Loading...
Alexander Ct-LR071121 I~A TESTING. INe. 2209 Wisconsin St., Suite 700 Oaf/as, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MIRA MAR DEVELOPMENT CORPORATION COLLEYVILLE, TEXAS DATE: 11/21/07 PROJECT: ALEXANDER COURT COPPELL, TEXAS OUR REPORT NO.: 070021-26 TEST DATA: TEST ~ SOIL 10 OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT- NO. DEPTH NUMBER % PCF % PCF COMPACTION 149 11/21/07 FG-1.0 6 14.0 112.2 15.5 110 / 98 1-A 150 11/21/07 FG 6 14.0 112.2 15.0 109 97 1-A 151 11/21/07 FG-1.0 3 13.0 115.4 14.9 115 / 100 1-A I 152 11/21/07 FG 3 13.0 115.4 15.3 115 99 1-A 153 11/21/07 FG-1.0 6 14.0 112.2 13.1 108 96 1-A 154 11/21/07 FG 6 14.0 112.2 13.3 107 \ 96 1-A 155 11/21/07 FG-1.0 6 14.0 112.2 14.2 110 ~ 1-A TEST LOCATION' UTILITIES 149 WATER SERVICE TO BLOCK A, PAD 11 150 WATER SERVICE TO BLOCK A, PAD 11 151 WATER SERVICE TO BLOCK A, PAD 9 152 WATER SERVICE TO BLOCK A, PAD 9 153 WATER SERVICE TO BLOCK A, PAD 27 154 WATER SERVICE TO BLOCK A, PAD 27 155 WATER SERVICE TO BLOCK A, PAD 2 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED . A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Respectfully Submitted, ~~ Tom Ellis ALPHA TESTING. INC. Our test results and reports are for the exclusive use of the Client (and thelf deSIgnated reCipients on file In our office) and shall not be reproduced and/or distributed except with express approval of ALPHA The use of our name and test results must receive our wntten approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently Identical or similar specimens Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting I~A TESTING. INC. 2209 Wisconsin St" Suite 1 00 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MIRA MAR DEVELOPMENT CORPORATION COLLEYVILLE, TEXAS DATE: 11/21/07 PROJECT: ALEXANDER COURT COPPELL, TEXAS OUR REPORT NO.: 070021-26A TEST DATA: TEST ~ SOIL 10 OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT* NO. DEPTH NUMBER COMPACTION % PCF % PCF 156 11/21/07 FG 6 14.0 112.2 13.6 111 (99 1-A I TEST LOCATION: UTILITIES 156 WATER SERVICE TO BLOCK A, PAD 2 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED . A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Respectfully Submitted. ~~ Tom Ellis ALPHA TESTING. INC. OUf test results and reports are for the exclUSive use of the Chent (and thelf designated reCipients on file In our office) and shall not be reproduced and/or distributed except with express approval of ALPHA The use of OUf name and test results must receive our written approval Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently Identical or Similar specimens Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting '~A TESTING, INC. 2209 Wisconsin St., Suite /00 Dallas, Texas 75229 972/620-89// - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MIRA MAR DEVELOPMENT CORPORATION COLLEYVILLE, TEXAS DATE: 11/21/07 PROJECT: ALEXANDER COURT COPPEll, TEXAS OUR REPORT NO.: 070021-27 TEST DATA: TEST ~ SOILID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE DEPTH NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. % PCF % PCF 157 11 /21 /07 FG-3.0 3 13.0 115.4 13.9 114 /99 1-A 158 11 /21 /07 FG-2.0 3 13.0 115.4 14.1 115 7 99 1-A J 159 11 /21 /07 F G-1 .0 6 14.0 112.2 14.0 108 96 1-A 160 11 /21 /07 FG-3.0 6 14.0 112.2 13.2 111 / 99 1-A 161 11/21/07 FG-2.0 2 12.8 118.6 14.0 114 I 96 1-A 162 11/21/07 F G-1 .0 2 12.8 118.6 13.7 117 99 1-A 163 11 /21 /07 FG-1.0 2 12.8 118.6 14.5 116 \ 98 1-A TEST LOCATION: UTILITIES \ '" 157 8" WATER LINE ALONG SANITARY SEWER LINE B AT STATION 0+00 158 8" WATER LINE ALONG SANITARY SEWER LINE B AT STATION 0+05 159 8" WATER LINE ALONG SANITARY SEWER LINE B AT STATION 0+08 160 8" WATER LINE ALONG SANITARY SEWER LINE B AT STATION 3+00 161 8" WATER LINE ALONG SANITARY SEWER LINE B AT STATION 3+05 162 8" WATER LINE ALONG SANITARY SEWER LINE B AT STATION 3+10 163 WATER SERVICE TO BLOCK A, PAD 23 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED . A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Respectfully Submitted. ~~ Tom Ellis ALPHA TESTING, INC. Our test results and reports are for the exclUSive use of the Client (and thelf designated recipients on file m our office) and shall nol be reproduced and/or distnbuted except with express approval of ALPHA The use of our name and test results must receive our wntten approval Test results and reports apply only to the samples lested and/or observed, and are not Indicative of the qualilles of apparently Identical or Similar specimens Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting I~A TESTING, INe. 2209 Wisconsin St., Suite 700 Dallas, Texas 75229 972/620-8917 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MIRA MAR DEVELOPMENT CORPORATION COLLEYVILLE, TEXAS DATE: 11/21/07 PROJECT: ALEXANDER COURT COPPELL, TEXAS OUR REPORT NO.: 070021-27A TEST DATA: TEST ~ SOIL 10 OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT' NO. DEPTH NUMBER % PCF % PCF COMPACTION 164 11/21/07 FG 2 12.8 118.6 11.5 114 /96 1-A 165 11/21/07 FG-1.0 3 13.0 115.4 12.6 113 / 98 1-A 166 11/21/07 FG 6 14.0 112.2 15.9 109 97 1-A 167 11/21/07 FG-1.0 6 14.0 112.2 15.4 109 97 1-A 168 11/21/07 FG 3 130 115.4 14.8 113 98 1-A 169 11/21/07 FG-10 3 13.0 115.4 14.0 113 \ 98 1-A 170 11/21/07 FG 3 13.0 115.4 13.4 112 \z 1-A TEST LOCATION: UTILITIES 164 WATER SERVICE TO BLOCK A, PAD 23 165 WATER SERVICE TO BLOCK A, PAD 21 166 WATER SERVICE TO BLOCK A, PAD 21 167 WATER SERVICE TO BLOCK A, PAD 18 168 WATER SERVICE TO BLOCK A, PAD 18 169 WATER SERVICE TO BLOCK A, PAD 14 170 WATER SERVICE TO BLOCK A, PAD 14 1 FILL 2 NATURALSUBGRADE 3. LIME STABILIZED 4 CEMENT TREA TED 'A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Respectfully Submitted. ~~ Tom Ellis ALPHA TESTING. INC OUf test results and reports are for the exclusive use of the Client (and Hlelr deSignated reCIpients on ftle In our office) and shall not be reproduced and/or distributed except with express approval of ALPHA The use of OUI name and test results must receive our written approval Test resu:ts and reports apply only to the samples lested and/or observed, and are not Indicative of the qualities of apparently Identical or slmliar specimens Geotechnical Engineering & Construction Materials Testing & Environmental Engineering & Consulting