Loading...
Duke Lesley 3C-LR071105 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301140 Project No.: 0711530 Date of Service: 10/05/2007 Report Date: 11/05/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 340K1504 Placement Date: 10/05/2007 Weather Conditions: Clear Time Sampled: 04:30am Temperature - Air: 750F Truck No: 1187 Air Content: 4.1 % Overall Placement Location: Paving, parking lot from southeast approach going west Measured Slump (inches) 5.0 Batch time: 03:46am Concrete: 940F Ticket No: 13698781 Unit Weight (pet): NA Sample Location: 15' west, 10' south from southeast approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in") (Ibs) (psi) Type 1 1 10/12/2007 7 6.00 28.27 70,180 2,480 Shear 1 2 11/02/2007 28 6.00 28.27 85,050 3,010 Shear 1 3 11/02/2007 28 6.00 28.27 85,110 3,010 Cone/Split Average 3,010 * 1 4 11/30/2007 56 * Does not comply with specified strength LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 1 of 6 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301140 Project No.: 0711530 Date of Service: 10/05/2007 Report Date: 11/05/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 340K1504 Placement Date: 10/05/2007 Weather Conditions: Clear Time Sampled: 05:30am Temperature - Air: 740F Truck No: 1033 Air Content: 2.5% Overall Placement Location: Paving, parking lot from southeast approach going west Measured Slump (inches) 5.75 Batch time: 04:43am Concrete: 930F Ticket No: 13698791 Unit Weight (pet): NA Sample Location: 110' west, 20' south from southeast approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 10/12/2007 7 6.00 28.27 91,830 3,250 Cone/Split 2 2 11/02/2007 28 6.00 28.27 3,980 Shear 2 3 11/02/2007 28 6.00 28.27 3,780 Cone/Split 3,880 * 2 4 11/30/2007 56 * Doe not comply with specified strength LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 2 of 6 Rone En2=:= Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301140 Project No.: 0711530 Date of Service: 10/05/2007 Report Date: 11/05/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 340K1504 Placement Date: 10/05/2007 Weather Conditions: Clear Time Sampled: 07:15am Temperature - Air: 740F Truck No: 1033 Air Content: 4.5% Overall Placement Location: Paving, parking lot from southeast approach going west Measured Slump (inches) 5.75 Batch time: 05:59am Concrete: 880F Ticket No: 13698806 . Unit Weight (pet): NA Sample Location: 200' west, 15' south from southeast approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 10/12/2007 7 6.00 28.27 102,350 3,620 Cone/Split 3 2 11/02/2007 28 6.00 28.27 121 , 130 4,280 Cone/Split 3 3 11/02/2007 28 6.00 28.27 117,740 4,160 Cone/Split Average 4,220 3 4 11/30/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 3 016 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301140 Project No.: 0711530 Date of Service: 10/05/2007 Report Date: 11/05/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 340K1504 Placement Date: 10/05/2007 Weather Conditions: Clear Time Sampled: 08:00am Temperature - Air: 750F Truck No: 1187 Air Content: 4.2% Overall Placement Location: Paving, parking lot from southeast approach going west Measured Slump (inches) 6.0 Batch time: 06:48am Concrete: 910F Ticket No: 13699816 Unit Weight (pet): NA Sample Location: 285' west. 15' south from southeast approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 10/12/2007 7 6.00 28.27 79,360 2,810 Cone/Shear 4 2 11/02/2007 28 6.00 28.27 90,370 3,200 Cone/Split 4 3 11/02/2007 28 6.00 28.27 93,210 3,300 Cone/Split Average 3,250 * 4 4 11/30/2007 56 * Does not comply with specified strength LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 4 of 6 Rone En~== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 n01 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301140 Project No.: 0711530 Date of Service: 10/05/2007 Report Date: 11/05/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 340K1504 Placement Date: 10/05/2007 Weather Conditions: Clear Time Sampled: 09:00am Temperature - Air: 780F Truck No: 1183 Air Content: 5.7% Overall Placement Location: Paving, parking lot from southeast approach going west Measured Slump (inches) 6.0 Batch time: 08:22am Concrete: 910F Ticket No: 13698833 Unit Weight (pet): NA Sample Location: 345' west, 5' south from southeast approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 85,280 Cylinder Marked Date Age Set No. Tested (days) 5 1 10/12/2007 7 5 2 11/02/2007 28 5 3 11/02/2007 28 5 4 11/30/2007 Diameter (in) 6.00 Area (in') 28.27 Compressive Strength (psi) 3,020 Fracture Type Cone/Split 6.00 6.00 28.27 28.27 100,540 93,990 3,560 3,320 3,440 * Cone/Split Shear ge * Does not comply with specified stren LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (lB/ED) Page 5 of 6 Rone En2~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 301140 Project No.: 0711530 Date of Service: 10/05/2007 Report Date: 11/05/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in") (Ibs) (psi) 6 1 10/12/2007 7 6.00 28.27 95,050 3,360 6 2 11/02/2007 28 6.00 28.27 112,010 3,960 6 3 11/02/2007 28 6.00 28.27 106,870 3,780 Average 3,870 * 6 4 11/30/2007 56 Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strengtl1: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 340K1504 Placement Date: 10/05/2007 Weather Conditions: Clear Time Sampled: 10:30am Temperature - Air: 840F Truck No: 1213 Air Content: 4.2% Overall Placement Location: Paving, parking lot from southeast approach going west Measured Slump (inches) 5.5 Batch time: 09:28am Concrete: 910F Ticket No: 13698845 Unit Weight (pcf): NA Sample Location: 390' west, 20' south from southeast approach Fracture Type Cone/Split Cone/Split Cone/Split * Does not comply with specified strength Remarks: Water Added at Site: 10 gallons Started: 02:00am Finished: 11 :45am Technician: Jose Villanueva Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in Quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/ED) Page 6 of 6