Loading...
Duke Lesley 3C-LR071204 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607189 Project No.: 0711530 Date of Service: 11/28/2007 Report Date: 12/04/2007 Project: Point West Office I Services: Structural Steel Inspection She e tOe c k A tla c h men t to S tru c tu ra IF ra m In 9 Location: 3rd floor, grid lines 1-9/A-P, roof, grid lines 1-18/A-P Non C ode C omoliant C o m 0 Ii a n I A W S D 1 .3 S D I Job Specs Vis u a I V e r i fi cat ion P u d d Ie Weld s x x V is u a I V e rific a lio n Pow d erA c lu a Ie d V isua I V e rifica tio n Pneumatic Vis u a I V e r i fi c a ti 0 n T e k S c re w s a I Sid e Lap s x x Sheet Deck Mechanically Fastened w ilh Self T a 0 pin a S c r e w s x (3 rd ) x S id e Lao s M e c h ani cally C rim 0 e d S he e t D e c k In Ie rio r A Ita c h men t P a lie rn x x S he e I D e c k Peri mete r A tla c h m enlPatlern x x N e Is 0 n S lu d Verification W Q T's SheetSleel Com men Is 3 rd flo 0 r, Iln e 1 -9/A -P. In s p e c Ie d she a r s tu d san d weld s to be a m 10 p fla n 9 e s. Com p lIa n t. Technician: D Wilcher CAWI-02040654 Started: 10:00am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-ec Duke Construction, LP Altn: Mr. Jason Sulzener 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Finished: 02:00pm Rone Engineering /~~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive l!se of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlJB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607189 Project No.: 0711530 Date of Service: 11/28/2007 Report Date: 12/04/2007 Project: Point West Office I Services: Structural Steel Inspection Report of Inspection C 0 lu m n Bas e P la te s L 0 c a tio n: F 0 u n d a tio n , grid lin e s 1 -1 8/A -P . Non Cod e Compliant Compliant AWS 01.1 AIS C Job Specs Anchor Bolt Tension Verification x x Grouted Bas e P la te s x x Comments:lnspected various locations. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/JB) Page 1 of 2