Loading...
Duke Lesley 3C-LR071214 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607260 Project No.: 0711530 Date of Service: 12/12/2007 Report Date: 12/14/2007 Project: Point West Office I Services: Structural Steel Inspection Structural Fram ing Location: 2nd and 3rd floor, partial bolt tension and weld placem ent verification, grid line 1-17/A-P. Non Code Com pliant Com pliant AWS 01.1 AISC Job Specs Bolt Tension Verification: Beam to Beam x x x Bolt Tension Verification: Beam to Column x x x Bolt Tension Verification: Girder to Colum n Weld Placement Only x x x WQT's Structural Visual Touch-Up Paint Verification Com m ents: Technician: Ron Cuba, CWI-97040341 Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-ec Duke Construction, LP Attn: Mr. Jason Sulzener 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 12:00pm Finished: 06:00pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/JB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Structural Steel Inspection Report No.: 607260 Project No.: 0711530 Date of Service: 12/12/2007 Report Date: 12/14/2007 Project: Point West Office I Services: Structural Steel Inspection Report of Inspection Location: Bar J 0 is ts Barjoistweld placementonly, random inspection, grid lines A-P/1-17. Non Code Comoliant Comoliant AWSD1.1 S JI JobSpecs JoistSeatBearina VisualWeld Verification (PlacementOnlvl x x x Horizontal Bridging Diagonal Bridaina Bottom Chord Stabilization Joist Spacing Peri mete rEd g e A n a Ie Weld Verification W Q T's S tructura I VisualTouch-Up PaintVerification, BarJoist Weld sat S tru c tu ra I F 100 r F ra m in gAs s e m b Iv Com men ts : LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/JB) Page 1 of 2