Loading...
Duke Lesley-LR071221 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302958 Project No.: 0612510 Date of Service: 10/25/2007 Report Date: 12/21/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: 131 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 88274 Placement Date: 10/25/2007 Weather Conditions: NA Time Sampled: 11 :OOam Temperature - Air: 740F Truck No: 1187 Air Content: 4.0% Overall Placement Location: 1. Paving crosswalks, eastbound Dividend Dr. Dividend Dr. at Point West Measured Slump (inches) 2.75 Batch time: 09:44am Concrete: 800F Ticket No: 558274 Unit Weight (pet): NA 2. Paving crosswalks, eastbound Sample Location: Beltline and Dividend Drive REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 11/01/2007 7 6.00 28.27 128,590 4,550 Cone/Split 1 2 11/22/2007 28 6.00 28.27 177, 190 6,270 Cone/Split 1 3 11/22/2007 28 6.00 28.27 175,890 6,220 Cone/Split Average 6,240 1 4 12/20/2007 56 6.00 28.27 185,530 6,560 Cone/Split Remarks: Water added at site: 9 gallons Technician: Alejandro Avendano Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Started: 10:45am Finished: 12:15pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1