Loading...
Duke Lesley 2A-LR071221 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 302970 Project No.: 0712932 Date of Service: 10/25/2007 Report Date: 12/21/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 - on site mix Specification Req uirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7751 Placement Date: 10/25/2007 Weather Conditions: Clear, windy Time Sampled: 01:25pm Batch time: 01:05pm Temperature - Air: 640F Concrete: 580F Truck No: 120 Ticket No: 8150 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers at column lines: E.2/30, 0.7/30, 0.2/30, C.7/30, C.2/30, U28.2, U28.7, U29.2, U29.7, U30, L.6/30, L.B/30, (continue) Measured Slump (inches) 6.5 Sample Location: Pier at column line 0.2/30 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 1 1 11/01/2007 7 6.00 28.27 101,630 3,590 Cone/Split 1 2 11/22/2007 28 6.00 28.27 143,830 5,090 Cone/Split 1 3 11/22/2007 28 6.00 28.27 142,990 5,060 Cone/Split Average 5,070 1 4 12/20/2007 56 6.00 28.27 163,250 5,770 Cone/Split Remarks: K.2/30, K.5/30, L.3/30, B.9/30 Technician: Tommy Carver Rone Engineering See Report 302969 for technician time~~ Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne. ... . .... ... ... . ... . (1-ec copy) . 1-cc p~tter Concrete Attn: Mr Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone Project Manager 1-cc City of Coppel! Attn: Mr. Larry Davis ~ LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 1