Park West CC(15.1)-LR071119
REED EnGinEERinG
GEOTECHNICAL AND G R 0 LJ F'
ENVIRONMENTAL CONSULTANTS
REPORT OF FIE ENSITY TESTS
BMC est Addition
5 Airline Drive
Coppell, Texas
REPORTED TO: BMC West Co oration
425 Airline Ive, Suite 200
Coppell, T as 75019
ATTN: Mr. Danny McQuary
CONTRACTOR: D/B Constructors, Inc.
Proctor
No.
1
2
3
Test
No.
31
32
33
34
35
36
37
38
39
40
ASTM
Standard
0-698
0-698
0-698
REPORT NO. 5
REPORT DATE: 11-19-07
REG PROJECT NO. 14935
TECHNICIAN: M. Wood
PAGE: 1 of 1
Descri tion
Dark brown clay
Yellowish brown weathered shale
Dark yellowish brown clay w/limestone
fra ments
Optimum
Moisture, %
27.0
25.7
21.1
Date Location
10-19-07 Bldg Pad: 25'S, 25'E(1)
Bldg Pad: 26'S, 25'E(1)
10-29-07 Storm Line A: STA 0+50
Storm Line A: ST A 0+50
Storm Line A: ST A 0+50
Storm Line A: ST A 2+00
Storm Line A: ST A 2+00
Storm Line A: ST A 2+00
10-31-07 Storm Line B: ST A 0+75
Storm Line A: ST A 2+80
Depth
Below
Final S. G.
feet
3.0
2.0
2.0
1.0
0.0
2.0
1.0
0.0
0.0
0.0
Field
Density
c
93.2
94.8
91.5
92.8
89.8
92.7
89.6
95.9
89.9
96.1
Field
Moisture
%
24.8
24.1
27.7
27.7
28.0
27.5
28.6
24.5
28.4
23.8
Proctor
10
3
3
2
2
2
2
2
1
1
3
Compaction
Level %
95.4
97.1
97.1
98.5
95.3
98.4
95.1
98.3
97.9
98.4
Comments: Where tested, materials were in compliance with project specifications.
Footnote: (1) Measurements referenced from N.W. corner of new addition.
E-Mail Submitted by:
Distribution: (1) BMC West Corporation/
Mr. Danny McQuary
(1) Pross Design Group/
Mr. Charles Miller
(1) D/B Constructors, Inc./
Mr. Michael Smith
(1) BMC West Corporation/
Mr. Mike Maring
(1) Hunt & Joiner/Mr. Steve Dial
Mail
Distribution:
(1) Icon Consulting Engineers/
Mr. David Gregory
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
REED ENGINEERING GROUP, LTD.
Original Signed By
,P. E.
It )7/t?
-I
2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . FAX [214J 3500019