Duke Lesley 2A-LR071112
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 304120
Project No.: 0712932
Date of Service: 11/02/2007
Report Date: 11/12/2007
Project: Hemisphere's at Point West
Cappell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Tilt wall panels P-64, P-65. P-66, P-6Y, P-68, P-69, P-lO, P-Y1, P-72, P-73.
P-74, P-75, P-76, P-77, P-78, P-79, P-80, P-81, P-82, P-83, P-84, P-85,
P-86, P-87
Item s Ins peeled: Co nfo rming Non Items Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non
Co nfo rm ing Conforming Conform ing
P lacing Drawings Bar Length ColumnTies Properly
Appro ved x and Shape x Tied and Spaced NA
BarSize x Proper B ar P lacem ant x Stirrup Spacing NA
8 ar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Pro per Bar S uppo rts x CornerBars x
NumberofBars x ProperCover x Mechanical Splices NA
Discrepancies / Comments: 1. Remove and clean soil/mud from steel. 2. Remove and clean loose debris from
placement area. 3. Provide additional bar supports at various locations.
Discrepancies noted above were corrected prior to concrete placement.
Technician: Jesse Landreth Started: 10:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished: 02:00pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LlMITA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlED) Page 1 of 1