Loading...
Duke Lesley 2A-CS070107 THE.CITY.OF corrELL s MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING From: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Fire Marshal Larry Davis, Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 To: Date: January 7,2008 RE: W ALK- THRU INSPECTION Duke Lesley Addition, Lot 2 Block A (Point West VII) A final walk-thru for utilities only on the referenced project has been scheduled for: Thursday, January 10, 2008 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Paul Brynes, fax # 972/361-6800 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"