Duke Lesley 2A-LR071218
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305861
Project No.: 0712932
Date of Service: 11/17/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 9349
Placement Date: 11/17/2007
Weather Conditions: Clear
Time Sampled: 04:30am
Temperature - Air: 550F
Truck No: 130
Air Content: 1.1 %
Overall Placement Location:
Tilt wall #'s P69, P70, P71
Batch time:
Concrete: 650F
Ticket No: NA
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.0
Sample Location:
P70, middle
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/24/2007 7 6.00 28.27 117,410 4,150 Cone/Split
1 2 12/15/2007 28 6.00 28.27 148,210 5,240 Cone/Split
1 3 12/15/2007 28 6.00 28.27 149,010 5,270 Cone/Shear
Average 5,260
1 4 01/12/2008 56
Remarks: Water added at site: 10 gallons
Technician: Javier Martinez Rone Engineering
See Report 305860 for technician time~~
Report Distribution: '. . .~
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne ". . - .. -- ~.
(1-eccopy) . --
1-cc Potter Concrete Attn: Mr Ryan Skelly K S tt W t AET
. f . co a son,
1-cc City 0 Coppell Attn: Mr. Lee Stone P . t M
1-cc City of Coppell Attn: Mr. Larry Davis rOJec anager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 03:15am
Temperature - Air: 650F
Truck No: 129
Air Content: 3.8%
Overall Placement Location:
Paving
Batch time: 02:58am
Concrete: 800F
Ticket No: 9230
Unit Weight (pet): NA
Measured
Slump
(inches)
4.0
Sample Location:
20' east, 5' north from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 11/26/2007 7 6.00 28.27 152,480 5,390 Cone/Split
1 2 12/17/2007 28 6.00 28.27 192,620 6,810 Shear
1 3 12/17/2007 28 6.00 28.27 181,120 6,410 Cone/Split
Average 6,610
1 4 01/14/2008 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd.
(TMIKW) Page 1 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 04:20am
Temperature - Air: 650F
Truck No: 120
Air Content: 3.9%
Overall Placement Location:
Paving
Batch time: 04:05am
Concrete: 800F
Ticket No: 9241
Unit Weight (pet): NA
Measured
Slump
(inches)
4.5
Sample Location:
15' east, 10' south from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 11/26/2007 7 6.00 28.27 147,590 5,220 Cone/Split
2 2 12/17/2007 28 6.00 28.27 179,760 6,360 Cone/Split
2 3 12/17/2007 28 6.00 28.27 180,590 6,390 Cone/Split
Average 6,370
2 4 01/14/2008 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 2 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): .4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 05:25am
Temperature - Air: 670F
Truck No: 136
Air Content: 4.1 %
Overall Placement Location:
Paving
Batch time: 05:04am
Concrete: 800F
Ticket No: 9252
Unit Weight (pcf): NA
Measured
Slump
(inches)
4.75
Sample Location:
25' west, 25' south from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 11/26/2007 7 6.00 28.27 119,720 4,230 Cone/Split
3 2 12/17/2007 28 6.00 28.27 152,320 5,390 Cone/Split
3 3 12/17/2007 28 6.00 28.27 150,470 5,320 Cone/Split
Average 5,350
3 4 01/14/2008 56
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 3 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perfonn required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 06:15am
Temperature - Air: 670F
Truck No: 132
Air Content: 3.7%
Overall Placement Location:
Paving
Batch time: 05:43am
Concrete: 820F
Ticket No: 9260
Unit Weight (pct): NA
Measured
Slump
(inches)
4.75
Sample Location:
40' north, 25' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 11/26/2007 7 6.00 28.27 116,510 4,120 Cone/Split
4 2 12/17/2007 28 6.00 28.27 145,300 5,140 Cone/Split
4 3 12/17/2007 28 6.00 28.27 125,250 4,430 Shear
Average 4,780
4 4 01/14/2008 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 4 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Req uirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 08:00am
Temperature - Air: 670F
Truck No: 117
Air Content: 3.9%
Overall Placement Location:
Paving
Batch time: 07:42am
Concrete: 820F
Ticket No: 9273
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.0
Sample Location:
100' north, 50' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 11/26/2007 7 6.00 28.27 122,770 4,340 Shear
5 2 12/17/2007 28 6.00 28.27 153,850 5,440 Cone/Split
5 3 12/17/2007 28 6.00 28.27 136,550 4,830 Shear
Average 5,140
5 4 01/14/2008 56
Remarks: Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 5 of 10
Rone Engineering
.
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 09:20am
Temperature - Air: 700F
Truck No: 120
Air Content: 3.6%
Overall Placement Location:
Paving
Batch time: 09:02am
Concrete: 840F
Ticket No: 9282
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
150' north, 15' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (lbs) (psi) Type
6 1 11/26/2007 7 6.00 28.27 115,890 4,100 Shear
6 2 12/17/2007 28 6.00 28.27 151,890 5,370 Cone/Split
6 3 12/17/2007 28 6.00 28.27 149,410 5,280 Cone/Split
Average 5,330
6 4 01/14/2008 56
Remarks: Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 6 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Sunny, clear
Time Sampled: 11 :OOam Batch time: 1 0:44am
Temperature - Air: 720F Concrete: 860F
Truck No: 134 Ticket No: 9300
Air Content: 3.8% Unit Weight (pcf): NA
Overall Placement Location:
Paving
Measured
Slump
(inches)
4.75
Sample Location:
210' north, 25' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
7 1 11/26/2007 7 6.00 28.27 109,820 3,880 Cone/Split
7 2 12/17/2007 28 6.00 28.27 146,120 5,170 Cone/Split
7 3 12/17/2007 28 6.00 28.27 155,680 5,510 Cone/Split
Average 5,340
7 4 01/14/2008 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 7 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive' Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Req uirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Sunny, clear
Time Sampled: 12:20pm Batch time: 11 :58am
Temperature - Air: 720F Concrete: 860F
Truck No: 117 Ticket No: 9309
Air Content: 3.9% Unit Weight (pet): NA
Overall Placement Location:
Paving
Measured
Slump
(inches)
3.9
Sample Location:
275' north, 40' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 11/26/2007 7 6.00 28.27 117,920 4,170 Shear
8 2 12/17/2007 28 6.00 28.27 149,510 5,290 Shear
8 3 12/17/2007 28 6.00 28.27 158,070 5,590 Cone/Split
Average 5,440
8 4 01/14/2008 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlKW) Page 8 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 01 :20pm
Temperature - Air: 780F
Truck No: 120
Air Content: 4.0%
Overall Placement Location:
Paving
Batch time: 01 :06pm
Concrete: 860F
Ticket No: 9321
Unit Weight (pet): NA
Measured
Slump
(inches)
5.0
Sample Location:
325' north, 10' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 11/26/2007 7 6.00 28.27 114,050 4,030 Cone/Split
9 2 12/17/2007 28 6.00 28.27 134,910 4,770 Cone/Split
9 3 12/17/2007 28 6.00 28.27 136,810 4,840 Cone/Split
Average 4,810
9 4 01/14/2008 56
Remarks: Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 9 of 10
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 305899
Project No.: 0712932
Date of Service: 11/19/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations. perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 10
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 5%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 7753PW
Placement Date: 11/19/2007
Weather Conditions: Clear
Time Sampled: 02:38pm
Temperature - Air: 780F
Truck No: 144
Air Content: 4.1 %
Overall Placement Location:
Paving
Batch time: 02:18pm
Concrete: 860F
Ticket No: 9333
Unit Weight (pet): NA
Measured
Slump
(inches)
5.75
Sample Location:
415' north, 30' east from southeast building corner
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
10 1 11/26/2007 7 6.00 28.27 108,260 3,830 Shear
10 2 12/17/2007 28 6.00 28.27 131,920 4,670 Cone/Split
10 3 12/17/2007 28 6.00 28.27 131,760 4,660 Shear
Average 4,660
10 4 01/14/2008 56
Remarks: Water added at site: 10 gallons
Finished: 04:00pm Rone Engmeermg
p~~
Technician: Montreal Bailey Started: 02:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reporis are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 10 of 10
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Structural Steel Inspection
Report No.: 607274
Project No.: 0712932
Date of Service: 12/15/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Structural Steel Inspection
Report of Inspection
Location:
Bar J 0 is ts
Bar joist weld placem ent only, random inspection, grid lines 8-18fA-C.
Non Code
Compliant Compliant AWS D1.1 S JI Job Specs
J 0 is t Sea t Be a ri n Q
Vis u a I Weld P la cern e n tOn Iv x x x
Horizontal BridQinQ
Diaoonal BridainQ
Bottom Chord Stabilization
Joist S pacino
Perimeter Edae Anqle Weld Verification
WQT's Structural
VisualTouch-Up PaintVerification, BarJoist
Welds at Structural Floor Fram inq Assem bly
Com men ts : 1 . F la g 9 e dare a s not re ad y fo r ins p e c ti 0 n. 2. Tie jo is t bolts not s e cure d 0 r ta c k weld e d .
Technician: Ron Cuba, GWI-97040341 Started: 12:45pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Goppell Attn: Mr. Lee Stone
1-cc City of Coppell Altn: Mr. Larry Davis
Finished: 04:30pm Rone Engineering
P-~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/JB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Structural Steel Inspection
Report No.: 607273
Project No.: 0712932
Date of Service: 12/14/2007
Report Date: 12/18/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Structural Steel Inspection
Report of Inspection
She e t Dee k A tta c h men t to S tru c tu ra IF ra m in 9
Location:
Roof deck weld, random inspection, grid lines 13-18/A-F, orange painted areas, grid iines
13-18/F-L (exception of blocked outareasl.
Non C ode
C omoliant C om pliant AW S D 1 .3 S D I Job Soecs
V isualV erification P u d d Ie Weld s x x x x
V isua I V e rifica tio n Pow d erA c tu a te d
V is u a I V e rific a tio n Pneumatic
VisualVerificalion T e k Sere w 5 at Sid e
Lap 5 X X X X
Sheet Deck M e c h ani cally F a s te n e d with
Self Tap pin g Sere w s
S ide Lap s Mechanically C rim ped
S he e t D e c k Interior Attachm ent Pattern x x x x
She e t D e c k Per i mete r A tta c h m e n t Patte rn x x x x
N e Is 0 n S tu d Verification
W Q T's She e t S te e I
Comments:
Technician: Ron Cuba, CWI-97040341 Started: 02:15pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 04:30pm Rone Engineering
p~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlJB) Page 1 of 1