Loading...
Duke Lesley-LR071218 Rone Eni~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302613 Project No.: 0612510 Date of Service: 10/20/2007 Report Date: 12/18/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9139 Placement Date: 10/20/2007 Weather Conditions: Clear, calm Time Sampled: 12:00pm Batch time: Temperature - Air: 770F Concrete: 820F Truck No: 7024 Ticket No: 7183848 Air Content: 4.4% Unit Weight (pet): NA Overall Placement Location: Paving replacement, intersection of Dividend Drive and Beltline Road Measured Slump (inches) 6.5 Sample Location: Intersection of Dividend Drive and Beltline Rd., 3' east from west curb, southbound Beltline Road, 8' north from curb on eastbound Dividend Drive REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/21/2007 1 6.00 28.27 127,670 4,520 Shear 1 2 10/21/2007 1 6.00 28.27 129,340 4,570 Shear Average 4,540 1 3 10/27/2007 7 6.00 28.27 190,4 70 6,740 Cone/Split 1 4 11/17/2007 28 6.00 28.27 223,480 7,900 Cone/Split 1 5 11/17/2007 28 6.00 28.27 222,810 7,880 Cone/Split Average 7,890 6 12/15/2007 56 6.00 28.27 249,540 8,830 Cone/Split Started: 11 :OOam Finished: 01 :30pm Rone Engineering ,~~ Technician: Pat Parks Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (OM/KW) Page 1 of 1