Duke Lesley 2A-LR071115
Rone En2~
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 304805
Project No.: 0712932
Date of Service: 11/08/2007
Report Date: 11/15/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Tilt panel #88.
Item s Inspected: Conforming Non Item s Inspected: Conforming Non Item. Inspected: Co nto rm ing Non
Co nfo rm ing Co nfo rm ing Confo rm ing
Placing D rswings B or Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x P fO per BaT P Iscem ent x Stirrup Spacing x
B aT Grade x P ro pe rly Tied x Stirrup Type x
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x ProperBarSupports x Corner Bars x
Numberof Bars x ProperCover x Mechanical Splices NA
Discrepancies I Comments:
No apparent discrepancies were noted at the locations listed above.
Technician: Ben Weaverling Started: 06:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished:
08:45am R E' .
~dii~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/ED) Page 1 of 1