Loading...
Alexander Ct-LR071116 I~A TESTING. INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS PROJECT: MIRA MAR DEVELOPMENT CORPORATION COLLEYVILLE, TEXAS ALEXANDER COURT~ COPPELL, TEXAS DATE: 11/16/07 TESTED FOR: OUR REPORT NO.: 070021-24 TEST DATA: TEST ~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT" NO. DEPTH NUMBER % PCF % PCF COMPACTION 134 11/16/07 FG-3.0 6 14.0 112.2 16.4 112 / 99 1-A 135 11/16/07 FG-2.0 6 14.0 112.2 16.2 112 V 100 1-A 136 11/16/07 FG-1.0 6 14.0 112.2 16.8 112 / 100 1-A 137 11/16/07 FG-3.0 6 14.0 112.2 16.1 108 I 96 1-A 138 11/16/07 FG-2.0 6 14.0 112.2 16.4 110 98 1-A 139 11/16/07 FG-1.0 6 14.0 112.2 16.8 110 \ 98 1-A ""\ 140 11/16/07 FG-3.0 3 13.0 115.4 14.9 113 ~. 1-A TEST LOCATION' UTILITIES 134 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 1+50 135 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 1+53 136 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 1+56 137 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 4+50 138 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 4+53 139 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 4+56 140 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 7+50 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED . A. IN PLACE PERCENT MOIST RE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COM PACTIO OT COMPLY WITH SPECIFICATIONS 1t7 ~ :~~~~~TINPLACE TURE OESnNO:~~~YWIT~t~\1J 7# Ul, \ Tom Ellis ALPHA TESTING. INC OUf test results and reports are for the exclusive use of the Client (and th gnaled reCipients on file In our office) and shall not be reproduced and/or distributed except with express approval of ALPHA The use of our name and test results must receive our written approval Test results and reports apply only 10 the samples tested and/or observed, and are not indicative of the qualities of apparently identical or Similar specimens Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting I~A TESTING, INC. 2209 Wisconsin St., Suite 100 Dallos, Texos 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MIRA MAR DEVELOPMENT CORPORATION COLLEYVILLE, TEXAS DATE: 11/16/07 PROJECT: ALEXANDER COURT COPPEll, TEXAS OUR REPORT NO.: 070021-248 TEST DATA: TEST ~ SOIL 10 OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT' NO. DEPTH NUMBER % PCF % PCF COMPACTION 148 11/16/07 FG-10 6 14.0 112.2 14.0 109 A-r 1-A l TEST LOCATION: UTILITIES 148 8" WATER LINE ALONG SANITARY SEWER LINE A AT STATION 13+56 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED . A B C o IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS RETEST 7# Tom Ellis ALPHA TESTING. INC Our test resulls and reports are for the exclUSive use of the Client (and their aeslgnated reCipIents on file In our office) and shall not be reproduced and/or distributed except with express approval of ALPHA The use of our name and test results must receive our written approval Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently Identical or sImilar specimens Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting