Duke Lesley 2A-LR071101
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 03:55pm
Temperature - Air: 780F
Truck No: 102
Air Content: NA
Overall Placement Location:
Slab, grid lines C-E and 11-21
Batch time: 03:42pm
Concrete: 900F
Ticket No: 14247
Unit Weight (pcf): NA
Measured
Slump
(inches)
7.0
Sample Location:
C,D,E/Line 11-12
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/09/2007 7 6.00 28.27 101,870 3,600 Shear
1 2 10/30/2007 28 6.00 28.27 131,220 4,640 Cone/Split
1 3 10/30/2007 28 6.00 28.27 139,480 4,930 Cone/Split
Average 4,790
1 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 10
Rone Engineering
.
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 05:00am
Temperature - Air: 780F
Truck No: 130
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 04:38am
Concrete: 900F
Ticket No: 14257
Unit Weight (pct): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,O,E/Line 12-12.9
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 10/09/2007 7 6.00 28.27 101,360 3,580 Cone/Split
2 2 10/30/2007 28 6.00 28.27 125,140 4,430 Cone/Split
2 3 10/30/2007 28 6.00 28.27 142,820 5,050 Cone/Split
Average 4,740
2 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 2 of 10
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 05:45am
Temperature - Air: 780F
Truck No: 138
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 05:34am
Concrete: 880F
Ticket No: 14267
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,O,E/Line 12.9-13.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 10/09/2007 7 6.00 28.27 119,690 4,230 Cone/Split
3 2 10/30/2007 28 6.00 28.27 156,520 5,540 Cone/Split
3 3 10/30/2007 28 6.00 28.27 151,400 5,350 Cone/Split
Average 5,450
3 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, elC.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 3 of 10
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
n01 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/02/2007
Weather Conditions: Cloudy
Time Sampled: 07:00am
Temperature - Air: 800F
Truck No: 102
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 06:40am
Concrete: 920F
Ticket No: 14277
Unit Weight (pct): NA
Measured
Slump
(inches)
5.0
Sample Location:
C,D,E/Line 13.8-14.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 10/09/2007 7 6.00 28.27 123,210 4,360 Cone/Split
4 2 10/30/2007 28 6.00 28.27 145,000 5,130 Cone/Shear
4 3 10/30/2007 28 6.00 28.27 142,520 5,040 Cone/Split
Average 5,080
4 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 4 of 10
Rone Eni==
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/0212007
Weather Conditions: Sunny
Time Sampled: 08:00am
Temperature - Air: 800F
Truck No: 130
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 07:36am
Concrete: 880F
Ticket No: 14287
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
C,O,E/Line 14.8-15.9
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
5 1 10/09/2007 7 6,00 28.27 114,750 4,060 Cone/Split
5 2 10/30/2007 28 6.00 28.27 146,320 5,170 Cone/Split
5 3 10/30/2007 28 6.00 28.27 147,950 5,230 Shear
Average 5,200
5 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 5 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 09:40am
Temperature - Air: 800F
Truck No: 138
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 09:24am
Concrete: 900F
Ticket No: 14299
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 15.9-16.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 10/09/2007 7 6.00 28.27 114,540 4,050 Cone/Split
6 2 10/30/2007 28 6.00 28.27 140,530 4,970 Cone/Split
6 3 10/30/2007 28 6.00 28.27 144,710 5,120 Shear
Average 5,040
6 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 6 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 10:30am
Temperature - Air: 840F
Truck No: 138
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 1 0:22am
Concrete: 880F
Ticket No: 14309
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 16.8-18
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
7 1 10/09/2007 7 6.00 28.27 109,340 3,870 Cone/Split
7 2 10/30/2007 28 6.00 28.27 131,510 4,650 Shear
7 3 10/30/2007 28 6.00 28.27 134,790 4,770 Shear
Average 4,710
7 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 7 of 10
Rone Engineering
..
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 11 :45am
Temperature - Air: 860F
Truck No: 102
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 11 :28am
Concrete: 900F
Ticket No: 14321
Unit Weight (pct): NA
Measured
Slump
(inches)
7.0
Sample Location:
C,D,E/Line 18-19.2
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 10/09/2007 7 6.00 28.27 101,180 3,580 Cone/Split
8 2 10/30/2007 28 6.00 28.27 123,300 4,360 Cone/Split
8 3 10/30/2007 28 6.00 28.27 122,490 4,330 Cone/Split
Average 4,350
8 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 8 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 12:45pm
Temperature - Air: 880F
Truck No: 134
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 12:28pm
Concrete: 900F
Ticket No: 14331
Unit Weight (pet): NA
Measured
Slump
(inches)
6.0
Sample Location:
C,D,E/Line 19.2-20.4
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 10/09/2007 7 6.00 28.27 97,930 3,460 Cone/Split
9 2 10/30/2007 28 6.00 28.27 120,460 4,260 Shear
9 3 10/30/2007 28 6.00 28.27 123,390 4,360 Cone/Split
Average 4,310
9 4 11/27/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 9 of 10
Rone Engineering
.,
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300683
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/02/2007
Weather Conditions: Sunny
Time Sampled: 01 :30pm
Temperature - Air: 880F
Truck No: 134
Air Content: NA
Overall Placement Location:
Slab, gridlines C-E and 11-21
Batch time: 01:19pm
Concrete: 920F
Ticket No: 14338
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
C,D,E/Line 20.4-21
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
10 1 10/09/2007 7 6.00 28.27 109,370 3,870 Cone/Split
10 2 10/30/2007 28 6.00 28.27 125,130 4,430 Shear
10 3 10/30/2007 28 6.00 28.27 123,750 4,380 Cone/Split
Average 4,400
10 4 11/27/2007 56
Started: 02:30am Finished: 02:15pm
Technician: Denny Harris
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the dients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 10 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300662
Project No.: 0712932
Date of Service: 10/02/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751 PW
Placement Date: 10/02/2007
Weather Conditions: Few clouds
Time Sampled: 10:15am Batch time: 09:13am
Temperature - Air: 800F Concrete: 820F
Truck No: 109 Ticket No: 14297
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Building piers U9.B, K.7/0.9, K.2/0.9, J.B/0.9, H.B, H.2, G.B/1
Measured
Slump
(inches)
6.75
Sample Location:
Pier U5.B
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 10/09/2007 7 6.00 28.27 91,690 3,240 Cone/Split
1 2 10/09/2007 7 6.00 28.27 91,480 3,240 Cone/Split
Average 3,240
1 3 10/30/2007 28 6.00 28.27 117,960 4,170 Cone/Split
1 4 10/30/2007 28 6.00 28.27 126,990 4,490 Cone/Split
Average 4,330
1 5 11/27/2007 56
Technician: Chris Harbour Rone Engineering
See Report 300661 for technician time~ ~
Report Distribution: ~
Orig: Duke Construction. LP (Dallas, TX) Attn: Mr. Paul Byrne . .' . ..' ..' .'
(1-ec copy)
1-cc P~tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Attn: Mr. Lee Stone Project Manager
1-cc City of Coppell Attn: Mr. Larry Davis
:~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300838
Project No.: 0712932
Date of Service: 10/03/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 10/03/2007
Weather Conditions: Cloudy
Time Sampled: 03:55am
Temperature - Air: 800F
Truck No: 139
Air Content: NA
Overall Placement Location:
E,F,GfLine 21-30
Batch time: 03:36am
Concrete: gooF
Ticket No: 114356
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
E,F,FfLine 21-22
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
1 1 10/10/2007 7 6.00 28.27 117,840 4,170 Shear
1 2 10/31/2007 28 6.00 28.27 154,190 5,450 Cone/Split
1 3 10/31/2007 28 6.00 28.27 149,840 5,300 Cone/Split
Average 5,380
4 11/28/2007 59
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/ED) Page 1 of 3
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300838
Project No.: 0712932
Date of Service: 10/03/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/03/2007
Weather Conditions: Cloudy, scattered shower
Time Sampled: 04:45am Batch time: 04:31am
Temperature - Air: 820F Concrete: 900F
Truck No: 107 Ticket No: 14366
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
E,F,G/Line 21-30
Measured
Slump
(inches)
5.0
Sample Location:
E,F,F/Line 22-23
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 10/10/2007 7 6.00 28.27 119,690 4,230 Cone/Shear
2 2 10/31/2007 28 6.00 28.27 160,130 5,660 Cone/Split
2 3 10/31/2007 28 6.00 28.27 158,780 5,620 Shear
Average 5,640
2 4 11/28/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/ED) Page 2 of 3
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 300838
Project No.: 0712932
Date of Service: 10/03/2007
Report Date: 11/01/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349
Placement Date: 10/03/2007
Weather Conditions: Cloudy/rain
Time Sampled: 05: 15am Batch time: 05:03am
Temperature - Air: 820F Concrete: 900F
Truck No: 107 Ticket No: 14372
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
E,F,G/Line 21-30
Measured
Slump
(inches)
5.0
Sample Location:
E,F,F/Line 23-32.9/24.0
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 10/10/2007 7 6.00 28.27 111 ,430 3,940 Shear
3 2 10/31/2007 28 6.00 28.27 151,690 5,360 Cone/Shear
3 3 10/31/2007 28 6.00 28.27 158,400 5,600 Cone/Split
Average 5,480
3 4 11/28/2007 56
Finished: 08:45am
Technician: Denny Harris Started: 02:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Rone Engineering
,~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/ED) Page 3 of 3