Loading...
Duke Lesley 2A-LR071206 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307094 Project No.: 0712932 Date of Service: 12/03/2007 Report Date: 12/06/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, fire lane and parking lot, northwest corner of building towards northeast corner, halfway. lIem s Inspected: Conforming Non Item s Inspected: Co nfo rm ing Non lIems Inspected: Co nfo rm ing Non Co nforming Conforming Conforming P lacing Drawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x Pro per Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perty Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Proper Bar Suppa rts x Co mer Bars NA Number of Bars x Proper Cover x M echanicaJ Splices NA Discrepancies / Comments: 1. Tie down steel at various locations. 2. Add chairs. 3. Missing corner bars. Discrepancies noted above were corrected prior to concrete placement. Technician: Jose Villanueva Started: 04:30pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Finished: 06:00pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/JB) Page 1 of 1