Park West CC(15.1)-LR071214
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F'
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
BMC West Addition
425 Airline Drive
Cappell, Texas
REPORTED TO BMC West Corporation
425 Airline Drive, Suite 200
Coppell, Texas 75019
: Mr. Danny McQuary
REPORT NO. 9
REPORT DATE: 12-14-07
REG PROJECT NO. 14935
TECHNICIANS: G. Tsougarakis &
J. Ruiz
CONTRACTOR: D/B Constructors, Inc.
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Ltd. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Injection Depth
ft
8
Surfactant added at reg r int rv~ as
E-Mail ! ~
Distribution: (1) BM s r in
Mr. M Qu
(1) Pros sig Gr ~
Mr. Cha es Miller
(1) D/B Constructors, Inc.l
Mr. Michael Smith
(1) BMC West Corporation/
Mr. Mike Maring
(1) Hunt & Joiner/Mr. Steve Dial
Mail
Distribution: (1) Icon Consulting Engineers/
Mr. David Gregory
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Number of
Ri s
2
Date
11-12-07
11-13-07
11-15-07
11-16-07
11-17-07
100-200
Injection Intervals
in
12-18
E ui
Number of Probes
ea
4
ment
Length of Probes
ft
11.5
Probe Spacing
ft
5
Area Injected (sq ft)
32,000
22,400
20,000
12,800
3,200
Average Pressure
125
125
125
125
125
Pass No.
2
2&3
3
3
3
Submitted by:
REED ENGINEE
Original Signed By
Ronald F. Ree
BW/cn
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019