DR9001-CS 900117COPPELL PUBLIC WORKS
MEMORANDUM
January 1.7, 1990
TO:
FROM:
RE:
Steve Goram, Director of Public Works
Russell Doyle~y Engineer
Connell Skaggs Drainage Contract (Tickler 1/19/90)
Jim Koch indicates that the channel to be lined would be
$80,000.00 ($20,000.00 excavation, $60,000.00 concrete).
Jim Koch will send me more information via
of the 10 x 8 box for the entire length.
Connell nor Jim Koch knows what's meant
the "Engineering Study".
the design drawings
Also, neither Mark
in the agreement by
Amy Crowley indicated Connell contributed $44,121.72 toward
the Sandy Lake and Denton Tap Roads intersections and they do
not know if Connell would get credit for that amount against
paving assessments on either street.
Requested meeting is set for 10:30 a.m. on Friday, January 26,
1990.
RRD/sm