SS9402A-CS 960417
The City With A Beautiful Future
s
P.O. Box 478
Coppell, Texas 75019
214-462-0022
April 17, 1996
Joe W. Ezzell, P.E.
HDR Engineering, Inc.
12700 Hillcrest Road, Suite 125
Dallas, Texas 75230-2096
RE: Grapevine Creek Sanitary Sewer Project SS 94-02A
Dear Joe:
Enclosed is the change order for the sanitary sewer line shown on Sheet 5A of the referenced
project. This change order was required due to an error in the design. The items shown in the
change order are new or existing items needed to construct the sanitary sewer line shown on the
revised Sheet 5A. These additional items were not a part of the original contract documents,
therefore requiring a change order.
We are sending this change order for your information. In response to your verbal agreement
to assume responsibility for additional cost please forward check to the City of Coppell for
$5,709.00.
Sincerely,
tw~
Michael A. Martin, E.I.T.
Assistant City Manager
CITY OF COPPELL
-lIANGE OR EXTRA WORK ORr-l
PROJECT: Grapevine III Sanitary Sewer Project / SS 94-02A
CONTRACTOR: River Valley Enterprises
OWNER: City of Coppell
CHANGE ORDER NO.:
DATE:
March 26, 1996
CHANGE OR EXTRA WORK TO BE DONE
Pay Description Quantity Unit Unit Total
Item # Price
ly<.lO, 0':-
ADD: 5 Furnish & Place 8" PVC Sewer 32 LF 45.00
(15'-20' depth)
r-./ 0 ~
38 Trench Excavation Safety 32 LF 2.00 (p ~
42 Concrete Channel Replacement 50 LF 31.50 / t(;;s. ~"
,'-v b 5/). ,J";'
43 Remove Existing 8" SS 26 LF ;;2S.
Iv 8(). ~ (P Y6 ~~I
44 Concrete Fill Existing 4'MH EA
,i; fSD- ~ {"
45 Lower Invert Elevation EA 1 so.
Total Revision to Contract Amount .s 767: c;
Previous contract amount
Revised contract amount
Net increase in contract time of completion
Revised Contract time of completion
cJ s JAYS
/ '-/ ~ CA I. )A <f5
$ 365,124.00
~ 7 09. IS:)
ell
37t), s> 33
Net increase in contract amount
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and
satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to
the Contract.
"'
Date: .4Jf(3.91o
reed to by the Contractor:
/(/J lJuf-
Date: !-...3 - 76
y the Owner:
Date:
Y'--/tf-- ~v