DR9001-CS 900110Summary of Connell Drainway Events For January 10, 1990 Meeting 1. Minutes 06-23-87 CC approves Connell Skaggs Addition; lots 1,2, and 3, final plat, site plan, and landscape plans. Stipulations (2) 1. Satisfy staff 2. Screening wall with culvert 2. Packet 06-23-87 3. Agreement 12-11-86 Maint. agreement? Wayne Ginn said to be built with H.S. culvert. Kevin C. ~Vhite letter. - Per City Engineer and upon CC approval, they will build on and off site work. - Letter of credit removed and City accepted written commitment. - Downstream reimbursement pro rata? - All else intact. Where as - Exhibit I (The Plat) - Preliminary approved subject to drainage plan satisfactory to City Engineer. - Original request by CE 10x8 single conc. box culvert point A to B on Exhibit I. 100 year for upstream, too deep until across, Boorhem and Hinckley. - Existing channel handle flows? - Lot 3 will require additional drainage and is Phase Two. 1. Preliminary plat ammended into 2 phases. 2. Need copies of Engineering report showing no damage down stream. City hold harmless, but they have right to participate. 3. Deed restriction for Phase Two. 4. Final Plat 2 or 3 escrow $345,000 or letter of credit. a. 10x8 recommendation CE A to B H.S. site, City option. b. Pro rata agreement with Connel, 10 years, Hinckley/Boorhem per Exhibit c. Interest Connell and Exhibit 2. d. 15 year like to 12-11-2001. 05-17-89 05-17-89 05-20-89 06-05-89 06-15-89 06-16-89 06-27-89 07-12-89 07-24-89 08-07-89 08-17-89 08-31-89 09-05-89 10-23-89 10-25-89 Connell proposes the following: 1. Two 12x4 boxes to his north line. 2. Then temporary channel to north, 4:1 Rip Rap Pilot Channel. 3. Will waive pro rata for $345,000 budget. Ginn's memo, street flooding and extras/$. Doyle's letter requested action. Connell's letter to Ginn "When City Engineer believes box needed". Ginn's memo, to contractor quality control problems. Ginn's memo, added floeding more extra. Extra claim. Connell's letter cost now $701,000 (Sent to Jackson on 06-28-89). Ginn's memo, two 12x4 ok, not ditch. Powell comments on Ginn, 07-17-89 letter. Doyle requesting CC submittal. Connell's letter with marked up agreement. Varonich's memo/Connell was in court. CC packet delayed, then Jackson/Trando/Doyle meeting around Oct. 89. ADR has Connell/City Secretary file. Estimated $310,177.34, Connell never submitted detailed estimate, then on hold.