Loading...
Alexander Ct-PT071002 THE.CiTY.OF corPELL FLOODPLAIN DEVELOPMENT PERMIT PERMIT NO.O, ~ NAME OF PERMITEE: Yh~ t.1 ~r- Develof~l!'''+ ~o J .To"'", L. UOIwk; "" ~ I (1Lf">: J~V\,-t- The above named permitee applied for a FLOODPLAIN DEVELOPMENT PERMIT on A\~\.1&er Coor+ The application has been reviewed by the FLOODPLAIN ADMINSTRA TOR and it has been determined that the proposed development is located within an identifiable floodplain OfG () ~pe. uh..,,-e, "-.Rf-e l The FLOODPLAIN ADMINISTRATOR has reviewed plans and specifications of the proposed development for conformance with the development standards required by Floodplain Management Ordinance #2001-952. You are hereby authorized to pr~cee~ with the following describeq work: . , (l ~ II I V'I t",o{.. c.. \ co c! r IOf' V\ A ~ c:.l,o L() V\. \ "" -t "" -(.. lte \J I c::.-e c(. g~pe.v; k-e. (iLt-et. L01-1'R "'fpl:CM.t01oo. ~vIoM: \.tccL-r{) FEJ.I\A () "" 0,/210/0'1 It-.~;d-, LV'" > P ft't~r-e~ by Y\.A--\-k V'\ '\:). ~iet"" CQVl~1I1 ~\",,~ ~""S'J\I1"'eQc, ;)~ To maintain compliance with the development standards of Floodplain Management Ordinance #2001-952 and to eliminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: (~ Compliance with the development standards of Floodplain Management Ordinance #2001-952 including but not limited to: · For residential structures, the lowest floor (including basement) must be elevated to two (2) feet above the 100- year base flood elevation or one (I) foot above ultimate condition whichever is higher. Certification of the lowest floor must be submitted from a registered professional engineer, architect, or land surveyor. · For non-residential structures, the lowest floor (including basement) must be elevated or flood-proofed to two (2) feet above the lOG-year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification that the flood-proofing methods are adequate to withstand the flood depths, pressure, velocities, impact and uplift forces and other factors associated with the base flood must be submitted from a registered professional engineer or architect. · For fill activities, the permittee must submit certification from a registered professional engineer or land surveyor that the level of the compacted fill materials is at or above the elevation of the Base Flood. (~ Certified copy of all final plans or As-Built Drawings must be submitted to the FLOODPLAIN ADMINISTRA TOR. (~ IO,.c-O? Date ken ,~ I ~FIN rinted Name 10-).'1 Date