Loading...
DR9001-CS 900504PACHECO KOCH Consulting Engineers May 4, 1990 PI< No. 1004-90.005 Ms. Shohre Daneshmand City of Coppell 732 DeForest Coppell, Texas 75019 RE: Woodside Village, Drainage Improvement Options Dear Ms. DanesPceand: Enclosed for your use are proposals received from contractors to construct the referenced drainage improvements. These improv~r~nts w~uld be in the form of a concrete culvert, either a conventional Texas State Department of Highways and Public Transportation box culvert or a gunite "Airform" arch culvert. The limits of the improvements v~uld be from Sandy Lake Road to the existing box culvert at Willow Lane near the southeast corner of the High School tract. Bids were received from Buckelew Construction Co., Inc. to construct the conventional box culvert, and frc{n Dallas Concrete, Inc. to construct the Airform culvert. Please note that Dallas Concrete also bid the construction of the conventional culvert at the s~ne cost as the Airformculvert. The bids received ere enclosed for inclusion in the City Council packets. Please note that the total devel~t costs for the culvert have been calculated, by adding to the construction costs, the costs for previous and anticipated engineering and geotechnical services associated with the design of the culvert, either paid or to be paid, by Connell Development Co. Please review the enclosed information and contact me if you need any additional inforxstion. Sincerely, co: Mr. Mark Connell, Connell Development Co, 1004-06 1012 Park Central VII / 12750 Merit Drive / Dallas, Texas 75251 / (214) 450-4141