Duke Lesley 1A-LR071102
Rone En~==
_I 8908 Ambassador Row, Dallas, TX 75247
77u1 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303484
Project No.: 0713408
Date of Service: 10/30/2007
Report Dllte: 11/02/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: A uo e'r
Pie r Id e n ti fi c a ti 0 n F 116 F 117 F 118 F 119 F 12 0
Pier Diameter (in) 24 24 24 24 24
De p th 0 f Pie r Fro m S u rfa c e (ft) 45.00 42.50 45.00 42.50 40.50
Deoth ofBearino Stratum From S u rfa c e (ft) 39.00 37.00 39.00 37.20 34.50
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 6.00 5.50 6.00 5.30 6.00
Condition of Boll om (wet/dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes
Casino Diameter(in)/Casino Lenath (ft) 26/37 26/37 2 6/3 7 26/36.5 2 613 5
NumberofBars IReinforcino BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 44.00 41.50 44.00 41.50 39.50
Time Drilling was Completed (am Ipm) 8 :3 5 AM 9:00 AM 9 :2 7 AM 9:50 AM 10:15 AM
Time Concrete was Placed (am Ipm) 9 :3 0 AM 9:50 AM 10:30 AM 1 1 :20 AM 12:30AM
D eo th 0 f Pie r Fro m Top 0 f Con c re te (ft) 44.50 42.00 44.50 42.00 40.00
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
E leva tio n: Botto m of Pie r (ft).. 54.50 57.00 54.50 57.00 59.00
Elevation: Too ofBearino Stratum (ft.)** 60.50 62.50 60.50 62.30 65.00
Bearing Stratum (description) G ra V shale
Note: See report # NA for Com pressive Strength Test Specim ens.
. Additional Penetration not requested unless noted. HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume nO responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have rlo control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 5
Rone En2==
i 8908 Ambassador Row, Dallas, TX 75247
770~ W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303484
Project No.: 0713408
Date of Service: 10/30/2007
Report Date: 11/02/2007
Project: Point West VI
Coppell , Texas
Services: Straight Shaft Pier Inspection
Driller: Ague r
Pie r Id e ntifica tio n F 121 F 122 E 114 E 115 E 117
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 36.80 41.00 43.50 46.50 43.60
Depth of Bearing Stratum From Surface (ft) 31.40 35.40 38.00 41.00 38.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)" 5.40 5.60 5.50 5.50 5.60
Condition of Boll om (wet/drv) D rv Dry D rv D rv Dry
Plumb Within Tolerance (ves I no) Yes Yes Yes Yes Yes
Casing Diameter(in) ICasing Length (ft) 30 30 30 30 30
NumberofBars/Reinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 35.70 40.00 42.50 45.50 42.60
Time Drilling was Comoleted (am 10m) 10:30AM 10:50AM 11:15AM 1 2 :0 0 P M 1 2:20 PM
Time Concrete was Placed (am Ipm) 12:45 PM 1 :00 PM 1:15 PM 1 :50 PM 2:15 PM
Depth of Pier From Top of Concrete (ft) 36.30 40.50 43.00 46.00 43.10
E Ie va tio n: S urfa ce (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 62.70 58.50 56.00 53.00 55.90
Elevation: Top ofBearinll Stratum (ft.)"" 68.10 64.10 61.50 58.50 61.50
Bearinll Stratum (descriotion) Grav shale
Note: See report# NA for Compressive Strength TestSpecirriens.
"Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have mo control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfKW) Page 2 of 5
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
770~ W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Orilled Pier Inspection
Report No.: 303484
Project No.: 0713408
Date of Service: 10/30/2007
Report Date: 11/02/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auoer
Pie rid e ntifica tio n E 119 E 120 E 12 1 E 12 2 E 116
Pie r D i am e te r (i n) 24 24 24 24 24
Deoth of Pier From S u rfa ce (ft) 42.00 41.00 42.00 41.00 44.30
Deoth ofBearino Stratum From S u rfa c e (ft) 36.50 34.00 36.00 35.00 38.30
Reouired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tratio n (ft)" 5.50 7.00 6.00 6.00 6.00
Condition of Bottom (wet/dry) D rv D rv D rv D rv Dry
Plumb WithinTolerance (yes Ino) Yes Yes Yes Yes Yes
Casino Diameter(in)/Casina Lenath(ft) 2 6/3 5 2 6 13 4 2 6/3 5 2 6/3 2 2 6 13 7
NumberofBars IReinforcino BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Le noth of Re info rcino S te e I (ft) 41.00 40.00 41.00 40.00 43.30
Time Drillino was Comoleted (am 10m) 1 :20 P M 2:00 PM 2:30 P M 3 :0 5 PM 1 2 :45 P M
Time Concrete was Placed (am 10m) 3 :2 6 P M 3:15 PM 3:30 PM 3 :4 0 P M 2:00 PM
Depth of Pier From Too of Concrete (ft) 41.50 40.50 41.50 40.50 43.80
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (m" 5 7.50 58.50 57.50 58.50 55.20
Elevation: Top of Bear in a Stratum (fU" 6 3.00 65.50 63.50 64.50 61.20
Bearina Stratum (descriotion) G ra v s h:ll Ie
Not e: See re port # NA for Compressive Strength Test Specimens.
. Additional Penetration not requested unless noted. HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume mo responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approv~1 of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 5
Rone Engineering
..
, 8908 Ambassador Row, Dallas, TX 75247
77d1 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630.9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303484
Project No.: 0713408
Date of Service: 10/30/2007
Report Diilte: 11/02/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A ua e r
Pie r Id e n ti fi c a ti 0 n E /18 D /1 4 D /15 D /16 D /17
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From Surface (ft) 43.80 45.00 46.40 44.50 45.00
Depth ofBearino Stratum Fro m S urfa ce (ft) 38.00 39.50 40.00 37.40 38.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft). 5.80 5.50 6.40 7.10 7.00
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes /no) Yes Yes Yes Yes Yes
CasinQ Diameter{in)/Casina Lenoth(ft) 2 6/3 7 2 6/3 6 2 6 /3 9 26/36.5 26/3 7
NumberofBars /Reinforcino BarSize 6 / #6 6 / #6 6 / #6 6 / #6 6 1#6
Length of Reinforcing Steel (ft) 42.80 44.00 45.40 43.50 44.00
Time Drillino was Completed (am /pm) 1 :00 PM 3:30 P M 3 :45 P M 4:00 PM 4 :20 P M
Time Concrete was Placed (am Ipm) 2 :5 0 P M 4:30 PM 4 :4 5 P M 5:00 PM 5 :2 5 P M
Depth of Pier Fro m Top of Concrete (ft) 43.30 44.50 45.90 44.00 44.50
E Ie va lio n: S u rfa ce (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)" 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft).. 55.70 54.50 53.10 55.00 54.50
E Ie va ti 0 n: Top of Bearino Stratum (ft.)" 61.50 60.00 59.50 62.10 61.50
Bearing Stratum (description) G ra y s h aile
Note: See report # NA for Com pressive Strength Test Specim ens.
. Additional Penetration not requested unless noted. HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume 1110 responsibility for variation in quality
(composition, appearance, etc.) or any other feature of "similar subject matter provided by persons or conditions over which we have hO control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfKW) Page 4 of 5
Rone En~==
i 8908 Ambassador Row, Dallas, TX 75247
77~1 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 303484
Project No.: 0713408
Date of Service: 10/30/2007
Report Date: 11/02/2007
Project: Point West VI
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A Ug e r
Pie rid e ntifica tio n D 118
PierDiameter(in) 24
DeothofPierFrom Surface (ft) 42.00
Death of Bear in a Stratum Fro m Surface(ft) 35.50
Reauired Penetration (ft) 5.00
Actual Penetration (ft)' 6.50
Condition of Bottom (wet I d rv) D rv
Plumb Within Tolerance (ves Ino) Yes
Casino Diameter(in)/Casing Length(ft) 26/36
NumberofBars IReinforcing BarSize 6 1#6
Le ng th of R e info rcing S tee I (ft) 41.00
Time Drillina was Comoleted (am 10m) 4:18 PM
Time Concrete was Placed (am Ipm) 6:30 PM
Death of Pier From Too of Concrete (ft) 41.50
Elevation: Surface (ft).. 99.50
Elevation: Top of Pier (ft).. 99.00
Elevation: Bottom of Pier (fO" 5 7.50
Elevation: Too of Bearing Stratum (ft.)" 64.00
Bearino Stratum (descriotion) G ra v s h a Ie
Not e: See re port # NA fo reo m pre s s ive S t re n 9 t h T e s I S pee i men s .
. Additional Penetration not requested unless noted. "E levation by others
Technician: Denny Harris Started: 07:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Finished: 07:15pm Rone Engineering
p~
~
K. Scott Watson, AET
Projeat Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume 1)0 responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have J!l0 control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(CH/KW) Page 5 of 5
Rone Engineering
.
. 8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 303578
Project No.: 0713408
Date of Service: 10/30/2007
Report Date: 11/02/2007
Project: Point West VI
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Slab on grade, grid lines J-L/12-22
nem s Ins peeled: Conforming Non Ilem s Ins peeled: Conforming Non Items Inspected: Conforming Non
Conforming Co nfo rm ing Conforming
P lacing Drawings Bar lenglh Column Ties Properly
Approved x and Shape x Tied and S p;aced NA
Bar Size x Proper Bar Placement x Stirrup SpaQing NA
Bar Grade x Properly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x lapped Splices x
Form Clean x P roper Bar Supports x ComerBar& NA
Numberof Bars x P roper Cover x M echanical,Splices NA
Discrepancies I Comments:
1. Diamond dowels used (began placing steel at3:00pm)
No apparent discrepancies were noted at the locations listed aoove.
Technician: Bruce Eberts Started: 03:15pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Finished: 06:15pm Rone engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume nO responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have rlo control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
771111 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Reinforcing Steel Inspection
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report No.: 303287
Project No.: 0713408
Date of Service: 10/27/2007
Report Date: 11/02/2007
Project: Point West VI
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Building slab on grade. grid lines C-E/2-12
Item s Inspected: Conforming Non Items Inspected: Conforming Non Item sins peeted: Conforming Non
Conforming Conforming Co nfo rm ing
P lacing Drawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and SPl'lced NA
Bar Size x Proper Bar Placement x Stirrup Spaoing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Proper B ar Supports x Corner BarS NA
Numberof Bars x Proper Cover x M echanicalSplices NA
Discrepancies I Comments:
1. Chairs to be placed during concrete placement.
No other apparent discrepancies were noted at the locations listed above.
Technician: Clayton Snyder Started: 02:00pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc City of Coppell Attn: Mr. Lee Stone
Finished: 03:45pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume np responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have rio control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approvaji of Rone Engineering Services, ltd.
(TMIKW) Page 1 of 1