Duke Lesley 2A-LR071116
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Cloudy
Time Sampled: 04:45am
Temperature - Air: 700F
Truck No: 117
Air Content: NA
Overall Placement Location:
J, K, L, I Line 11-21
Batch time: 04:27am
Concrete: 900F
Ticket No: 13645
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
Grid line J, K, L, ( 11-12
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 09/27/2007 7 6.00 28.27 97,250 3,440 Shear
2 10/18/2007 28 6.00 28.27 128,440 4,540 Cone/Split
3 10/18/2007 28 6.00 28.27 140,580 4,970 Cone/Shear
Average 4,760
4 11/15/2007 56 6.00 28.27 149,370 5,280 Cone/Split
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lellers and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LBIJC) Page 1 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Cloudy
Time Sampled: 05:40am
Temperature - Air: 700F
Truck No: 136
Air Content: NA
Overall Placement Location:
J, K, L, 1 Line 11-21
Batch time: 05:30am
Concrete: 920F
Ticket No: 13656
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Grid line J, K, L, 112-13
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 09/27/2007 7 6.00 28.27 104,490 3,700 Cone/Split
2 2 10/18/2007 28 6.00 28.27 135,390 4,790 Cone/Split
2 3 10/18/2007 28 6.00 28.27 121,020 4,280 Cone/Split
Average 4,530
2 4 11/15/2007 56 6.00 28.27 154,970 5,480 Cone/Split
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 2 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 07:00am
Temperature - Air: 700F
Truck No: 106
Air Content: NA
Overall Placement Location:
J, K, L, / Line 11-21
Batch time: 06:28am
Concrete: 900F
Ticket No: 13665
Unit Weight (pet): NA
Measured
Slump
(inches)
7.0
Sample Location:
Grid line J, K, L, /13-14
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 09/27/2007 7 6.00 28.27 89,600 3,170 Cone/Split
3 2 10/18/2007 28 6.00 28.27 128,320 4,540 Cone/Split
3 3 10/18/2007 28 6.00 28.27 117,590 4,160 Cone/Shear
Average 4,350
3 4 11/15/2007 56 6.00 28.27 141,870 5,020 Cona/Shear
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 3 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 07:50am
Temperature - Air: 760F
Truck No: 102
Air Content: NA
Overall Placement Location:
J, K, L, / Line 11-21
Batch time: 07:36am
Concrete: 880F
Ticket No: 13675
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
Grid line J, K, L, /14-15
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in") (Ibs) (psi) Type
4 1 09/27/2007 7 6.00 28.27 104,970 3,710 Cone/Split
4 2 10/18/2007 28 6.00 28.27 147,310 5,210 Cone/Split
4 3 10/18/2007 28 6.00 28.27 128,350 4,540 Cone/Split
Average 4,870
4 4 11/15/2007 56 6.00 28.27 160,310 5,670 Cone/Shear
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 4 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 09:15am
Temperature. Air: 760F
Truck No: 117
Air Content: NA
Overall Placement Location:
J. K. L. / Line 11-21
Batch time: 08:33am
Concrete: 920F
Ticket No: 13685
Unit Weight (pcf): NA
Measured
Slump
(inches)
6.0
Sample Location:
Grid line J, K. L, /15-16
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 09/27/2007 7 6.00 28.27 87,580 3,100 Cone/Shear
5 2 10/18/2007 28 6.00 28.27 108,960 3,850 Shear
5 3 10/18/2007 28 6.00 28.27 108,410 3,830 Cone/Split
Average 3,840 *
5 4 11/15/2007 56 6.00 28.27 147,610 5,220 Cone/Shear
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 5 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 10:30am
Temperature - Air: 840F
Truck No: 132
Air Content: NA
Overall Placement Location:
J, K, L, 1 Line 11-21
Batch time: 10:06am
Concrete: 920F
Ticket No: 13697
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Grid line J, K, L, 116-17
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Com pressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 09/27/2007 7 6.00 28.27 82,800 2,930 Shear
6 2 10/18/2007 28 6.00 28.27 104,060 3,680 Shear
6 3 10/18/2007 28 6.00 28.27 96,970 3,430 Cone/Split
Average 3,550 ..
6 4 11/15/2007 56 6.00 28.27 138,270 4,890 Cone/Split
.. Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 6 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Req u i rements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 11:30am
Temperature - Air: 880F
Truck No: 102
Air Content: NA
Overall Placement Location:
J, K, L, / Line 11-21
Batch time: 11:17am
Concrete: 920F
Ticket No: 13710
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Grid line J, K, L, /17-18
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
7 1 09/27/2007 7 6.00 28.27 88,980 3,150 Shear
7 2 10/18/2007 28 6.00 28.27 113,040 4,000 Cone/Split
7 3 10/18/2007 28 6.00 28.27 112,260 3,970 Cone/Split
Average 3,980 "
7 4 11/15/2007 56 6.00 28.27 141,050 4,990 Cone/Shear
" Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 7 of 11
Rone Engineering
..
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT OAT A
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Partly Cloudy
Time Sampled: 12:40pm Batch time: 12:32pm
Temperature - Air: 900F Concrete: 920F
Truck No: 131 Ticket No: 13721
Air Content: NA Unit Weight (pct): NA
Overall Placement Location:
J, K, L, / Line 11-21
Measured
Slump
(inches)
5.0
Sample Location:
Grid line J, K, L, /19-20
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 09/27/2007 7 6.00 28.27 94,180 3,330 Cone/Split
8 2 10/18/2007 28 6.00 28.27 108,690 3,840 Cone/Split
8 3 10/18/2007 28 6.00 28.27 111 ,490 3,940 Cone/Split
Average 3,890 *
8 4 11/15/2007 56 6.00 28.27 143,840 5,090 Cone/Split
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 8 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT OAT A
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 01:10pm
Temperature - Air: 920F
Truck No: 136
Air Content: NA
Overall Placement Location:
J, K, L, / Line 11-21
Batch time: 12:55pm
Concrete: 940F
Ticket No: 13725
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Grid line J, K, L, /18.8-19.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 09/27/2007 7 6.00 28.27 96,41 0 3,410 Shear
9 2 10/18/2007 28 6.00 28.27 125,730 4,450 Shear
9 3 10/18/2007 28 6.00 28.27 115,160 4,070 Cone/Split
Average 4,260
9 4 11/15/2007 56 6.00 28.27 155,410 5,500 Cone/Split
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LBIJC) Page 9 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Req u i rements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 01 :30pm
Temperature - Air: 920F
Truck No: 142
Air Content: NA
Overall Placement Location:
J, K, L, / Line 11-21
Batch time: 01:18pm
Concrete: 940F
Ticket No: 13729
Unit Weight (pet): NA
Measured
Slump
(inches)
4.0
Sample Location:
Grid line J, K, L, /19.9-20.4
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
10 1 09/27/2007 7 6.00 28.27 92,030 3,250 Cone/Split
10 2 10/18/2007 28 6.00 28.27 142,510 5,040 Cone/Split
10 3 10/18/2007 28 6.00 28.27 148,230 5,240 Cone/Split
Average 5,140
10 4 11/15/2007 56 6.00 28.27 156,810 5,550 Cone/Shear
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 10 of 11
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 299350
Project No.: 0712932
Date of Service: 09/20/2007
Report Date: 11/16/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349 PW
Placement Date: 09/20/2007
Weather Conditions: Sunny
Time Sampled: 02:30pm
Temperature - Air: 920F
Truck No: 117
Air Content: NA
Overall Placement Location:
J, K, L, I Line 11-21
Batch time: 02: 15pm
Concrete: 920F
Ticket No: 13735
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
Grid line J, K, L, I 20.4-21
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
11 1 09/27/2007 7 6.00 28.27 97,350 3,440 Cone/Split
11 2 10/18/2007 28 6.00 28.27 119,240 4,220 Cone/Split
11 3 10/18/2007 28 6.00 28.27 123,460 4,370 Shear
Average 4,290
11 4 11/15/2007 56 6.00 28.27 157,350 5,570 Cone/Split
Technician: Denny Harris Started: 02:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Altn: Mr Ryan Skelly
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished: 03:45pm Rone Engineering
/~~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/JC) Page 11 of 11