Duke Lesley 2A-LR071128
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 306264
Project No.: 0712932
Date of Service: 11/21/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM 0-6938
Gauge: Troxler 3430
Gauge Serial No: 34008
Test Mode: DT
Standard Counts
Moisture Density
Current: 654 Current: 2559
Previous: NA Previous: NA
MOISTURE DENSITY RELATIONS
MID No.
286306
Description
Medium Brown I Shaley Clay wI Trace LSF
Moisture
%
Maximum
Density
(pct)
97.3
Project Requirements
Moisture Density
Optimum +4 95 min
22.3
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pct) (pct) (% max)
-
Utilities
Storm drain, Station 14+30, 3' below grade 6" 286306 23.5 117.3 95.0 98
Utilities
2 Storm drain, Station 14+30,2' below grade 6" 286306 23.6 116.1 93.9 97
Utilities
3 Storm drain, Station 14+30, l' below grade 6" 286306 24.6 118.7 95.3 98
Utilities
4 10" water line 45' south from fire hydrant, 2' 6" 286306 23.0 119.6 97.2 100
below grade
Utilities
5 10" water line 45' northeast from building 6" 286306 22.3 115.6 94.5 97
corner, l' below grade
Technician: Chris Harbour Started: 01 :45pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished: 03:00pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303088
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: L40N980A
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 04:20am
Temperature - Air: 500F
Truck No: 1182
Air Content: NA
Overall Placement Location:
Panels at Point West VII- 1st mix (380 yds) - panels 114, 110, 109, 122, 165, 162,98,
4,3, 1
Batch time: 03:36am
Concrete: 800F
Ticket No: 13600163
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.0
Sample Location:
Panel 3
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/02/2007 7 6.00 28.27 151,860 5,370 Cone/Split
1 2 11/23/2007 28 6.00 28.27 197,580 6,990 Shear
1 3 11/23/2007 28 6.00 28.27 198,370 7,020 Shear
Average 7,000
1 4 12/21/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 4
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303088
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Batch time: 05:03am
Concrete: 800F
Ticket No: 13600173
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.25
Mix Design 1.0.: L40N980A
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 05:30am
Temperature - Air: 500F
Truck No: 1031
Air Content: NA
Overall Placement Location:
Panels at Point West VII-1st mix (380yds) - panels 114,110, 109, 122, 165, 162,98,
4, 3, 1
Sample Location:
Panel 1
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 11/02/2007 7 6.00 28.27 160,170 5,660 Shear
2 2 11/23/2007 28 6.00 28.27 211,420 7,480 Cone/Split
2 3 11/23/2007 28 6.00 28.27 194,630 6,880 Shear
Average 7,180
2 4 12/21/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303088
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: L40N980A
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 06:30am
Temperature - Air: 520F
Truck No: 1189
Air Content: NA
Overall Placement Location:
Panels at Point West VII-1st mix (380 yds) - panels 114, 110, 109, 122, 165, 162,98,
4,3, 1
Batch time: 05:53am
Concrete: 820F
Ticket No: 13600182
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
Panel 122
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 11/02/2007 7 6.00 28.27 102,360 3,620 Shear
3 2 11/23/2007 28 6.00 28.27 148,840 5,260 Shear
3 3 11/23/2007 28 6.00 28.27 148,930 5,270 Shear
Average 5,270
3 4 12/21/2007 56
Remarks: Water added at site: 10 gallons
L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 4
Rone Eni==
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303088
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Redi Mix
Plant: 136
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: L40N980A
Placement Date: 10/26/2007
Weather Conditions: Clear
Time Sampled: 08:00am
Temperature - Air: 550F
Truck No: 1190
Air Content: NA
Overall Placement Location:
Panels at Point West VII - 1 st mix (380 yds) - panels 114; 110, 109, 122, 165, 162, 98,
4,3, 1
Batch time: 07:37am
Concrete: 840F
Ticket No: 13600196
Unit Weight (pct): NA
Measured
Slump
(inches)
5.25
Sample Location:
Panel 109
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 11/02/2007 7 6.00 28.27 114,690 4,060 Cone/Split
4 2 11/23/2007 28 6.00 28.27 151,120 5,340 Cone/Split
4 3 11/23/2007 28 6.00 28.27 148,620 5,260 Cone/Split
Average 5,300
4 4 12/21/2007 56
Technician: Montreal Bailey Started: 03:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Altn: Mr Ryan Skelly
1-cc City of Coppell Altn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished:
0345~;;; ~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHIKW) Page 4 of 4
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303197
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT OAT A
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Measured
Slump
(inches)
4.0
Mix Design \.0.: 9349PW
Placement Date: 10/26/2007
Weather Conditions: Sunny, clear
Time Sampled: 09:15am Batch time: 08:58am
Temperature - Air: 600F Concrete: 840F
Truck No: 131 Ticket No: 14916
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Panels at Point West VII- 2nd mix (405 yds), panels 111-113, 153-160, 163-164,5-8
Sample Location:
Panel 113
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/02/2007 7 6.00 28.27 118,770 4,200 Cone/Shear
1 2 11/23/2007 28 6.00 28.27 164,940 5,830 Cone/Split
1 3 11/23/2007 28 6.00 28.27 163,580 5,790 Cone/Split
Average 5,810
1 4 12/21/2007 56
Remarks: Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303197
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 9349PW
Placement Date: 10/26/2007
Weather Conditions: Sunny, clear
Time Sampled: 11:35am Batch time: 11:19am
Temperature - Air: 650F Concrete: 860F
Truck No: 120 Ticket No: 14933
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Panels at Point West VII - 2nd mix (405 yds), panels 111-113, 153-160, 163-164, 5-8
Measured
Slump
(inches)
4.75
Sample Location:
Panel 155
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 11/02/2007 7 6.00 28.27 111 ,130 3,930 Cone/Split
2 2 11/23/2007 28 6.00 28.27 161,300 5,700 Cone/Split
2 3 11/23/2007 28 6.00 28.27 153,600 5,430 Cone/Split
Average 5,570
2 4 12/21/2007 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 2 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303197
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 9349PW
Placement Date: 10/26/2007
Weather Conditions: Sunny, clear
Time Sampled: 01 :05pm Batch time: 12:48pm
Temperature - Air: 650F Concrete: 860F
Truck No: 131 Ticket No: 14946
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Panels at Point West VII - 2nd mix (405 yds), panels 111-113, 153-160, 163-164, 5-8
Measured
Slump
(inches)
5.0
Sample Location:
Panel 160
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in.) (Ibs) (psi) Type
3 1 11/02/2007 7 6.00 28.27 112,320 3,970 Cone/Split
3 2 11/23/2007 28 6.00 28.27 157,750 5,580 Cone/Split
3 3 11/23/2007 28 6.00 28.27 160,390 5,670 Cone/Split
Average 5,630
3 4 12/21/2007 56
Remarks: Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303197
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT OAT A
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 9349PW
Placement Date: 10/26/2007
Weather Conditions: Sunny, clear
Time Sampled: 01 :50pm Batch time: 01 :33pm
Temperature - Air: 700F Concrete: 860F
Truck No: 106 Ticket No: 14954
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Panels at Point West VII- 2nd mix (405 yds), panels 111-113, 153-160, 163-164,5-8
Measured
Slump
(inches)
5.25
Sample Location:
Panel 5
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 11/02/2007 7 6.00 28.27 113,070 4,000 Shear
4 2 11/23/2007 28 6.00 28.27 153,900 5,440 Cone/Split
4 3 11/23/2007 28 6.00 28.27 157,240 5,560 Shear
Average 5,500
4 4 12/21/2007 56
Remarks: Water added at site: 10 gallons
Technician: Montreal Bailey Rone Engineering
See Report 303088 for technician time~ ~
Report Distribution: ~~.
0,"' Do', C,",t,"ell,", lP (0'''"" TX) AM' Me p", S,m' . . '.. -_
(1-ec copy) - -
1-cc Poller Concrete Alln: Mr Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Alln: Mr. Lee Stone Project Manager
1-cc City of Coppell Alln: Mr. Larry Davis
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Concrete Compressive Strength Test
Report No.: 303068
Project No.: 0712932
Date of Service: 10/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1 on-site mix
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 7751 PW
Placement Date: 10/26/2007
Weather Conditions: Clear, light wind
Time Sampled: 12:20pm Batch time: 11 :28am
Temperature - Air: 690F Concrete: 770F
Truck No: 107 Ticket No: 14934
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Straight shaft piers at column lines B.4/30, A.9/30, A.5/30, U27.8, L.1/27.8, L.2/27.8,
L.3/27.8
Measured
Slump
(inches)
6.0
Sample Location:
Pier at column lines U27.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/02/2007 7 6.00 28.27 101,270 3,580 Cone/Split
1 2 11/23/2007 28 6.00 28.27 158,420 5,600 Shear
1 3 11/23/2007 28 6.00 28.27 150,720 5,330 Cone/Split
Average 5,470
1 4 12/21/2007 56
Remarks: Water added at site: 10 gallons
Technician: Tommy Carver Rone Engineering
See Report 303067 for technician time~ ~
Report Distribution: . . ~. '
0',,, Dok, Coo","ctloo. lP (D"",. TX) Atto M' P,"' B,m' . -.,. - .
(1-ec copy) - - -
1-cc Poller Concrete Alln: Mr Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Alln: Mr. Lee Stone P . t M
1-cc City of Coppel! Alln: Mr. Larry Davis roJec anager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303271
Project No.: 0712932
Date of Service: 10/27/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7751
Placement Date: 10/27/2007
Weather Conditions: Sunny
Time Sampled: 10:35am
Temperature - Air: 740F
Truck No: 130
Air Content: NA
Overall Placement Location:
Pier N27.8
Batch time: 09:27am
Concrete: 760F
Ticket No: 15023
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
Pier AJ27.8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/03/2007 7 6.00 28.27 98,910 3,500 Shear
1 2 11/24/2007 28 6.00 28.27 140,720 4,980 Shear
1 3 11/24/2007 28 6.00 28.27 143,000 5,060 Cone/Split
Average 5,020
1 4 12/22/2007 56
Technician: Denny Harris Rone Engineering
See Report 303270 for technician time~ ~
Report Distribution: ~
Ori,,, 0". Co",I","!;", LP (D,Il", TX) Aile M'. p", Byme ' - . - ." . " =;;..
(1-ec copy) - -
1-cc Potter Concrete AUn: Mr Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Altn: Mr. Lee Stone Project Manager
1-cc City of Coppell Attn: Mr. Larry Davis
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303258
Project No.: 0712932
Date of Service: 10/27/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7753
Placement Date: 10/27/2007
Weather Conditions: Clear
Time Sampled: 03:45am
Temperature - Air: 430F
Truck No: 140
Air Content: 6.3%
Overall Placement Location:
North fire lane from 10-17
Batch time: 03:40am
Concrete: 680F
Ticket No: 14973
Unit Weight (pet): NA
Measured
Slump
(inches)
7.0
Sample Location:
Grid line 40
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/03/2007 7 6.00 28.27 101,150 3,580 Cone/Split
1 2 11/24/2007 28 6.00 28.27 131,510 4,650 Cone/Split
1 3 11/24/2007 28 6.00 28.27 140,160 4,960 Cone/Split
Average 4,800
1 4 12/22/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 1 of 5
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303258
Project No.: 0712932
Date of Service: 10/27/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753
Placement Date: 10/27/2007
Weather Conditions: Clear
Time Sampled: 04:45am
Temperature - Air: 450F
Truck No: 138
Air Content: 1.8%
Overall Placement Location:
North fire lane from 10-17
Batch time: 04:29am
Concrete: 700F
Ticket No: 14982
Unit Weight (pet): NA
Measured
Slump
(inches)
4.25
Sample Location:
Grid line 8
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 11/03/2007 7 6.00 28.27 142,720 5,050 Cone/Split
2 2 11/24/2007 28 6.00 28.27 183,810 6,500 Shear
2 3 11/24/2007 28 6.00 28.27 176,300 6,240 Cone/Split
Average 6,370
2 4 12/22/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHIKW) Page 2 of 5
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303258
Project No.: 0712932
Date of Service: 10/27/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753
Placement Date: 10/27/2007
Weather Conditions: Clear
Time Sampled: 06:30am
Temperature - Air: 480F
Truck No: 140
Air Content: 3.4%
Overall Placement Location:
North fire lane from 10-17
Batch time: 05:52am
Concrete: 740F
Ticket No: 1499
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.25
Sample Location:
Grid line 11
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 11/03/2007 7 6.00 28.27 122,890 4,350 Cone/Split
3 2 11/24/2007 28 6.00 28.27 155,980 5,520 Cone/Split
3 3 11/24/2007 28 6.00 28.27 175,380 6,200 Cone/Split
Average 5,860
3 4 12/22/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 3 of 5
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303258
Project No.: 0712932
Date of Service: 10/27/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753
Placement Date: 10/27/2007
Weather Conditions: Clear
Time Sampled: 09:30am
Temperature - Air: 560F
Truck No: 110
Air Content: 3.2%
Overall Placement Location:
North fire lane from 10-17
Batch time: 09:02am
Concrete: 780F
Ticket No: 1502
Unit Weight (pet): NA
Measured
Slump
(inches)
4.5
Sample Location:
Grid line 14
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 11/03/2007 7 6.00 28.27 118,180 4,180 Shear
4 2 11/24/2007 28 6.00 28.27 155,070 5,480 Cone/Split
4 3 11/24/2007 28 6.00 28.27 150,310 5,320 Cone/Split
Average 5,400
4 4 12/22/2007 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 4 of 5
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 303258
Project No.: 0712932
Date of Service: 10/27/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 1
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 3" - 5"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7753
Placement Date: 10/27/2007
Weather Conditions: Clear
Time Sampled: 11:15am
Temperature - Air: 660F
Truck No: 138
Air Content: 2.4%
Overall Placement Location:
North fire la ne from 10-17
Batch time: 10:54am
Concrete: 810F
Ticket No: 1503
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.5
Sample Location:
Grid line 16
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
5 1 11/03/2007 7 6.00 28.27 107,980 3,820 Cone/Split
5 2 11/24/2007 28 6.00 28.27 157,050 5,550 Cone/Shear
5 3 11/24/2007 28 6.00 28.27 143,640 5,080 Cone/Split
Average 5,320
5 4 12/22/2007 56
Rone Engineering
p~~
Started: 02:15am Finished: 03:00pm
Technician: Eric Auger
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell AUn: Mr. Larry Davis
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/KW) Page 5 of 5
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 306265
Project No.: 0712932
Date of Service: 11/21/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Ram p retaining wall, so uth sid e of build ing, west end I 1.3 line running
south 30'.
Ilem s Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non Ilem s Ins peeled: Conforming Non
Conforming Conforming Co nfo rm ing
P lacing Drawings Bar Le ngth Column Ties Properly
Approved x and Shape x Tied and Spaced NA
8 ar Size x Pro per B ar Placement x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place NA Lapped Splices x
Fa rm Clean x P fO per B ar Suppa rts x Comer Bars NA
Numberof Bars x ProperCover x Mechanical Splices NA
Discrepancies I Comments:
1. Dowels to be placed during concrete placement.
Technician: Chris Harbour Started: 01:45pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell AUn: Mr. Larry Davis
Finished: 02:45pm Rone Engineering
kad- ~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TM/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 304266
Project No.: 0712932
Date of Service: 11/03/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Cappell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Parking lot and fire lane, northeast corner of trailer parking area going
southeast to Dividend Drive.
Item s Inspected: Co nfo rm ing Non Items Inspected: Co nfo nm ing Non Item s Inspected: Canfo rm ing Non
Co nfo rm ing Conforming Co nfo rm ing
P lacing Drawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
Bar Size x P fO per 8 sr P lacem ant NA Stirrup Spacing NA
Bar Grade x ProperlyTied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices NA
Form Clean x ProperBarSupports x Comer Bars NA
Numberof Bars x ProperCover NA Mechanical Splices NA
Discrepancies / Comments: 1. Remove trash from placement area.
2. Tie down reinforcing steel.
3. Missing dowel bars.
4. Add chairs.
Dsicrepancies noted above were corrected prior to concrete placement.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TMlKW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 304266
Project No.: 0712932
Date of Service: 11/03/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Locations and Items Inspected:
Wing wall panels, P64A, P56A, P44SA, P41A, P33A, P28A, P20A, P17A,
P4A, P125A, P122A, P114A, P109A, P101A
Item s Inspected: Conforming Non Items Inspected: Co nfo rm ing Non Items Inspected: Conforming Non
Co nfo rm ing Co nfo rm ing Conform ing
Placing Drawings Bar Length Co lum n Ties Pro perly
Approved x and Shape x Tied and Spaced NA
B af Size x P fO per B Sf P lacem ent x Stirrup Spacing NA
BarGrade x Pro perly Tied x Stirrup Type NA
Bars Clean x DowelS ars in Place x Lapped Splices x
Form Clean x Pro per B ar Suppo rts x CamerBars NA
Numberof Bars x ProperCover x Mechanical Splices x
Discrepancies / Comments:
1. Tie down reinforcing steel at various locations.
2. Add chairs.
Discrepancies noted above were corrected prior to concrete placement.
Technician: Jose Villanueva Started: 12:30pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 03:30pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, .Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 305067
Project No.: 0712932
Date of Service: 11/10/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Paving, south of building from southwest corner to halfway towards
southeast corner.
lIem s Inspected: Conforming Non Item s Inspected: Co nfa rm Ing Non Item s Inspected: Co nfo rming Non
Conforming Co nfo rm ing Co nfo rm ing
Placing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x Pro per B ar P Iscem ent x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
B SfS Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x ProperBarSupports x Corner B srs NA
NumberofBars x ProperGover x Mechanical Splices NA
Discrepancies I Comments: 1. Remove trash from placement area. 2. Adjust curve bar from approach to preventburning.
3. Tie down reinforcing steel at various locations. 4. Missing dowel bar in redwood. 5. Chairs missing.
Discrepancies noted above were corrected prior to concrete placement.
Technician: Jose Villanueva Started: 07:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 09:30am
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlKW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 306342
Project No.: 0712932
Date of Service: 11/26/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Retaining wall, southwest area.
Item s Inspected: Co nforming Non Items Inspected: Co nfo rm ing Non Items Inspected: . Conforming I Non I
Conforming Co nfo rm ing Co nform ing
Placing Drawings Bar Length Column Ties Properly
Appro ved x and Shape x Tied and Spaced NA
BarSize x P fa per B ar P laeem ant x Stirrup Spacing NA
Bar Grade x ProparlyTiad x Stirrup Type NA
8 ars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x P fa per Bar Suppa rts x Corner Bars NA
Numberof Bars x ProperCover x Mechanical Splices NA
Discrepancies I Comments: 1. Remove mud/soil from steel. 2. Tie down steel at various locations.
3. Missing dowels. 4. Add chairs to sides.
Discrepancies noted above were corrected prior to concrete placement.
Technician: Jose Villanueva Started: 12:00pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished:
01~~~ ~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 306105
Project No.: 0712932
Date of Service: 11/20/2007
Report Date: 11/28/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Paving, building 7, column line 3, south side of building around to west
side and 50' north from column line A.
Item sins pected. Conforming Non Item s Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non .
Conforming Conforming Co nform ing
P lacing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
BarSize x P fO per B ar P Iscem ent x Stirrup Spacing NA
B sr Grade x Pro perly Tied x S1irrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x ProperBarSupports x Corner Bars NA
NumberofBars x P fO per Cover x Mechanical Splices NA
Discrepancies I Comments:
1. Reinforcement chairing to be placed during concrete placement.
No other apparent discrepancies were noted at the locations listed above.
Technician: Clayton Snyder Started: 03:30pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished:
0515~;;ij, ~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlKW) Page 1 of 1