Duke Lesley 2A-CS071207
THE.CITY.OF
COPPELL
December 7, 2007
Alex Bennett, P.E.
Duke Realty Corporation
14241 N. Dallas Phvy, Suite 1000
Dallas, TX 75254
RE: Duke Lesley, Point West VII, Lot 2 Block A
Fee Assessment Letter (2 additional irrigation meters)
Dear Mr. Bennett
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
The fees for water and sewer taps, water meters, and utility inspection fees of $10,279.00 need to be paid
by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
~
"LIL)~
Michael Garza, EIT
Graduate Engineer
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * POBOX 9478 * COPPE:..:""L TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Point West VII, Lot 2 Blk A
12/6/2007
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
o
2 - 2 inch
o
o
= 0 ESU's
= 10.66 ESU's
= 0 ESU's
= 0 ESU's
Total #: 10.66 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
$9,594.00
Water Tap Inspection Fee:
Total #:
2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$100.00
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$0.00
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$262.50
$0.00
$0.00
$525.00
$0.00
meter provided by developer
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$0.00
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$60.00
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $900.00 ea.
(Due prior to issuance of building permit)
$0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
$0.00
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$0.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26,1993
o
o
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-ot-way.
(See attached tee calculations if applicable)
Construction Inspection Fees:
A copy ot the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required tor private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available
DEVELOPMENT FEE TABLE
Project: Point West VII, Lot 2 Blk A
Date: 12/6/2007
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $9,594.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $525.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOT AL II $10,279.00 I
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Point West VIl, Lot 2 Blk A
12/6/2007
ROADWAY IMPACT FEE:
Service Area * 1
Category * * Light Industrial
Land Use ** General Light Industrial
Building Area (sf) 755,394
Development Units ** 755.39
Vehicle Miles per Development Unit ** 3.23
Fee per Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $365,988.39
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees
Total Credit
I > !fMOWv't1)UE:< >
100%
$365,988.39
. . <$().QOf