Duke Lesley 3C-LR071214
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Structural Steel Inspection
Report No.: 607260
Project No.: 0711530
Date of Service: 12/12/2007
Report Date: 12/14/2007
Project: Point West Office I
Services: Structural Steel Inspection
Structural Fram ing
Location:
2nd and 3rd floor, partial bolt tension and weld placem ent verification, grid line 1-17/A-P.
Non Code
Com pliant Com pliant AWS 01.1 AISC Job Specs
Bolt Tension Verification: Beam to Beam x x x
Bolt Tension Verification: Beam to Column x x x
Bolt Tension Verification: Girder to Colum n
Weld Placement Only x x x
WQT's Structural
Visual Touch-Up Paint Verification
Com m ents:
Technician: Ron Cuba, CWI-97040341
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-ec Duke Construction, LP Attn: Mr. Jason Sulzener
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Started: 12:00pm Finished: 06:00pm
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/JB) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Structural Steel Inspection
Report No.: 607260
Project No.: 0711530
Date of Service: 12/12/2007
Report Date: 12/14/2007
Project: Point West Office I
Services: Structural Steel Inspection
Report of Inspection
Location:
Bar J 0 is ts
Barjoistweld placementonly, random inspection, grid lines A-P/1-17.
Non Code
Comoliant Comoliant AWSD1.1 S JI JobSpecs
JoistSeatBearina
VisualWeld Verification (PlacementOnlvl x x x
Horizontal Bridging
Diagonal Bridaina
Bottom Chord Stabilization
Joist Spacing
Peri mete rEd g e A n a Ie Weld Verification
W Q T's S tructura I
VisualTouch-Up PaintVerification, BarJoist
Weld sat S tru c tu ra I F 100 r F ra m in gAs s e m b Iv
Com men ts :
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/JB) Page 1 of 2