Loading...
Duke Lesley 3C-LR071210 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306776 Project No.: 0711530 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: P136 Specification Req uirements Strength: 3,000 psi @28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 340K1601 Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 09:08am Temperature - Air: 580F Truck No: 0 Air Content: NA Overall Placement Location: 3rd level, slab on deck, grid lines C-P/1-18, building 1 Measured Slump (inches) 4.0 Batch time: 08:39am Concrete: 680F Ticket No: 13602952 Unit Weight (pet): NA Sample Location: Grid lines Cll REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 12/07/2007 7 6.00 28.27 114,380 4,050 Shear 1 2 12/28/2007 28 1 3 12/28/2007 28 1 4 01/25/2008 56 Remarks: Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (TMIKW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306776 Project No.: 0711530 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: P136 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 340K1601 Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 11 :34am Temperature - Air: 580F Truck No: 144 Air Content: NA Overall Placement Location: 3rd level, slab on deck, grid lines C-P/1-18, building 1 Measured Slump (inches) 4.75 Batch time: 11 :02am Concrete: 690F Ticket No: 13602985 Unit Weight (pct): NA Sample Location: Grid lines DI7 REPORT OF TESTS Technician: Donald Patterson Started: 07: 15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-ec Duke Construction, LP Attn: Mr. Jason Sulzener 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Cylinder Marked Date Set No. Tested 2 1 12/07/2007 2 2 12/28/2007 2 3 12/28/2007 2 4 01/25/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 110,150 Compressive Strength (psi) 3,900 Fracture Type Cone/Split Area (in2) 28.27 Finished: 05:15pm Rone Engineering ft~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich,Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306905 Project No.: 0711530 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 9705PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 01 :32pm Temperature - Air: 620F Truck No: 104 Air Content: NA Overall Placement Location: 3rd level, slab on deck, grid lines C-P/1-1 8, building 1 Measured Slump (inches) 6.25 Batch time: 12:59pm Concrete: 690F Ticket No: 17215 Unit Weight (pet): NA Sample Location: Grid lines HIS REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 12/07/2007 7 6.00 28.27 109,240 3,860 Shear 2 12/28/2007 28 3 12/28/2007 28 4 01/25/2008 56 Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306905 Project No.: 0711530 Date of Service: 11/30/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 9705PW Placement Date: 11/30/2007 Weather Conditions: Cloudy Time Sampled: 03:47pm Temperature - Air: 620F Truck No: 128 Air Content: NA Overall Placement Location: 3rd level, slab on deck, grid lines C-P/1-18, building 1 Measured Slump (inches) 6.0 Batch time: 03:38pm Concrete: 720F Ticket No: 17225 Unit Weight (pet): NA Sample Location: Grid lines F/3 REPORT OF TESTS Technician: Donald Patterson Rone Engineering See Report 306776 ",te,h,id" "me~ ~ Report Distribution: ' ~. . . Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne. .. . (1-ec copy) 1-cc Potter Concrete. Attn: Mr Ryan Skelly K. Scott Watson AET 1-ec Duke Construction, LP Attn: Mr. Jason Sulzener p . ct M ' . rOJe anager 1-cc City of Coppel! Attn: Mr. Lee Stone 1-cc City of Coppel! Attn: Mr. Larry Davis Cylinder Marked Date Set No. Tested 2 1 12/07/2007 2 2 12/28/2007 2 3 12/28/2007 2 4 01/25/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 5 gallons Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 95,540 Compressive Strength (psi) 3,380 Fracture Type Shear Area (in') 28.27 ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (1M/KW) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307380 Project No.: 0711530 Date of Service: 12/05/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Slab on deck wire mesh, grid lines 1-9/D-P, 2nd level Item s Ins peeled: Co nfo rming Non Items Inspected: Conforming Non Ilems Ins peeled: Conforming Non Co nfo rm ing Conforming Co nfo rrn ing P lacing Drawings Bar Length Column Ties Properly Approved x and Shape x Tied and Spaced x BarSize x Pro per Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Piace x Lapped Splices x Form Clean x Pro per Bar Suppo rts x Corner Bars NA Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Remove trash. 2. Tie down wire mesh. 3. Adjust dowel bars. Discrepancies noted above were corrected on this date. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307380 Project No.: 0711530 Date of Service: 12/05/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Locations and Items Inspected: Approaches, two on Beltline and one on Dividend Drive. Item s Inspected' Co nforming Non Items Inspected. Co nfo rm ing Non Item. In. pected: Conforming Non Co nfo rm ing Co nfo rm ing Conforming P lac ing Drawings 8 ar Length Column Ties Properly Approved x and Shape x Tied and Spaced NA Bar Size x Proper Bar P lacem ent x Stirrup Spacing NA 8 ar Grade x Pro perly Tied x Stirrup Type NA 8 ars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Proper8arSupports x Co mer Bars x Numberof 8ars x ProperCaver x Mechanical Splices NA Discrepancies I Comments: 1. Tie down steel. 2. Adjust dowels. 3. Add chairs. Discrepancies noted above were corrected on this date. Technician: Jose Villanueva Started: 02:30pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Artn: Mr. Paul Byrne (1-ec copy) 1-ec Duke Construction, LP Artn: Mr. Jason Sulzener 1-cc City of Coppell Artn: Mr. Lee Stone 1-cc City of Coppell Artn: Mr. Larry Davis Finished: 04:00pm Rone Engineering P-~-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307518 Project No.: 0711530 Date of Service: 12/06/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Slab on deck, wire mesh, 2nd floor, grid lines A-M/9-18. Items Inspected: Co nfarming Non Item s Inspected: Conforming Non Item s Ins peeled: Conforming Non Co nfa rming Conforming Conforming P lac ing Drawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x P fa per Bar P laeem ant x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Proper B ar Suppa rts x Corner Bars NA Numberaf Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Trash and debris in placement area. 2. Tie down wire mesh by columns and in various locations. Discrepancies noted above were corrected on this date. Technician: Jose Villanueva Started: 02:30pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-ec Duke Construction, LP Altn: Mr. Jason Sulzener 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 03:45pm Rone Engineering pdd-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 307225 Project No.: 0711530 Date of Service: 12/04/2007 Report Date: 12/10/2007 Project: Point West Office I Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Slab on deck on wire mesh, 3rd floor and leave outs on 1st floor, 3rd floor, grid lines 9-18/A-M, 1st floor, grid lines 10-18/A-M. Item s Inspected: Conforming Non Items Inspected: Conforming Non Item s Inspected: Co nfo rm Ing Non Co nfo rm ing Co nfo rm ing Conforming P lacing Drawings Bar Length Coiumn Ties Properly Approved x and Shape x Tied and Spaced NA BarSize x Pro per B ar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar Suppo rts x Corner 8 ars x Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: Discrepancies noted on report #308096 have been corrected and cleared to compliant status. Technician: Jose Villanueva Started: 02:15pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-ec Duke Construction, LP Attn: Mr. Jason Sulzener 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 03:30pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 1