Gateway BP(3.1)-LR071101
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600. Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Reinforcing Steel Inspection
Report No.: 303184
Project No.: 0712786
Date of Service: 10/26/2007
Report Date: 11/01/2007
Project: Gateway Business Center
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Paving, parking at back side of buildings 1 and 2
Item s Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Confo rming Non
Co nforming Conforming Conforming
P lac ing Drawings Bar Length ColumnTies Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x Proper 8 ar P lacem ent x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Proper Bar Supporls x CornerBars x
Number of Bars x ProperCover x Mechanical Splices NA
Discrepancies I Comments: 1. Dowels at previous pour have spoiled concrete. 2. Trash and debris in placement area.
3. Curb line steel was not all in place. 4. Chairs not in place.
Discrepancies noted above were corrected prior to concrete placement.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIED) Page 1 of 2