Duke Lesley 3C-LR071116
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Structural Steel Inspection
Report No.: 607139
Project No.: 0711530
Date of Service: 11/14/2007
Report Date: 11/16/2007
Project: Point West Office I
Services: Structural Steel Inspection
Report of Inspection
Bar J 0 is ts
Location: Roof joist, random inspection, grid lines 1-9/p-D,weld placementonly.
Non Code
Compliant Comeliant AWSD1.1 S JI Job Seecs
Joist Seat BearinQ x x x
VisualWeld Placement x x x
Horizontal Bridaina
DiaQonalBridainQ
Bottom Chord Stabilization
Joist S oacina
Peri mete rEd a e A n a Ie Weld Ve rificatio n
W Q 1's S tructura I
VisualTouch-Up PaintVerification, Bar Joist
Weld sat S tru c tu ra I F 100 r F ra m in a Ass em b Iy
Comments:Atvarious locations,joistattiltwallpockets have excessive gap. Need RFldocumentatlon.
Technician: Ron Cuba, CWI-97040341 Started: 06:15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished:
11:15am R E' .
~;;zi~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1