Loading...
Duke Lesley 2A-LR071112 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 304120 Project No.: 0712932 Date of Service: 11/02/2007 Report Date: 11/12/2007 Project: Hemisphere's at Point West Cappell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Tilt wall panels P-64, P-65. P-66, P-6Y, P-68, P-69, P-lO, P-Y1, P-72, P-73. P-74, P-75, P-76, P-77, P-78, P-79, P-80, P-81, P-82, P-83, P-84, P-85, P-86, P-87 Item s Ins peeled: Co nfo rming Non Items Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non Co nfo rm ing Conforming Conform ing P lacing Drawings Bar Length ColumnTies Properly Appro ved x and Shape x Tied and Spaced NA BarSize x Proper B ar P lacem ant x Stirrup Spacing NA 8 ar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar S uppo rts x CornerBars x NumberofBars x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Remove and clean soil/mud from steel. 2. Remove and clean loose debris from placement area. 3. Provide additional bar supports at various locations. Discrepancies noted above were corrected prior to concrete placement. Technician: Jesse Landreth Started: 10:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 02:00pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LlMITA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlED) Page 1 of 1