Loading...
Duke Lesley 2A-LR071210 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307223 Project No.: 0712932 Date of Service: 12/04/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, north and south of building Items Inspected: Conforming Non Items Inspected: Co nfo rm ing Non Items Inspected: Co nfo rm ing Non Co nforming Conforming Conform ing P lacing Drawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x P ra per 8 ar Placement x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per B ar Suppo rts x Co mer Bars NA NumberofBars x PraperCover x Mechanical Splices NA Discrepancies / Comments: 1. Remove dry concrete from south area paving, 2. Tie down steel at various locations. 3. Missing dowel bars at north side. 4. Add chairs. Discrepancies noted above were corrected on this date. Technician: Jose Villanueva Started: 04:15pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 06:30pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306770 Project No.: 0712932 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 2" - 4" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 03: 15am Temperature - Air: 440F Truck No: 103 Air Content: 3.9% Overall Placement Location: Paving Batch time: 02:58am Concrete: 800F Ticket No: 9445 Unit Weight (pct): NA Measured Slump (inches) 4.5 Sample Location: 25' south, 10' east from southwest building corner REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 12/07/2007 1 2 12/28/2007 1 3 12/28/2007 1 4 01/25/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 5 gallons Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 117,210 Compressive Strength (psi) 4,150 Fracture Type Cone/Split Area (in') 28.27 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306770 Project No.: 0712932 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 2" - 4" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 04:55am Temperature - Air: 440F Truck No: 108 Air Content: 4.3% Overall Placement Location: Paving Batch time: 04:35am Concrete: 800F Ticket No: 9459 Unit Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: 50' west from southeast building corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 12/07/2007 7 6.00 28.27 113,960 4,030 Cone/Split 2 2 12/28/2007 28 2 3 12/28/2007 28 2 4 01/25/2008 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306770 Project No.: 0712932 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 2" - 4" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 06:55am Temperature - Air: 460F Truck No: 106 Air Content: 4.0% Overall Placement Location: Paving Batch time: 06:38am Concrete: 800F Ticket No: 9473 Unit Weight (pct): NA Measured Slump (inches) 4.0 Sample Location: 40' west, 50' north from southeast building corner REPORT OF TESTS Cylinder Marked Date Set No. Tested 3 1 12/07/2007 3 2 12/28/2007 3 3 12/28/2007 3 4 01/25/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 5 gallons Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 97,570 Compressive Strength (psi) 3,450 Fracture Type Cone/Split Area (in') 28.27 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 3 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306770 Project No.: 0712932 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 2" - 4" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 PW Placement Date: 11/30/2007 Weather Conditions: Overcast Time Sampled: 09:10am Temperature - Air: 540F Truck No: 139 Air Content: 3.9% Overall Placement Location: Paving Batch time: 08:53am Concrete: 820F Ticket No: 9489 Unit Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: 60' west, 100' north from southeast building corner REPORT OF TESTS Cylinder Marked Date Set No. Tested 4 1 12/07/2007 4 2 12/28/2007 4 3 12/28/2007 4 4 01/25/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 10 gallons Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 100,280 Compressive Strength (psi) 3,550 Fracture Type Cone/Split Area (in') 28.27 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 4 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306770 Project No.: 0712932 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 2" - 4" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 1 0:45am Temperature - Air: 620F Truck No: 112 Air Content: 3.1 % Overall Placement Location: Paving Batch time: 10:35am Concrete: 660F Ticket No: 9504 Unit Weight (pet): NA Measured Slump (inches) 8.25 Sample Location: 200' north, 20' west from southwest corner of building 7 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 12/07/2007 7 6.00 28.27 85,550 3,030 Cone/Split 5 2 12/28/2007 28 5 3 12/28/2007 28 5 4 01/25/2008 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 5 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306770 Project No.: 0712932 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 2" - 4" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 12:45pm Temperature - Air: 670F Truck No: 106 Air Content: 3.9% Overall Placement Location: Paving Batch time: 12:31pm Concrete: 740F Ticket No: 9514 Unit Weight (pet): NA Measured Slump (inches) 4.75 Sample Location: 40' south, 25' west from northwest corner of building 7 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 12/07/2007 7 6.00 28.27 90,980 3,220 Cone/Split 6 2 12/28/2007 28 6 3 12/28/2007 28 6 4 01/25/2008 56 Finished: ro45ft;;ij ~ K. Scott Watson, AET Project Manager Technician: Ryan Rawlinson Started: 09:45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 6 of 6 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307379 Project No.: 0712932 Date of Service: 12/05/2007 Report Date: 12/10/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, grid lines 10.5-14.0/L.O, paving 75' south from grid lines. Item s Inspected: Co nfo rm ing Non Item s Inspected: Conforming Non Items Inspected: Co nfo rming Non Conforming Conforming Co nfo rm ing P lacing Drawings Bar Length Co lum n Ties Pro perly Appro ved x and Shape x Tied and Spaced NA Bar Size x P ra per B ar P laeem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x ProperBarSupports x Corner Bars NA Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies I Comments: 1. Remove trash. 2. Tie down steel at various locations. 3. Adjust dowel bars. 4. Add chairs Discrepancies noted above were corrected on this date. Technician: Jose Villanueva Started: 04:00pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 05:15pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (TMIKW) Page 1 of 1