Loading...
DR9001-CS 900530FILE COPy COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: May 30, 1990 Steve Gora]~,Director of Public Works Larry~ '~, Construction~J Inspector Connell/Skaggs - Coppell High School Tickler 5/30/90 I am responding to your request memo dated May 25, I990, determine whether there is any official record or agreement as city commitment regarding Willow Lane south to Sandy Lake Road. No official record was located in the records researched by me, however, I am attaching a copy of a letter sent to Mr. Frank Trando Deputy City Manager dated January 22, 1987, addressing drive modification on the preliminary plat related to school traffic flo~v on Willow Lane. If I can be of further assistance, please let me know. ThanR you. CLD/bb xc: shohre Daneshmand, Acting City Engineer Ben dela Cruz, Engineering Technician John Karlsruher, Ginn Inc. ,,, COPPELL INDEPENDENT SCHOOL DISTRICT o,~ .', David P. Sta~field Superi~d~nt January 22, 1987 Hr. Frank Trando Acting City Hanager City of Coppe11 P.O. Box 478 Coppell, Texas 75019 RE: Coppeil High School Dear Mr. Trando: This letter is to serve as confirmation to you and the Council that the Coppe;1 Independent School District fully intends to address the concerns expressf:d by the Council at their last meeting regarding our new High School site. Meetings between the School District and Univest have been held and Univest has expressed their willingness to provide the District with an easement to allow of Parkway Blvd. and an access road to the school site, prior to the c,~,~pletlon of the new High School building. Please accept this letter as the School District's commitment to do t:h~ following in answer to the Council's concerns: 1. Construct the required portion of Parkway Bird, to provide access to the school site prior to the opening of school in the Fall of 1987, on an easement provided by Univest. 2. The District will convey the storm water along the east boundary line from the south end of our property to the north end, in a buried ~ulvert system. This culver~ will be constructed on School District property and will have the necessary out-fall treatment at the north property line to prevent erosion. ]. The school driveway configurations have been modified on the revised preliminary plat to prevent intermlngllng of school traffic with Willow Lane or other residential streets to the south of the property. Only a fire access pavement section has been provided from the school service drive toWillow Lane, in accordance wlth the requirements of the Fire Chief. This drlveway w111 have a permanent locked gate with the only key being issued Co the Fire Department, Attached please find a letter from Chief ~ayfield indicating his acceptance of this procedure. As you can see from the preliminary plat, all school traf('ic will enter and exit from Parkway Blvd. Constiuctlon access will be provided from the 24 ft. easement, fro,~ Denton Tap to the school's property line. 1£01 Wrar~gler Drive Coppell, Texas 75019 (~1~) t~71-1111 I.n addition to the easements for Parkway Blvd. and the school site access road, Univest and C.I.S.D. have agreed on the concept for the granting of additional easements. These include easements for the out-fall of the box culYert along the east property line and a buried storm drainage pipe at midpoint of the north property line that continues to Cottonwood Creek. o School District has employed the services of Barton & Ashman, traffic consultant, to prepare a traffic study in accordance with the City's consulting engineer's require- ments. This study is now underway and will be available shortly. A copy of this agreement is also attached. I trust this letter will serve to show the School District's willingness to work with the City of Coppell. We look forward to the successful completi~ of this project, which will provide a facility that the entire community can be proud of. Very truly yours, David P. Stanfleld Superintendent of Schools Barton-Aschman Associates, Inc. 5485 Belt Line Road, Suite 199, Dallas, Texas 75240 Jar~a~ 21, 1987 214-991.1900 Coppell Independent School District %Mr. Gary Keep SHWC Architects 5601 MacArthur Boulevard Irving, Tex~s 75038 Barton-Aschman Associates, Inc. is pl~d to respor~ to the request Mr. Tom Rutledge of Teague, Nall and Perkins to provide this proposal for professional transportation engineering services in connection wi~h the proposed high school in Coppell, Texas. In order that we address fha concerns of the city of Coppell, we have prepared a Scope of Service,'; fc this proj ec+- If aocepted, this letter will become an agreemen~ between the. ~>ppell Independent School District and Barton-Aschman Asscciates, ~ to plovi~~- services outlined in the Sc~pe of Services below. Our p£u~osed Scope of Services will include the foll~ w~rk tasXs, Site Traffic f~racteristics - ~ed upon the pr~ject~Q en.~o] Iment of the high school, the existing area dem~cgra~hics, ar~ v_he roadway system, we will aocu~lish the site Traffic Generation - Estimates of the traffic gener'ate~[ by the site will be prepared for the morning and afte~.~oon peak houlrs of school traffic. Site Acces~' - We will eval%~ate access to the school from lmarkway Boulevard to determine the size (number of lanes) that will be required to accommodate the expected traffic generated l,y %~e school. Documentation - We will provide a memorandum 'report that the study procedures and fim~g~/conclusions of the study. (10) copies of th~ ~port will be furnished to yo~ Barton-Aschman Associates, inc. Co~uell Independent School District Janh~_wy 21, 1987 Page 2 Our fee for completing the Scope of Services outlined above will be based on our hourly rates, current at the time of performance, for staff services rendered. Based on our experience in studies of this type, we estimate that the fee for completion of Tasks 1 through 3 will be $1,500. We will not ~ this fee without receiving your prior authorizatior~ ~f the need for extra services should arise, we will ,~eek you~ authorization and, before proceeding and if requested, we will supply you with o~/r best estimate of the fee to be ~ Direct reimbursement for out-of-pocket expenses suc2~ as travel, r~production, etc., will be billed at 110 percent (110%) of cost a~] will added to staff time costs inctlrred on the piDj eot. Invoices will be submitted to ycu monthly and become due within (30) days of the date of invoice. Barton-Aschman Associates, Inc. Cul4~_ll IndepeD~ent School District Ja~y 21, 1987 Page 3 We are prepared to commence work on this project immediately foll~owD~ receipt of a signed copy of this Letter of Agrsemant. We sincerely appreciate the opportunity to provide this pzuycc~tl and look forward to working with you on this project_ If you have any questions re~ the proposal, please do not hesitate to call. Sincerely, Gary D. Jost Associate Jack Hatchell, P.E. Vice President GD3?JH/mkm (Signature) (P~int~ or ~ Ns) (Title) ' (Organzzati~n) Jackie R. Mayfield Fire Chief P.O. Box 4;8 Copped, 1-~:×as 5019 214-,162-1133 January 22, 1987 Dr. David Stanfield, Superintendent Coppell Independent School DisTrict 1201 Wrangler Drive Coppell, Texas 75019 Dr. Stanfield The purpose of this letter is to clarify the Fire Department's position in the u~e cf Willow Lane as an emergency entrance to the campus of the new Coppell High School. This department has no objection to the School District providing a seu:¢ndary ingress/egress to the campus from Willow Lane. A gate, secured by lock, c~dn, r,nrf key. with the key(s) provided to this agency is acceptable. A "road", as y[,u must meet the standards of construction as detailed in the City of Copgell's frdinar,~' Please understand that the question/position this is addressed here pertains only emergency ingress/egress to the property. Do not construe this as to an endorsement for domestic vehicle usage of Oak Trail or Shadydale. Thank you for your concern for fire and life safety for this facility. Sincerely, ,/ Jagkie R, Mayfield ~.,~ ,,/' F~e Chief ' t cc: Frank Trando - Interim City Manager Taryon Bowman - DRO Chairperson