Loading...
Duke Lesley 2A-LR071207 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607216 Project No.: 0712932 Date of Service: 12/03/2007 Report Date: 12/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Structural Steel Inspection Report of Inspection C 0 lu m n Bas e P la te s L 0 c a tio n: C 0 lu m n an c h 0 r bolt te n s io n and g ro u t ve rific a tio n , P a rtia I in s p e c tio n, grid lines 1-5IA-J. Reportexception columns with orange paintare notready for inspection. Non Cod e Compliant Compliant AW S D 1 .1 A IS C Job Specs Anchor Bolt Tension Verification x x x G ro u te d Bas e P la te s x x x Com men ts LIMITATIONS: The test results presented herein were prepared based upon the specific sampies provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607216 Project No.: 0712932 Date of Service: 12/03/2007 Report Date: 12/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Structural Steel Inspection She e t D e c k A tta c h men t to S tru c tu ra IF ra m in g Location: Roof deck, partial random inspection, grid lines 1-7/A-J. Exception blocked out areas and deck at anQles are not ready for inspection. Non C ode C om pliant C om oliant AW S D 1 .3 S J I Job S oecs Vis u a I V e r i Ii c a ti 0 n P u d d Ie Weld s x x x x Vis u a I V e r i fi c a ti 0 n Pow d erA c tu ate d V is u a I V e rific a tio n Pneumatic V isua I V e rifica tio n Tek Sere w s at Sid e Lap s x x x SheetDeck M e c h ani cally F a s Ie n e d with Self Tap pin g Sere w s S ide Lap s M echanicallv C rim ped S heetDeck Interior A llachm ent Pattern Sheet Deck Per i mete r A tta c h m entPallern N e Is 0 n. S tu d Verification W Q T's She e t S te e I Com men ts : Technician: Ron Cuba, CWI-97040341 Started: 02:45pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Finished: 07:00pm Rone Engineering p~-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they a,e addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607227 Project No.: 0712932 Date of Service: 12/05/2007 Report Date: 12/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Structural Steel Inspection Report of Inspection C 0 lu m n Bas e P la te s Location: Column anchor bolt tension and grout verification, grid lines 6-18/A-J and columns with orange paint, grid lines 1-5/A-J noted on report #607216, date d 1 2/0 3/07 . Non Cod e Compliant Compliant AWS D 1 .1 A IS C Job Specs Anchor Bolt Tension Verification x x x Grouted Bas e P la te s x x x Com men ts LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in Quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfKW) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607227 Project No.: 0712932 Date of Service: 12/05/2007 Report Date: 12/07/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Structural Steel Inspection She e t Dee k A tta c h men t to S tru c tu ra IF ra m in g Location: Roof deck reinspection, grid lines 1-7/A-J, noted in report #607216, dated 12/03/07 and b 10 c ked 0 uta re as. Non C ode C omoliant C omoliant AW S D 1 .3 S D I Job Soecs V isua I V e rifica tio n P u d d Ie Weld s x x x x Vis u a I V e r i fi cat ion Pow d erA c tu ate d V isua I V e rifica tio n P neum atic V Is u a I Veri fi c a Ii 0 n T e k S c re w s at Sid e Lap s x x x Sheet Deck M e c h ani cally F a s te n e d with Self T a 0 pin 9 S c re w s S id e Lap s M echanicallv C rim ped S heetDeck Interior A ttachm en t Patte rn x x x x Sheet Deck P e rim e te r A tla c h m entPattern x x x x N e Is 0 n S tu d Verification W Q T's She e t S te e I Comments: Technician: Ron Cuba, CWI-97040341 Started: 09:00am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 12:45pm Rone Engineering P-~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 2