Loading...
SS9402A-CS 960417 The City With A Beautiful Future s P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 17, 1996 Joe W. Ezzell, P.E. HDR Engineering, Inc. 12700 Hillcrest Road, Suite 125 Dallas, Texas 75230-2096 RE: Grapevine Creek Sanitary Sewer Project SS 94-02A Dear Joe: Enclosed is the change order for the sanitary sewer line shown on Sheet 5A of the referenced project. This change order was required due to an error in the design. The items shown in the change order are new or existing items needed to construct the sanitary sewer line shown on the revised Sheet 5A. These additional items were not a part of the original contract documents, therefore requiring a change order. We are sending this change order for your information. In response to your verbal agreement to assume responsibility for additional cost please forward check to the City of Coppell for $5,709.00. Sincerely, tw~ Michael A. Martin, E.I.T. Assistant City Manager CITY OF COPPELL -lIANGE OR EXTRA WORK ORr-l PROJECT: Grapevine III Sanitary Sewer Project / SS 94-02A CONTRACTOR: River Valley Enterprises OWNER: City of Coppell CHANGE ORDER NO.: DATE: March 26, 1996 CHANGE OR EXTRA WORK TO BE DONE Pay Description Quantity Unit Unit Total Item # Price ly<.lO, 0':- ADD: 5 Furnish & Place 8" PVC Sewer 32 LF 45.00 (15'-20' depth) r-./ 0 ~ 38 Trench Excavation Safety 32 LF 2.00 (p ~ 42 Concrete Channel Replacement 50 LF 31.50 / t(;;s. ~" ,'-v b 5/). ,J";' 43 Remove Existing 8" SS 26 LF ;;2S. Iv 8(). ~ (P Y6 ~~I 44 Concrete Fill Existing 4'MH EA ,i; fSD- ~ {" 45 Lower Invert Elevation EA 1 so. Total Revision to Contract Amount .s 767: c; Previous contract amount Revised contract amount Net increase in contract time of completion Revised Contract time of completion cJ s JAYS / '-/ ~ CA I. )A <f5 $ 365,124.00 ~ 7 09. IS:) ell 37t), s> 33 Net increase in contract amount The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. "' Date: .4Jf(3.91o reed to by the Contractor: /(/J lJuf- Date: !-...3 - 76 y the Owner: Date: Y'--/tf-- ~v