Loading...
Vista Ridge Retail-CS071210 'f"Y Winkelmann . \,. &Associates, Inc. CONSUL TtNG CIViL ENGINEERS. SURVEYORS December 10, 2007 Michael Garza, E.!. T. City of Coppell Engineering Dept. 255 Parkway Blvd. Coppell, TX 75019 (972) 304-3679 (972) 304-3570 fax RE: Vista Ridge Retail NEC S.H. 121 & Denton Tap Rd. Construction Plan Review Comments z ~ ~u15 kttT.J...L ~ Mr. Garza: Below is our response to your comments dated November 15, 2007. 1. A copy of these plans has been issued to Ali T ehari (TxDOT) and David Salmon (City of Lewisville) for review and approval. 2. The NOI will be executed prior to construction. A copy ofthe NOI will be provided by the General Contractor. 3. The sidewalk along SH 121 will be built by the future lots. 4. The plat has been separated into 2 pages as requested. 5. Drainage & Detention Easements have been removed. 6. All public fire hydrants and vaults are included in the utility easements as shown on the plat. 7. The 10' Street and Utility Easement is now shown on the plat. 8. The sidewalk easement has been added along Denton Tap Road. 9. The pavement sections reflect 3600 psi as requested. A copy of the signed soils report is enclosed. Refer to Page lOon the underlined sentence. 10. More detail was added to the grading plan. 11. This comment is understood. 12. A total of22.81 c.f.s. is designed to runoff to the Plaza. 13. TxDOT decel1ane plans are provided. 14. TxDOT plans have been submitted for review and approval. 15. The HGL and calculations on the storm profiles have been provided. 16. The location ofthe existing 8" water line has been corrected. The abandoned 12" water line along Denton Tap is now reflected on the plans. 17. Additional valves have been added. 18. The FDC connections have been relocated to be on the same side as the fire hydrant and within 50' of them. 19. Easements are shown around the vaults. ~ l r 'Dee.. 'Of G:\office data\work\199\85\garza 12-10-07.doc 6750 Hillcrest Plaza Drive, Suite 100 Dallas, Texas 75230 (972) 490-7090 Fax (972) 490-7099 20. Domestic and irrigation taps will be made on Lot 1 and will cross under the fire lane to serve Lot 5. This will be part of the Property Owner's Agreement. 21. A Property Owner's Agreement is being drafted. 22. The sanitary sewer now connects to the 12" sewer system. Sewer stubs have been provided to Lots 3 & 4. 23. Easements are shown on the plan sheets as requested. 24. All Water & Sewer crossings will meet TCEQ requirements. 25. Additional detail has been added to the Decel Lane Plans as requested. 26. The traffic control plan is now complete. If you have any questions, please give me a call. Mich el T. ett, P .E. Winkelmann & Associates (972) 490-7090 (972) 490-7099 fax mdoggett@winkelmann.com cc: Jim Stabler- UCD David Dunning- UCD Mike Clark - W AI 19985 G:\office data\work\199\85\garza 12-10-07.doc