Duke Lesley 2A-LR071108
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303625
Project No.: 0712932
Date of Service: 10/31/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 340K1501
Placement Date: 10/31/2007
Weather Conditions: Clear
Time Sampled: 06:40am
Temperature - Air: 500F
Truck No: 1184
Air Content: NA
Overall Placement Location:
Panels at Point West VII (panels 42-43, 45-55, 57-58)
Measured
Slump
(inches)
5.5
Batch time: 06:09am
Concrete: 800F
Ticket No: 13600659
Unit Weight (pet): NA
Sample Location:
Panel 42
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
1 1 11/07/2007
1 2 11/28/2007
1 3 11/28/2007
1 4 12/26/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Remarks: Water added at site: 10 gallons
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
88,640
Compressive
Strength
(psi)
3,130
Fracture
Type
Cone/Split
Area
(in')
28.27
LIMITATIONS: The test results presented herein wene prepaned based upon the specific samples provided for testing. We assume! no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we havE! no control. . Our letters and reports are
for the exclusive use of the clients to whom they are addnessed and shall not be reproduced except in full without the written appro~al of Rone Engineering Services, Ltd.
(JB/JB) Page 1 of 4
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
770~ W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303625
Project No.: 0712932
Date of Service: 10/31/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 340K1501
Placement Date: 10/31/2007
Weather Conditions: Sunny, clear
Time Sampled: 08:00am Batch time: 07:34am
Temperature - Air: 600F Concrete: 800F
Truck No: 1184 Tidket No: 13600679
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Panels at Point West VII (panels 42-43, 45-55, 57-58)
Measured
Slump
(inches)
5.0
Sample Location:
Panel 45
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load $tren Fracture
Set No. Tested (days) (in) (in') (Ibs) i) Type
2 1 11/07/2007 7 6.00 28.27 9 3,430 Cone/Split
11/28/2007 28 .-
2 2
2 3 11/28/2007 28
2 4 12/26/2007 56
Remarks: Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav, no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(JB/JB) Page 2 of 4
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303625
Project No.: 0712932
Date of Service: 10/31/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Req uirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 340K1501
Placement Date: 10/31/2007
Weather Conditions: Sunny, clear
Time Sampled: Batch time: 06:09am
Temperature - Air: 650F Concrete: 860F
Truck No: 1008 Tioket No: 1300692
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Panels at Point West VII (panels 42-43, 45-55, 57-58)
Measured
Slump
(inches)
5.75
Sample Location:
Panel 48
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 11/07/2007 7 6.00 28.27 86,570 3,060 Cone/Split
3 2 11/28/2007 28
3 3 11/28/2007 28
3 4 12/26/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(JB/JB) Page 3 of 4
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
, 8908 Ambassador Row, Dallas, TX 75247
77011 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303625
Project No.: 0712932
Date of Service: 10/31/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Batch time: 10:02am
Concrete: 860F
Tioket No: 13600711
Unit Weight (pet): NA
Measured
Slump
(inches)
5.5
Mix Design I.D.: 340K1501
Placement Date: 10/31/2007
Weather Conditions: Clear
Time Sampled: 1 0:45am
Temperature - Air: 650F
Truck No: 1039
Air Content: NA
Overall Placement Location:
Panels at Point West VII (panels 42-43,45-55, 57-58)
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
89,840
Area
(in2)
28.27
Sample Location:
Panel 54
REPORT OF TESTS
Compressive
Strength
(psi)
3,180
Fracture
Type
Cone/Split
Cylinder
Marked Date
Set No. Tested
4 1 11/07/2007
4 2 11/28/2007
4 3 11/28/2007
4 4 12/26/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Finished: 12:30pm RoneEngineering
p~~
Technician: Montreal Bailey Started: 05:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(JB/JB) Page 4 of 4
Rone Engineering
.-
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Partly cloudy
Time Sampled: 03:45am Batch time: 03:34am
Temperature - Air: 740F Concrete: 810F
Truck No: 135 Ticket No: 14576
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Measured
Slump
(inches)
4.5
Sample Location:
Grid lines C.2/21.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/16/2007 7 6.00 28.27 128,480 4,540 Shear
1 2 11/06/2007 28 6.00 28.27 155,480 5,500 Cone/Shear
1 3 11/06/2007 28 6.00 28.27 155,990 5,520 Cone/Split
Average 5,510
1 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
{TMIED} Page 1 of 9
Rone Eng.ineering
.-
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Partly cloudy
Time Sampled: 04:45am Batch time: 04:31am
Temperature - Air: 750F Concrete: 810F
Truck No: 137 Ticket No: 14586
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Measured
Slump
(inches)
5.0
Sample Location:
Grid lines C.2/23
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 10/16/2007 7 6.00 28.27 118,880 4,200 Cone/Split
2 2 11/06/2007 28 6.00 28.27 149,220 5,280 Cone/Split
2 3 11/06/2007 28 6.00 28.27 144,720 5,120 Cone/Split
Average 5,200
2 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/ED) Page 2 of 9
Rone En~==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Req uirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Partly cloudy
Time Sampled: 05:40am Batch time: 05:23am
Temperature - Air: 750F Concrete: 810F
Truck No: 125 Ticket No: 14596
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Slab on building, grid lines G-E/21-30
Measured
Slump
(inches)
4.0
Sample Location:
Grid lines D/23.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in") (Ibs) (psi) Type
3 1 10/16/2007 7 6.00 28.27 122,220 4,320 Cone/Split
3 2 11/06/2007 28 6.00 28.27 157,420 5,570 Cone/Split
3 3 11/06/2007 28 6.00 28.27 155,730 5,510 Cone/Split
Average 5,540
3 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced elCCept in full without the written approval of Rone Engineering Services, Ltd.
(TMIED) Page 3 oft
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, Sle 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report N,o.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Partly cloudy
Time Sampled: 06:30am Batch time: 06:20am
Temperature - Air: 740F Concrete: 800F
Truck No: 135 Ticket No: 14606
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Measured
Slump
(inches)
4.25
Sample Location:
Grid lines 0.2125.1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
4 1 10/16/2007 7 6.00 28.27 115,610 4,090 Shear
4 2 11/06/2007 28 6.00 28.27 132,120 4,670 Cone/Split
4 3 11/06/2007 28 6.00 28.27 138,330 4,890 Cone/Split
Average 4,780
4 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIED) Page 4 of 9
Rone Eni==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Partly cloudy
Time Sampled: 08:05am Batch time: 07:51am
Temperature - Air: 760F Concrete: 810F
Truck No: 144 Ticket No: 14616
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Measured
Slump
(inches)
4.0
Sample Location:
Grid lines 0.3/26.1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (i",) (Ibs) (psi) Type
5 1 10/16/2007 7 6.00 28.27 119,300 4,220 Shear
5 2 11/06/2007 28 6.00 28.27 138,740 4,910 Cone/Split
5 3 11/06/2007 28 6.00 28.27 153,620 5,430 Cone/Split
Average 5,170
5 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/ED) Page 5 of 9
Rone En2==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Partly cloudy
Time Sampled: 09:10am Batch time: 08:57am
Temperature - Air: 760F Concrete: 810F
Truck No: 102 Ticket No: 14628
Air Content: NA Unit Weight (pct): NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Measured
Slump
(inches)
4.0
Sample Location:
Grid lines 0.8/27
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
6 1 10/16/2007 7 6.00 28.27 113,760 4,020 Shear
6 2 11/06/2007 28 6.00 28.27 146,690 5,190 Shear
6 3 11/06/2007 28 6.00 28.27 153,400 5,430 Cone/Split
Average 5,310
6 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIED) Page 6 of 9
Rone En2~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM.C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Sunny
Time Sampled: 10: 15am
Temperature - Air: 760F
Truck No: 134
Air Content: NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Batch time: 09:57am
Concrete: 810F
Ticket No: 14639
Unit Weight (pct): NA
Measured
Slump
(inches)
4.25
Sample Location:
Grid lines C.5/28
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
7 1 10/16/2007 7 6.00 28.27 120,030 4,250 Cone/Split
7 2 11/06/2007 28 6.00 28.27 150,220 5,310 Shear
7 3 11/06/2007 28 6.00 28.27 142,280 5,030 Shear
Average 5,170
7 4 12/04/2007 56
L1MrrA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in Quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. ltd.
(TMfED) Page 7 of 9
Rone En~~
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Pla<;ement Date: 10/09/2007
Weather Conditions: Sunny
Time Sampled: 11: 15am
Temperature - Air: nOF
Truck No: 142
Air Content: NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Batch time: 11 :04am
Concrete: 820F
Ticket No: 14651
Unit Weight (pet): NA
Measured
Slump
(inches)
3.75
Sample Location:
Grid lines D.1/29
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
8 1 10/16/2007 7 6.00 28.27 108,250 3,830 Shear
8 2 11/06/2007 28 6.00 28.27 143,760 5,080 Cone/Split
8 3 11/06/2007 28 6.00 28.27 142,370 5,040 Cone/Split
Average 5,060
8 4 12/04/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIED) Page 8 of I
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301473
Project No.: 0712932
Date of Service: 10/09/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,500 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 10/09/2007
Weather Conditions: Sunny
Time Sampled: 12:30pm
Temperature - Air: 770F
Truck No: 142
Air Content: NA
Overall Placement Location:
Slab on building, grid lines C-E/21-30
Batch time:
Concrete: 820F
Ticket No: 14661
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.5
Sample Location:
Grid lines C/30
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 10/16/2007 7 6.00 28.27 101,180 3,580 Shear
9 2 11/06/2007 28 6.00 28.27 130,1 00 4,600 Cone/Split
9 3 11/06/2007 28 6.00 28.27 129,240 4,570 Cone/Split
Average 4,590
9 4 12/04/2007 56
Started: 02:30am Finished: 02:00pm
Technician: Brad Hickman
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Rone Engineering
p~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TM/ED) Page 9 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303555
Project No.: 0712932
Date of Service: 10/30/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751PW
Placement Date: 10/30/2007
Weather Conditions: Clear, light wind
Time Sampled: 10:30am Batch time: 10:08am
Temperature - Air: 650F Concrete: 730F
Truck No: 126 Ticket No: 15218
Air Content: NA Unit Weight (pct): NA
Overall Placement Location:
Piers (see report #303554)
Measured
Slump
(inches)
6.5
Sample Location:
Same as above
REPORT OF TESTS
Technician: Tommy Carver Rone Engineering
See Report 303554 for technician time~~
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byme " """. " "
(1-ec copy) "
1-cc p~tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Attn: Mr. Lee Stone Project Manager
1-cc City of Coppell Attn: Mr. Larry Davis
Cylinder
Marked Date
Set No. Tested
1 1 11/06/2007
1 2 11/27/2007
1 3 11/27/2007
1 4 12/25/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
91,820
Compressive
Strength
(psi)
3,250
Fracture
Type
Cone/Split
Area
(inZ)
28.27
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlJB) Page 1 of 1
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 301583
Project No.: 0712932
Date of Service: 10/10/2007
Report Date: 11/08/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7751 PW
Placement Date: 10/10/2007
Weather Conditions: Clear
Time Sampled: 09:30am
Temperature - Air: 640F
Truck No: 110
Air Content: NA
Overall Placement Location:
Piers (see report #301582)
Batch time: 09:05am
Concrete: 720F
Ticket No: 7872
Unit Weight (pet): NA
Measured
Slump
(inches)
7.5
Sample Location:
Pier A/26.2
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/17/2007 7 6.00 28.27 74,980 2,650 Cone/Split
1 2 10/17/2007 7 6.00 28.27 76,070 2,690 Cone/Split
Average 2,670
1 3 11/07/2007 28 6.00 28.27 115,570 4,090 Cone/Split
1 4 11/07/2007 28 6.00 28.27 110,070 3,890 Cone/Split
Average 3,990
1 5 12/05/2007 56
Technician: Chris Harbour Rone Engineering
See Report 301582 for technician timep ~
Report Distribution: . ~. ---...
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byme . ..... ~
(1-ec copy) -
1-cc Potter Concrete Attn: Mr. Ryan Skelly K S tt w t AET
1-cc City of Coppell Attn: Mr. Lee Stone . p ~ ct ~ son,
1-cc City of Coppell Attn: Mr. Larry Davis rOJe anager
L1MrrATloNS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlED) Page 1 of 1