DR9001-CS 900816732 Deforest
Coppell, Tex~s 75019
Re: Woodside Village (Connell Skaggs Addition
Drainage Improvement Plans
Dear Ms. Daneshmand:
PACHECO KOCH
Consulting Engineers
Au~st 16, 1990
We are sending you attached, via printer, the following items:
Copies Date Description
Drainage Area Map, Dwg. No. 1004-04
2 Aug-90
2 Aug-90
Drainage Improvements, Sta 23+21-27+00, Dwg. No. 1004-05
2 Aug-90
Drainage Improvements, Sta 27+00-32+05, Dwg. No. 1004-06
2 Aug-90
Drainage Improvements, Sta 32+05-36+09, Dwg. No. 1004-07
2
Std. Construction Details, Curb Inlets, Dwi. No. 1004-08
Std. Const. Details, Single Culverts, Dwg. No. 1004-09
These items are transmitted for your review and c~ment. If the enclosures are
not as noted, or if you have any questions regarding this ~atter, please do not
hesitate to callme.
The most recent cost for this culvert, including engineering, testing and
inspection is approximately $358,000. We are now resukinitting these plans to
Dallas Concrete for a updated proposal using the modified plans.
JAK/tbj
1004-15
Sincerely,
cc: Mr. Mark Connell, Connell Dev. Co. w/eric.
1012 Park Central VII / 12750 Merit Drive / Dallas, Texas 75251 / (214) 450-4141