Truck No: 133
Air Content: 1.1 %
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 580F
Ticket No:
Unit Weight (pct): NA
Measured
Slump
(inches)
5.25
Sample Location:
Grid line A.9-10.4
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 11/02/2007 7 6.00 28.27 105,420 3,730 Cone/Split
3 2 11/23/2007 28
3 3 11/23/2007 28
3 4 12/21/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(CH/JB) Page 3 of 10
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 06:25am
Temperature - Air: 400F
Truck No: 118
Air Content: 1.0%
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 600F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
5.75
Sample Location:
Grid line B.1-9.2
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
4 1 11/02/2007
4 2 11/23/2007
4 3 11/23/2007
4 4 12/21/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
113,320
Compressive
Strength
(psi)
4,010
Fracture
Type
Cone/Split
Area
(in')
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(CH/JB) Page 4 of 10
Rone Engineering
--
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 07:40am
Temperature - Air: 420F
Truck No: 136
Air Content: 1.1 %
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 670F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
5.75
Sample Location:
Grid line A.9-B.6
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
5 1 11/02/2007
5 2 11/23/2007
5 3 11/23/2007
5 4 12/21/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
100,730
Compressive
Strength
(psi)
3,560
Fracture
Type
Shear
Area
(in')
28.27
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 5 of 10
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 09:00am
Temperature - Air: 560F
Truck No: 133
Air Content: 1.1 %
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 680F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
Grid line B.2-6.9
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 11/02/2007 7 6.00 28.27 109,330 3,870 Cone/Split
6 2 11/23/2007 28
6 3 11/23/2007 28
6 4 12/21/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 6 of 10
Rone En2==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich,8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Req uirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 10:00am
Temperature - Air: 580F
Truck No: 118
Air Content: 1.2%
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 700F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Grid line B.9-5.7
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in") (Ibs) (psi) Type
7 1 11/02/2007 7 6.00 28.27 109,370 3,870 Cone/Split
7 2 11/23/2007 28
7 3 11/23/2007 28
7 4 12/21/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 7 of 10
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 12:07pm
Temperature - Air: 700F
Truck No: 136
Air Content: 1.1 %
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 750F
Ticket No:
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.5
Sample Location:
Grid line A.9-4.5
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 11/02/2007 7 6.00 28.27 117,980 4,170 Cone/Split
8 2 11/23/2007 28
8 3 11/23/2007 28
8 4 12/21/2007 56
Remarks: Notified onsite crew leader of test results
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(CH/JB) Page 8 of 10
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
f Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concret
samples back to the laboratory r c
Contractor: Duke Construe'
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 01 :OOpm
Temperature - Air: 740F
Truck No: 127
Air Content: 1.0%
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 760F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
5.5
Sample Location:
Grid line B.9-5.7
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 11/02/2007 7 6.00 28.27 105,090 3,720 Cone/Split
9 2 11/23/2007 28
9 3 11/23/2007 28
9 4 12/21/2007 56
Remarks: Notified onsite crew leader of test results
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 9 of 10
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303087
Project No.: 0713408
Date of Service: 10/26/2007
Report Date: 11/05/2007
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 02:07pm
Temperature - Air: 730F
Truck No: 136
Air Content: 1.2%
Overall Placement Location:
Building slab - grid line A.1 to C, 2 to 12
Batch time:
Concrete: 750F
Ticket No:
Unit Weight (pct): NA
Measured
Slump
(inches)
5.75
Sample Location:
Grid line A.9-2.3
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in") (Ibs) (psi) Type
10 1 11/02/2007 7 6.00 28.27 133,910 4,740 Cone/Split
10 2 11/23/2007 28
10 3 11/23/2007 28
10 4 12/21/2007 56
Technician: Javier Martinez
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 02:00am Finished: 03:00pm
Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 10 of 10