Loading...
Duke Lesley 2A-LR071107 h II 8908 Ambassador Row, Dallas, TX 75247 77d1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Rone Engineering . Report of Concrete Compressive Strength Test Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Project: Hemis ere's at Point West Copp I, Texas Services: Obtain s pies of fresh concrete at the placement . s, perform required testing, cast compr~ssive strength samples and bring samples back to the laboratory for curing and testin in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Mix Design 1.0.: 7753PW Concrete Supplier: Potter Concrete Placement Date: 10/29/2007 Plant: 1 Weather Conditions: Clear Specification Requirements Time Sampled: 03: 10am Strength: 4,000 psi @ 28 days Temperature - Air: 500F Slump (in.): 4" - 6" Truck No: 140 Air (%): 3% - 5% Air Content: 4.1 % Test Method: ASTM C-172 Overall Placement Location: ASTM C-31 (except 10.1.2) Paving 0 ASTM C-143 II. ,1:. ~i~ g:!~4 C I. D Sample Location: . ~ It ~ ASTM C-39 rllC,,;C 275' north, 300' west from northeast building <;orner REPORT OF TESTS S..tch time: 02:57am Cqncrete: 800F Ti~ket No: 15069 Unit Weight (pet): NA Measured Slump (inches) 5.25 Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Cqmpressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 11/05/2007 7 6.00 28.27 123,950 4,380 Shear 1 2 11/26/2007 28 1 3 11/26/2007 28 4 12/24/2007 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we halfe no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/JB) Page 1 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 i 8908 Ambassador Row, Dallas, TX 75247 77Q1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Com~ressive Strength Test i Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Oate: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Req uirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Clear Time Sampled: 04:45am Temperature - Air: 500F Truck No: 138 Air Content: 4.3% Overall Placement Location: Paving BaJch time: 04:27am Colncrete: 800F Tidket No: 15081 Unlit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 215' north, 275' west from northeast building cprner Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 120,440 Area (in') 28.27 REPORT OF TESTS Compressive Strength (psi) 4,260 Fracture Type Cone/Split Cylinder Marked Date Set No. Tested 2 1 11/05/2007 2 2 11/26/2007 2 3 11/26/2007 2 4 12/24/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we havE/ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written apprO\lal of Rone Engineering Services, Ltd. (JB/JB) Page 2 of 9 Rone Eni~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 i 8908 Ambassador Row, Dallas, TX 75247 77d1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Com@ressive Strength Test Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre~sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Clear Time Sampled: 05:30am Temperature - Air: 520F Truck No: 138 Air Content: 4.5% Overall Placement Location: Paving Balch time: 05:16am C~ncrete: 800F Tidket No: 15090 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: 250' north, 220' west from northeast building ClOrner REPORT OF TESTS Cylinder Marked Date Set No. Tested 3 1 11/05/2007 3 2 11/26/2007 3 3 11/26/2007 3 4 12/24/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 10 gallons Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 124,470 Compressive Strength (psi) 4,400 Fracture Type Cone/Split Area (in') 28.27 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum, no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approyal of Rone Engineering Services, Ltd. (JB/JB) Page 3 of9 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 ! 8908 Ambassador Row, Dallas, TX 75247 770~ W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report NO.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Clear Time Sampled: 07:30am Temperature - Air: 520F Truck No: 138 Air Content: 4.1 % Overall Placement Location: Paving Batch time: 07: 12am Concrete: 800F Tiqket No: 15100 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 200' north, 180 west from northeast building cq>mer REPORT OF TESTS Cylinder Marked Date Set No. Tested 4 1 11/05/2007 4 2 11/26/2007 4 3 11/26/2007 4 4 12/24/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 97,610 Cotnpressive $trength (psi) 3,450 Fracture Type Shear Area (in') 28.27 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appro~al of Rone Engineering Services, Ltd. (JB/JB) Page 4 of 9 Rone Engineering .- Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 ! 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303322 Project Nlo.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell , Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Sunny, clear Time Sampled: 09:30am Batch time: 09:01am Temperature - Air: 560F Concrete: 840F Truck No: 138 Tidket No: 15112 Air Content: 4.7% UnIt Weight (pet): NA Overall Placement Location: Paving Measured Slump (inches) 5.25 Sample Location: 180' north, 150' west from northeast building comer REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Co,n press ive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 11/05/2007 7 6.00 28.27 94,610 3,350 Cone/Split 5 2 11/26/2007 28 5 3 11/26/2007 28 5 4 12/24/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum, no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approyal of Rone Engineering Services, Ltd. (JB/JB) Page 5 of 9 . Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 I 8908 Ambassador Row, Dallas, TX 75247 77~1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Sunny, clear Time Sampled: 10:15am Batch time: 09:51am Temperature - Air: 600F Concrete: 860F Truck No: 118 TidketNo: 15120 Air Content: 4.5% Unit Weight (pet): NA Overall Placement Location: Paving Measured Slump (inches) 5.5 Sample Location: 215' north, 125' west from northeast building corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 11/05/2007 7 6.00 28.27 98,410 3,480 Shear 6 2 11/26/2007 28 6 3 11/26/2007 28 6 4 12/24/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assumE! no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approl(al of Rone Engineering Services, Ltd. (JB/JB) Page 6 019 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 , 8908 Ambassador Row, Dallas, TX 75247 77d1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Sunny, clear Time Sampled: 12:00pm Ba~ch time: 11 :24am Temperature - Air: 650F Co.,crete: 860F Truck No: 138 Ticket No: 15131 Air Content: 4.6% Unlit Weight (pet): NA Overall Placement Location: Paving Measured Slump (inches) 5.0 Sample Location: 200' north, 100' west from northeast building comer REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Co~pressive Marked Date Age Diameter Area Load $trength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 7 1 11/05/2007 7 6.00 28.27 102,000 3,610 Cone/Shear 7 2 11/26/2007 28 7 3 11/26/2007 28 7 4 12/24/2007 56 Remarks: Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/JB) Page 7 of 9 Rone En2~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 i 8908 Ambassador Row, Dallas, TX 75247 77d1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast comprelSsive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Req uirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Sunny, clear Time Sampled: 01:00pm Balch time: 12:28pm Temperature - Air: 700F Concrete: 860F Truck No: 140 Ticket No: 15069 Air Content: 4.1 % Unit Weight (pcf): NA Overall Placement Location: Paving Measured Slump (inches) 5.25 Sample Location: 250' north, 70' west from northeast building celmer REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 8 1 11/05/2007 7 6.00 28.27 103,550 3,660 Shear 8 2 11/26/2007 28 8 3 11/26/2007 28 8 4 12/24/2007 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we ha~ no control. Our letters and reports are for the exclusive use of the dients to whom they are addressed and shall not be reproduced except in full without the written appro~al of Rone Engineering Services, Ltd. (JBIJB) Page 8 of 9 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 ! 8908 Ambassador Row, Dallas, TX 75247 77d1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303322 Project No.: 0712932 Date of Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast comprelisive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753PW Placement Date: 10/29/2007 Weather Conditions: Sunny, clear Time Sampled: 02:10pm BaJch time: 01:43pm Temperature - Air: 700F Colncrete: 860F Truck No: 140 Ticket No: 15069 Air Content: 4.3% Unlit Weight (pet): NA Overall Placement Location: Paving Measured Slump (inches) 5.25 Sample Location: 215' north, 40' west from northeast building cqrner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Co~pressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 9 1 11/05/2007 7 6.00 28.27 108,530 3,840 Cone/Split 9 2 11/26/2007 28 9 3 11/26/2007 28 9 4 12/24/2007 56 Remarks: Water added at site: 5 gallons Started: 02:00am Finished: 04:15pm Technician: Montreal Bailey Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byme (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone; Engineering p~ ~ K. Scolil Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assumE! no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appro\l'al of Rone Engineering Services, Ltd. (JB/JB) Page 9 of 9 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303303 Project No.: 0712932 Date ot Service: 10/29/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 10/29/2007 Weather Conditions: Clear, calm Time Sampled: 09:45am Batch time: 09: 12am Temperature - Air: 640F Concrete: 770F Truck No: 109 Ticj(et No: 15114 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers (see report #303302) Measured Slump (inches) 6.0 Sample Location: Pier N1.5 REPORT OF TESTS Technician: Tommy Carver RoneEngineering See Report 303302 for technician time~ ~ Report Distribution: ' ~ Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne .. ~ '.. .. . (1-eccopy) - 1-cc p~tter Concrete Attn: Mr. Ryan Skelly K. ScoU Watson AET 1-cc City of Coppell Attn: Mr. Lee Stone p .$(;t Mana' 1-cc City of Coppell Attn: Mr. Larry Davis ro) ger Cylinder Marked Date Set No. Tested 1 1 11/05/2007 1 2 11/26/2007 1 3 11/26/2007 1 4 12/24/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 70,230 COl1lpressive Strength (psi) 2,480 Fracture Type Cone/Split Area (in") 28.27 ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav$ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appro'i'al of Rone Engineering Services, Ltd. (TM/JB) Page 1 of 1 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 i 8908 Ambassador Row, Dallas, TX 75247 770~ W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test I Report Np.: 301306 Project ~o.: 0712932 Date of Service: 10/08/2007 Report D~te: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre~sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 SpecifICation Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 07:55am Temperature - Air: 760F Truck No: 143 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Ba~ch time: 07:37am Co~crete: 800F TiGket No: 14530 Unlit Weight (pet): NA Measu red Slump (inches) 5.0 Sample Location: Grid lines G.3/27.5 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum c1mpreSSive Marked Date Age Diameter Area Load trength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/15/2007 7 6.00 28.27 109,610 3,880 Cone/Split 1 2 11/05/2007 28 6.00 28.27 127,860 4,520 Shear 1 3 11/05/2007 28 6.00 28.27 137,930 4,880 Cone/Split Average 4,700 1 4 12/03/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assumr' no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hay no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appro al of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 4 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 I 8908 Ambassador Row, Dallas, TX 75247 770~ W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test i Report Np.: 301306 Project No.: 0712932 Date of Service: 10/08/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre1>sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 08:48am Temperature - Air: 760F Truck No: 133 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Ba~ch time: 08:33am Colncrete: 810F Tiqket No: 14540 Unlit Weight (pct): NA Measured Slump (inches) 4.75 Sample Location: Grid lines G.2/28.6 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum C~mpressive Marked Date Age Diameter Area Load $trength Fracture Set No. Tested ( days) (in) (in') (Ibs) (psi) Type 2 1 10/15/2007 7 6.00 28.27 123,490 4,370 Cone/Split 2 2 11/05/2007 28 6.00 28.27 148,090 5,240 Cone/Shear 2 3 11/05/2007 28 6.00 28.27 141,980 5,020 Cone/Split Average 5,130 2 4 12/03/2007 56 LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum$ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approyal of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 4 Rone En2== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 I 8908 Ambassador Row, Dallas, TX 75247 770~ W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test I Report Nb.: 301306 Project No.: 0712932 Date of Service: 10/08/2007 Report D~te: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 10:30am Temperature - Air: 760F Truck No: 143 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Batch time: 10:21am COin crete: 830F Tidket No: 14554 Unlit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: Grid lines H.1/29.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum C~mpressive Marked Date Age Diameter Area Load $trength Fracture Set No. Tested (days) (in) (in") (Ibs) (psi) Type 3 1 10/15/2007 7 6.00 28.27 113,500 4,010 Cone/Split 3 2 11/05/2007 28 6.00 28.27 137,670 4,870 Cone/Split 3 3 11/05/2007 28 6.00 28.27 131,550 4,650 Shear Average 4,760 3 4 12/03/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we ha~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appro~al of Rone Engineering Services, Ltd. (TMIKW) Page 3 of 4 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 , i 8908 Ambassador Row, Dallas, TX 75247 770. W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Com~ressive Strength Test Report Np.: 301306 Project No.: 0712932 Date of S~rvice: 10/08/2007 Report D~te: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9349 PW Placement Date: 10/08/2007 Weather Conditions: Cloudy Time Sampled: 1 0:49am Temperature - Air: 810F Truck No: 133 Air Content: NA Overall Placement Location: Slab on building, grid lines G-J/26.9-30 Ba~ch time: 10:34am COl1crete: 860F Ti~ket No: 14556 Un't Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: Grid lines G/29.9 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load $trength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 10/15/2007 7 6.00 28.27 97,890 3,460 Cone/Split 4 2 11/05/2007 28 6.00 28.27 115,430 4,080 Cone/Shear 4 3 11/05/2007 28 6.00 28.27 122,160 4,320 Cone/Split Average 4,200 4 4 12/03/2007 56 Started: 06:15am Finished: 12:15pm Technician: Brad Hickman Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppel! Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Ronei Engineering ~~ K. Sco~ Watson, AET Proj$ct Manager L1MrrA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hav~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approyal of Rone Engineering Services, Ltd. (TM/KW) Page 4 of 4 Rone Eni~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 i 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test i Report No.: 301291 Project No.: 0712932 Date of S~rvice: 10/08/2007 Report D~te: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751PW Placement Date: 10/08/2007 Weather Conditions: Partly cloudy Time Sampled: 09:20am Ba*ch time: 09:11am Temperature - Air: 800F Cor-crete: 890F Truck No: 136 Tidket No: 14599 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers (see report #301290) Measured Slump (inches) 6.75 Sample Location: Pier Al12.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load ~trength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/15/2007 7 6.00 28.27 105,980 3,750 Cone/Split 1 2 10/15/2007 7 6.00 28.27 98,820 3,500 Shear Average 3,620 1 3 11/05/2007 28 6.00 28.27 132,410 4,680 Cone/Split 1 4 11/05/2007 28 6.00 28.27 127,740 4,520 Shear Average 4,600 1 5 12103/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we ha~e no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written apprqval of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 I 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301291 Project No.: 0712932 Date of S~rvice: 10/08/2007 Report D~te: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compre$sive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751PW Placement Date: 10/08/2007 Weather Conditions: Partly cloudy Time Sampled: 03:15pm Batch time: 02:48pm Temperature - Air: 860F Co~crete: 900F Truck No: 127 Tidket No: 14569 Air Content: NA Unlt Weight (pcf): NA Overall Placement Location: Piers (see report #301290) Measured Slump (inches) 7.25 Sample Location: Pier A/17.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum cotpressive Marked Date Age Diameter Area Load trength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 10/15/2007 7 6.00 28.27 99,290 3,510 Shear 2 2 10/15/2007 7 6.00 28.27 98,220 3,470 Shear Average 3,490 2 3 11/05/2007 28 6.00 28.27 116,420 4,120 Cone/Split 2 4 11/05/2007 28 6.00 28.27 118,200 4,180 Cone/Shear Average 4,150 2 5 12/03/2007 56 Technician: Chris Harbour ROnE~ Engineering See Report 301290 for technician time~ ~ Report Distribution: ~------:. Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . . ...... ... ~ (1-ec copy) . - 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Sco~ Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone p '6,..t M 1-cc City of Coppell Attn: Mr. Larry Davis ro]",,,, anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assum~ no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we ha~ no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written apprq\tal of Rone Engineering Services, Ltd. (TMIKW) Page 2 of 2 Rone Eni~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 'I 8908 Ambassador Row, Dallas, TX 75247 770,1 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test ! Report No.: 301461 Project No.: 0712932 Date of Service: 10/09/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell , Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Req uirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 10/09/2007 Weather Conditions: Clear Time Sampled: 09:05am Temperature - Air: 820F Truck No: 129 Air Content: NA Overall Placement Location: Piers (see report #301460) Batch time: 08:27am Concrete: 850F Tidket No: 14623 Un~t Weight (pct): NA Measured Slump (inches) 6.0 Sample Location: Pier A/15.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Co~pressive Marked Date Age Diameter Area Load $trength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/16/2007 7 6.00 28.27 83,560 2,960 Shear 1 2 10/16/2007 7 6.00 28.27 87,030 3,080 Cone/Split Average 3,020 1 3 11/06/2007 28 6.00 28.27 120,540 4,260 Shear 1 4 11/06/2007 28 6.00 28.27 121,440 4,300 Shear Average 4,280 1 5 12/04/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assumE! no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we hay, no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appro'fal of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassaclor Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301461 Project No.: 0712932 Date of Service: 10/09/2007 Report Date: 11/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 10/09/2007 Weather Conditions: Clear Time Sampled: 04:10pm Temperature - Air: 870F Truck No: 129 Air Content: NA Overall Placement Location: Piers (see report #301460) Batch time: 03:23pm COincrete: 880F Ticket No: 14668 Unit Weight (pet): NA Measured Slump (inches) 6.75 Sample Location: Pier N29.8 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 10/16/2007 7 6.00 28.27 92,610 3,280 Cone/Shear 2 2 10/16/2007 7 6.00 28.27 97,560 3,450 Shear Average 3,360 2 3 11/06/2007 28 6.00 28.27 104,620 3,700 Cone/Shear 2 4 11/06/2007 28 6.00 28.27 115,620 4,090 Cone/Split Average 3,890 2 5 12/04/2007 56 Technician: Chris Harbour Rone Engineering See Report 301460 for technician time~ ~ Report Distribution: ' ~ Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne rf!::ttroF .. .. . . . (1-ec copy) - 1-cc p~tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson AET 1-cc City of Coppell Attn: Mr. Lee Stone p 'eel M a' 1-cc City of Coppell Attn: Mr. Larry Davis rDJ an ger ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfKW) Page 2 of 2