Loading...
DR9001-CS 900117COPPELL PUBLIC WORKS MEMORANDUM January 1.7, 1990 TO: FROM: RE: Steve Goram, Director of Public Works Russell Doyle~y Engineer Connell Skaggs Drainage Contract (Tickler 1/19/90) Jim Koch indicates that the channel to be lined would be $80,000.00 ($20,000.00 excavation, $60,000.00 concrete). Jim Koch will send me more information via of the 10 x 8 box for the entire length. Connell nor Jim Koch knows what's meant the "Engineering Study". the design drawings Also, neither Mark in the agreement by Amy Crowley indicated Connell contributed $44,121.72 toward the Sandy Lake and Denton Tap Roads intersections and they do not know if Connell would get credit for that amount against paving assessments on either street. Requested meeting is set for 10:30 a.m. on Friday, January 26, 1990. RRD/sm