Loading...
Park West CC(15.1)-LR071119 REED EnGinEERinG GEOTECHNICAL AND G R 0 LJ F' ENVIRONMENTAL CONSULTANTS REPORT OF FIE ENSITY TESTS BMC est Addition 5 Airline Drive Coppell, Texas REPORTED TO: BMC West Co oration 425 Airline Ive, Suite 200 Coppell, T as 75019 ATTN: Mr. Danny McQuary CONTRACTOR: D/B Constructors, Inc. Proctor No. 1 2 3 Test No. 31 32 33 34 35 36 37 38 39 40 ASTM Standard 0-698 0-698 0-698 REPORT NO. 5 REPORT DATE: 11-19-07 REG PROJECT NO. 14935 TECHNICIAN: M. Wood PAGE: 1 of 1 Descri tion Dark brown clay Yellowish brown weathered shale Dark yellowish brown clay w/limestone fra ments Optimum Moisture, % 27.0 25.7 21.1 Date Location 10-19-07 Bldg Pad: 25'S, 25'E(1) Bldg Pad: 26'S, 25'E(1) 10-29-07 Storm Line A: STA 0+50 Storm Line A: ST A 0+50 Storm Line A: ST A 0+50 Storm Line A: ST A 2+00 Storm Line A: ST A 2+00 Storm Line A: ST A 2+00 10-31-07 Storm Line B: ST A 0+75 Storm Line A: ST A 2+80 Depth Below Final S. G. feet 3.0 2.0 2.0 1.0 0.0 2.0 1.0 0.0 0.0 0.0 Field Density c 93.2 94.8 91.5 92.8 89.8 92.7 89.6 95.9 89.9 96.1 Field Moisture % 24.8 24.1 27.7 27.7 28.0 27.5 28.6 24.5 28.4 23.8 Proctor 10 3 3 2 2 2 2 2 1 1 3 Compaction Level % 95.4 97.1 97.1 98.5 95.3 98.4 95.1 98.3 97.9 98.4 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.W. corner of new addition. E-Mail Submitted by: Distribution: (1) BMC West Corporation/ Mr. Danny McQuary (1) Pross Design Group/ Mr. Charles Miller (1) D/B Constructors, Inc./ Mr. Michael Smith (1) BMC West Corporation/ Mr. Mike Maring (1) Hunt & Joiner/Mr. Steve Dial Mail Distribution: (1) Icon Consulting Engineers/ Mr. David Gregory (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone REED ENGINEERING GROUP, LTD. Original Signed By ,P. E. It )7/t? -I 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214J 3500019