Loading...
Alexander Ct-CS070530 Page 1 of 1 Ken Griffin - Fwd: Grapevine Creek/Alexander Court LOMR Review _'ilif ~lJI i [f:fI.r^.-T.~"'~.I~ lli1l81i 1itll::HIUil~_ll WiJm ~I -- !JUt'lL ~L~- a:-ir'""-hK~"'},"'#~~~~~~:-';;-;;:ES:~ From: To: Date: Subject: CC: Attachments: Ken Griffin mboyd@ndmce.com 5/30/2007 12:55 PM Fwd: Grapevine Creek! Alexander Court LOMR Review brad. pickering@kimley-horn.com 20070523.pdf Mike The review letter from Kimley-Hom for the Alexander flood study is attached. Please make necessary changes. It probably would be quicker to work directly with K-H. Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kg-Ii ffi1}@ci.cQlli2t;ll.tX.JIS >>> <brad.pickering@kimley-hom.com> 5/23/20075:01 PM >>> Ken: As discussed this afternoon with Nadia Dahab, attached are KHA's comments for the Grapevine Creek LOMR application for Alexander Court, dated April 26, 2007, prepared by Nathan D. Maier Consulting Engineers, Inc. If you have any questions regarding the attached comments, please do not hesitate to give us a call. Thank you, Brad W. Pickering, EIT (IN), CFM Kimley-Horn and Associates, Inc. 12700 Park Central Drive, Suite 1800 Dallas, TX 75251 p: (972) 776-1781 f: (972) 239-3820 e: brad.pickering@kimley-horn.com file://C:\Documents and Settings\rbrother\Local Settings\Temp\XPgrpwise\465D7427City _'" 1/8/2008 i (1/8/2008) Ken Griffin - Grapevine Creek/Alexander Court LOMRReview _______._.______~_~"_________'_.______.:"c:"'.".~._.___.._'__-'-__._' .. ......... ..'"-'-"---'-_~~'c_.____'_...;___"'"~~-_"__..c_'_'~~_'_c._'___c;._'_~~~_.'_:":;...::....---'-_~_'"_~_._....:.;;.;;.c~__'____......':..."'~,;,__....c.:....._,~~._.___._ ~- .Page11 ,.=___c_~____.__1 From: To: CC: Date: Subject: Attachments: <brad .pickering@kimley-horn.com> <kgriffin@ci.coppell.tx.us> <Steve.Galloway@kimley-horn.com>, <Ebenezer.chiluka@kimley-horn.com>, <n... 5/23/2007 5:06 PM Grapevine Creek/Alexander Court LOMR Review 20070523.pdf Ken: As discussed this afternoon with Nadia Dahab, attached are KHA's comments for the Grapevine Creek LOMR application for Alexander Court, dated April 26, 2007, prepared by Nathan D. Maier Consulting Engineers, Inc. If you have any questions regarding the attached comments, please do not hesitate to give us a call. Thank you, Brad W. Pickering, EIT (IN), CFM Kimley-Horn and Associates, Inc. 12700 Park Central Drive, Suite 1800 Dallas, TX 75251 p: (972) 776-1781 f: (972) 239-3820 e: brad.pickering@kimley-horn.com ~=r~ Kimley-Horn and Associates, Inc. May 23, 2007 Mr. Kenneth M. Griffin, P.R. Director of Engineering/Public Works 255 Parkway Boulevard Coppell, TX 75019 RE: Letter of Map Revision (LOMR) Review Grapevine Creek/Alexander Court KHA No.: 063124008 Dear Mr. Griffin: Kimley-Horn and Associates, Inc. (KHA) has performed the first review of the Grapevine Creek LOMR application for Alexander Court, dated April 26, 2007, prepared by Nathan D. Maier Consulting Engineers, Inc. (NDMCE). KHA reviewed the document for adherence to currently published City of Coppell and Federal Emergency Management Agency (FEMA) drainage design guidelines. KHA recommends that NDMCE address the following items: 1. The MT -2 Form 2, page 1 of 2, states that the upstream tie-in of the study is at cross section 27620. Cross section 27900 has been added to the revised existing conditions model and is not included in the effective model. Revise the forms to reflect an effective tie-in upstream of the model modifications. 2. Revise the Floodplain Work Map to include the benchmarks and vertical datum used for the on-ground survey. 3. The water surface elevations table in the report text is not consistent with the modeling output for the effective floodway HEC-RAS model. Revise the report to be consistent with the modeling output. 4. Revise the Location Map to reflect the boundaries of the LOMR submittal. 5. Cross section 22600, the location of the downstream effective tie-in, is not shown on the Floodplain Work Map. Revise the workmap to show this cross section. . TEL 972 770 1300 FAX 972 239 3820 . Suite 1800 12700 Park Central Drive Dallas, Texas 7525t ~=~ Kimley-Horn and Associates, Inc. Mr. Kenneth M. Griffin May 23, 2007 Page 2of2 6. The sum of reach lengths for the HEC-RAS revised condition model does not match the sum of the reach lengths in the FEMA effective model. Revise the reach lengths in the revised condition model or explain this discrepancy. 7. The report text states that Manning's 'n' values were taken from the effective model, but they vary from the effective model at multiple locations. Revise the model to be consistent with the effective modeling or justify the proposed Manning's 'n' values. 8. Property owner notification is required by NFIP regulations 65.7(b)(1) due to the floodway revision. The notices must include the extent of revision, the changes to the floodway, and contact information for any interested parties. 9. Revise the legend on the Floodplain Work Map to reflect revised existing conditions and not proposed conditions. 10. Future development adjacent to the subject reach shall respect both the 100-year fully developed and FEMA effective floodplain boundaries. Please note that any future development adjacent to the subject reach will need to comply with all of the provisions set forth in the ordinances of the City of Coppell including, but not limited to, the Subdivision Ordinance, Zoning Ordinance, and Floodplain Management Ordinance. If you have any questions regarding the comments included in this letter, please feel free to contact us at 972.770.1300. Sincerely, KTMI"EY-HORN AND ASSOCIATES, INC. ~~96~ Steven D. Galloway, P.E., CFM ~(k:~rr'CFM G:\HYDRO\PROJECTS\63 I 24008\Alexander Court\20070523.doc