Loading...
Duke Lesley 3C-LR071220 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 306150 Project No.: 0711530 Date of Service: 11/21/2007 Report Date: 12/20/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 9701 PW Placement Date: 11/21/2007 Weather Conditions: Cloudy Time Sampled: 08:00am Temperature - Air: 640F Truck No: 104 Air Content: NA Overall Placement Location: Slab Leave-out Measured Slump (inches) 5.0 Batch time: 07: 18am Concrete: 800F Ticket No: 16957 Unit Weight (pcf): NA Sample Location: same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 11/28/2007 7 6.00 28.27 103,550 3,660 Cone/Split 1 2 12/19/2007 28 6.00 28.27 148,050 5,240 Cone/Split 1 3 12/19/2007 28 6.00 28.27 146,000 5,160 Cone/Split Average 5,200 1 4 01/16/2008 56 Remarks: Water added at site: 20 gallons Started: 06:15am Finished: 09:30am Technician: Jason Shipe Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p-~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Pachometer Inspection Report No.: 308254 Project No.: 0711530 Date of Service: 12/17/2007 Report Date: 12/20/2007 Project: Point West Office I Services: Pachometer Inspection Report of Inspection Descriotion Location S lab on Grade Structural Slab Column P a vi n a Grade Beam CMU Block Tilt Wall Panel Panel19, 3rd level, where concrete is busted out Other Locations of what appeared to be Reinforcing Steel were marked on the surface of the areas requested by the client. Every effort has been made to locate all reinforcing in the designated areas. However, this method of location is affected by both depth of the reinforcing, the close proxim ity of any type of metal to the area being inspected and the presence of an electromagnetic field. This inspection does not provide the In the event any type of metal is encountered during drilling operations, drilling should be discontined until further drilling is authorized by the engineer of record. Rone Engineering should be notified if further assistance is required in reviewing the area to be drilled. Remarks: Both horizontal and vertical bars appear to be spaced 12" apart. 3" from edge, 4' x 6' area, checked both sides. Technician: Dickie Timmons Started: 08:45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-ec Duke Construction, LP Attn: Mr. Jason Sulzener 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 1 0:45am Rone Engineering p~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1