Loading...
Duke Lesley 3C-LR071218 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302576 Project No.: 0711530 Date of Service: 10/20/2007 Report Date: 12/18/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 9385 PW Placement Date: 10/20/2007 Weather Conditions: Clear Time Sampled: 06:30am Temperature - Air: 560F Truck No: 129 Air Content: NA Overall Placement Location: Tilt Wall Panels Measured Slump (inches) 6.0 Batch time: 06:08am Concrete: 780F Ticket No: 8055 Unit Weight (pet): NA Sample Location: Panel 67 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 10/25/2007 5 6.00 28.27 117,470 4,150 Cone/Split 1 2 10/25/2007 5 6.00 28.27 116,810 4,130 Cone/Split Average 4,140 1 3 10/27/2007 7 6.00 28.27 117,890 4,170 Cone/Split 1 4 11/17/2007 28 6.00 28.27 163,200 5,770 Cone/Split 1 5 11/17/2007 28 6.00 28.27 160,750 5,690 Cone/Shear Average 5,730 1 6 12/15/2007 56 6.00 28.27 179,580 6,350 Cone/Split LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 6 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 302576 Project No.: 0711530 Date of Service: 10/20/2007 Report Date: 12/18/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 9385 PW Placement Date: 10/20/2007 Weather Conditions: Clear Time Sampled: 08:18am Temperature - Air: 590F Truck No: 134 Air Content: NA Overall Placement Location: Tilt Wall Panels Batch time: 07:38am Concrete: 780F Ticket No: 8064 Unit Weight (pet): NA Measured Slump (inches) 6.25 Sample Location: Panel 71 center REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 10/25/2007 5 6.00 28.27 120,060 4,250 Cone/Split 2 2 10/25/2007 5 6.00 28.27 125,600 4,440 Cone/Split Average 4,340 2 3 10/27/2007 7 6.00 28.27 125,160 4,430 Cone/Split 2 4 11/17/2007 28 6.00 28.27 172,420 6,100 Cone/Shear 2 5 11/17/2007 28 6.00 28.27 167,380 5,920 Cone/Split Average 6,010 2 6 12/15/2007 56 6.00 28.27 185,920 6,580 Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 2 of 6 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 302576 Project No.: 0711530 Date of Service: 10/20/2007 Report Date: 12/18/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 9385 PW Placement Date: 10/20/2007 Weather Conditions: Clear Time Sampled: 09:47am Temperature - Air: 640F Truck No: 134 Air Content: NA Overall Placement Location: Tilt Wall Panels Batch time: 09:01am Concrete: 850F Ticket No: 8075 Unit Weight (pef): NA Measured Slump (inches) 5.75 Sample Location: Panel 65 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 10/25/2007 5 6.00 28.27 122,030 4,320 Cone/Shear 3 2 10/25/2007 5 6.00 28.27 114,750 4,060 Cone/Split Average 4,190 3 3 10/27/2007 7 6.00 28.27 126,630 4,480 Shear 3 4 11/17/2007 28 6.00 28.27 170,280 6,020 Cone/Shear 3 5 11/17/2007 28 6.00 28.27 170,115 6,020 Cone/Split Average 6,020 3 6 12/15/2007 56 6.00 28.27 193,490 6,840 Shear LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 3 of 6 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich,Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302576 Project No.: 0711530 Date of Service: 10/20/2007 Report Date: 12/18/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back. to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requ irements Strength: 5,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 9385 PW Placement Date: 10/20/2007 Weather Conditions: Clear Time Sampled: 11 :OOam Temperature - Air: 680F Truck No: 103 Air Content: NA Overall Placement Location: Tilt Wall Panels Batch time: 1 0:24am Concrete: 850F Ticket No: 8086 Unit Weight (pet): NA Measu red Slump (inches) 6.0 Sample Location: Panel 60 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 4 1 10/25/2007 5 6.00 28.27 122,700 4,340 Cone/Split 4 2 10/25/2007 5 6.00 28.27 120,090 4,250 Cone/Split Average 4,290 4 3 10/27/2007 7 6.00 28.27 118,670 4,200 Cone/Split 4 4 11/17/2007 28 6.00 28.27 168,640 5,960 Cone/Split 4 5 11/17/2007 28 6.00 28.27 167,110 5,910 Cone/Split Average 5,940 4 6 12/15/2007 56 6.00 28.27 188,580 6,670 Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 4 of 6 Rone En2== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302576 Project No.: 0711530 Date of Service: 10/20/2007 Report Date: 12/18/2007 Proje~: Point West Office I ServiceS: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring I samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 9385 PW Placement Date: 10/20/2007 Weather Conditions: Clear Time Sampled: 12:38pm Temperature - Air: 750F Truck No: 110 Air Content: NA Overall Placement Location: Tilt Wall Panels Measured Slump (inches) 5.5 Batch time: 11 :58am Concrete: 860F Ticket No: 8096 Unit Weight (pct): NA Sample Location: Panel 55 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 10/25/2007 5 6.00 28.27 118,220 4,180 Shear 5 2 10/25/2007 5 6.00 28.27 118,530 4,190 Shear Average 4,190 5 3 10/27/2007 7 6.00 28.27 124,940 4,420 Cone/Split 5 4 11/17/2007 28 6.00 28.27 165,480 5,850 Cone/Split 5 5 11/17/2007 28 6.00 28.27 166,630 5,890 Cone/Shear Average 5,870 5 6 12/15/2007 56 6.00 28.27 191,240 6,760 Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be rep;oduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 5 of 6 Rone Eni== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 302576 Project No.: 0711530 Date of Service: 10/20/2007 Report Date: 12/18/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 5,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9385 PW Placement Date: 10/20/2007 Weather Conditions: Clear Time Sampled: 02:13pm Temperature - Air: 780F Truck No: 103 Air Content: NA Overall Placement Location: Tilt Wall Panels Batch time: 01:51pm Concrete: 890F Ticket No: 8106 Unit Weight (pet): NA Measured Slump (inches) 5.75 Sample Location: Panel 23 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 10/23/2007 3 6.00 28.27 103,680 3,670 Shear 6 2 10/25/2007 5 6.00 28.27 127,410 4,510 Cone/Split 6 3 10/27/2007 7 6.00 28.27 142,840 5,050 Cone/Split 6 4 11/17/2007 28 6.00 28.27 178,160 6,300 Cone/Split 6 5 11/17/2007 28 6.00 28.27 179,760 6,360 Cone/Shear Average 6,330 6 6 12/15/2007 56 6.00 28.27 199,270 7,050 Cone/Split Started: 05:15am Finished: 03:30pm Technician: Jason Shipe Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byme (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 6 of 6