Loading...
Park West CC(15.1)-LR071108 REED EnGinEERinG ---GEOTECHNICAL AND I i3-R CiUF> ENVIRONMENTAL CONSULTANTS n~ REPORT OF FIELD DENSITY TESTS 1 /J. BMC West Addition ~ 425 Airline Drive Coppell, Texas 2424 STUTZ DR . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . fAX [214] 3500019 REPORT NO. 4 REPORT DATE: 11-08-07 REG PROJECT NO. 14935 PAGE: 2 of 2 Depth Below Field Field Test Final S. G. Density Moisture Proctor No. Date Location feet cf % 10 25 10-09-07 Bldg Pad: 125'N, 135'W(1) 1.0 86.8 30.4 2 26 Bldg Pad: 175'N, 135'W(1) 1.0 88.0 29.0 2 27 Bldg Pad: 200'N, 45'W(1) 1.0 87.4 29.8 2 28 Bldg Pad: 150'N, 45'W(1) 1.0 84.7 31.7 1 29 Bldg Pad: 100'N, 45'W(1) 1.0 86.3 30.3 1 30 Bid Pad: 50'N, 45'W 1 1.0 85.7 31.5 1 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from S.E. building corner. E-Mail Distribution: (1) BMC West Corporation/ Mr. Danny McQuary (1) Pross Design Group/ Mr. Charles Miller (1) D/B Constructors, Inc./ Mr. Michael Smith (1) BMC West Corporation/ Mr. Mike Maring (1) Hunt & Joiner/Mr. Steve Dial Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P. E. BW/cn Mail Distribution: (1) Icon Consulting Engineers/ Mr. David Gregory (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone fl.~ 1\' f,\) "P