Loading...
Duke Lesley 2A-LR071115 Rone En2~ 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 304805 Project No.: 0712932 Date of Service: 11/08/2007 Report Date: 11/15/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Tilt panel #88. Item s Inspected: Conforming Non Item s Inspected: Conforming Non Item. Inspected: Co nto rm ing Non Co nfo rm ing Co nfo rm ing Confo rm ing Placing D rswings B or Length Column Ties Properly Approved x and Shape x Tied and Spaced NA Bar Size x P fO per BaT P Iscem ent x Stirrup Spacing x B aT Grade x P ro pe rly Tied x Stirrup Type x Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x ProperBarSupports x Corner Bars x Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies I Comments: No apparent discrepancies were noted at the locations listed above. Technician: Ben Weaverling Started: 06:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Finished: 08:45am R E' . ~dii~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/ED) Page 1 of 1