Loading...
DR9001-CS 900816732 Deforest Coppell, Tex~s 75019 Re: Woodside Village (Connell Skaggs Addition Drainage Improvement Plans Dear Ms. Daneshmand: PACHECO KOCH Consulting Engineers Au~st 16, 1990 We are sending you attached, via printer, the following items: Copies Date Description Drainage Area Map, Dwg. No. 1004-04 2 Aug-90 2 Aug-90 Drainage Improvements, Sta 23+21-27+00, Dwg. No. 1004-05 2 Aug-90 Drainage Improvements, Sta 27+00-32+05, Dwg. No. 1004-06 2 Aug-90 Drainage Improvements, Sta 32+05-36+09, Dwg. No. 1004-07 2 Std. Construction Details, Curb Inlets, Dwi. No. 1004-08 Std. Const. Details, Single Culverts, Dwg. No. 1004-09 These items are transmitted for your review and c~ment. If the enclosures are not as noted, or if you have any questions regarding this ~atter, please do not hesitate to callme. The most recent cost for this culvert, including engineering, testing and inspection is approximately $358,000. We are now resukinitting these plans to Dallas Concrete for a updated proposal using the modified plans. JAK/tbj 1004-15 Sincerely, cc: Mr. Mark Connell, Connell Dev. Co. w/eric. 1012 Park Central VII / 12750 Merit Drive / Dallas, Texas 75251 / (214) 450-4141