Loading...
Duke Lesley 3C-LR071128 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 300429 Project No.: 0711530 Date of Service: 09/29/2007 Report Date: 11/28/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 07:08am Concrete: 830F Ticket No: 14117 Unit Weight (pct): NA Measured Slump (inches) 4.5 Mix Design 1.0.: 7752PW Placement Date: 09/29/2007 Weather Conditions: Clear Time Sampled: 07:12am Temperature - Air: 760F Truck No: 136 Air Content: NA Overall Placement Location: Southeast approach off Beltline Road/Center East approach off Beltline Road Sample Location: Tie-in approach to paving off Beltline Road REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/06/2007 7 6.00 28.27 92,600 3,280 Shear 1 2 10/27/2007 28 6.00 28.27 74,500 2,630 Cone/Split 1 3 10/27/2007 28 6.00 28.27 117,920 4,170 Cone/Split Average 3,400 * 1 4 11/24/2007 56 6.00 28.27 131,690 4,660 Cone/Split * Does not comply with specified strength Started: 06:15am Finished: 09:00am Technician: Jason Shipe Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Alln: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMIT A TfONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 305960 Project No.: 0711530 Date of Service: 11/19/2007 Report Date: 11/28/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Leave out reinforcing steel at sheet detail 53.0, #1 and #8. Item 5 Inspected: Co nfo rm ing Non Item s Inspected: Co nfo rm ing Non "em s Inspected: Conforming Non Co nfo rm ing Conforming Co nform ing p lacing Drawings B er Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x P fO per B Sf P lacem ent x Stirrup Spacing NA B af Grade x Pro perly Tied x Stirrup Type NA Bars Clean x DowelBarsinPlace x Lapped Splice. x Form Clean x P fO per B af Suppa rts x Comer Bars x NumberofBers x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Mud on dowels. 2. Trash and debris in placement area. Discrepancies noted above were corrected prior to concrete placement. Technician: Nick Ciofani Started: 11 :45am Report Distribution: Ori9: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 01:15pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/KW) Page 1 of 1