Loading...
Alexander Ct-CS070821 ! (1 /~~9~~t~~~ Gr~f!i!l~2rapevi~e C..~ek/~Iexa~~ergourturtimat~:s't@y~~vi~~ From: To: CC: Date: Subject: Attachments: <brad .pickering@kimley-horn.com> <kgriffin@ci.coppell.tx.us> <mboyd@ndmce.com>, <ojohnson@ndmce.com> 8/21/20076:12 PM Grapevine Creek/Alexander Court Ultimate Study Review 20070821.pdf Ken, Attached is the review letter for the Grapevine Creek/Alexander Court Ultimate Study, dated August 2007, prepared by Nathan D. Maier Consulting Engineers, Inc. You will receive a hardcopy of the review letter by mail. If you have any questions, please do not hesitate to contact me. Thanks, Brad Pickering, EIT (TX), CFM Kimley-Horn and Associates, Inc. 12700 Park Central Drive, Suite 1800 Dallas, Texas 75251 p: (972) 776-1781 f: (972) 239-3820 e: brad.pickering@kimley-horn.com <mailto: brad .pickering@kimley-horn.com> ~C-~~~-I Page 1 : .:-.-'--,..:,....'..m...__......l ~=~ Kimley.Horn and Associates, Inc. August 21, 2007 Mr. Kenneth M. Griffin, P.E. Director of EngineeringlPublic Works 255 Parkway Boulevard Coppell, TX 75019 RE: Ultimate Condition Study Review Grapevine Creek/Alexander Court KHA No.: 063124008 Dear Mr. Griffm: Kimley-Horn and Associates, Inc. (KHA) has performed the ftrst review of the Grapevine Creek illtimate Conditions Study for Alexander Court, dated August 2007, prepared by Nathan D. Maier Consulting Engineers, Inc. (NDMCE). KHA reviewed the document for adherence to currently published City of Coppell drainage design guidelines. KHA recommends that NDMCE address the following items: 1. The flow change locations used in the ultimate conditions study are inconsistent with the flow change locations in the City-Wide Storm Water Management Study for the City of Coppel!, dated January 1991, prepared by Albert H. HaltI Associates, Inc. Revise the flow change locations to be consistent with the Halff study or explain the discrepancy. 2. The known starting water surface elevation used for the ultimate condition proftle is inconsistent with the City-Wide Storm Water Management Study for the City ofCappell. Revise the starting water surface elevation to be consistent with the Halff study or explain the discrepancy. 3. The mapped top width at cross section 27540 does not reflect the HEC- RAS model output. Revise the floodplain delineation at this cross section to be consistent with the HEC-RAS model. 4. Revise the Floodplain Work Map to show the entire studied reach, the extent of the model cross sections, and the cross section labels. 5. The Floodplain Work Map or report should include a water surface elevation table showing the ultimate condition water surface elevation for each lot to be used to set the minimum ftnished floor elevation. . TEL 972 no 1300 FAX 972 239 3820 . Slite 1800 12700 Park Central Drive Dallas, Texas 75251 ~=~ Kimley-Horn and Associates, Inc. Mr. Kenneth M. Griffm, P.E. August 21, 2007 Page 2 of2 Please note that the ultimate condition floodplain delineation encroaches heavily on several of the proposed lots. Should any grading be proposed within the ultimate condition floodplain boundary, a proposed condition floodplain study will need to be submitted to the City for review. If you have any questions regarding the comments included in this letter, please feel free to contact us at 972.770.1300. Sincerely, KIMLEY.HORN AND ASSOCIATES, INC. ~-,..~ Steven D. Galloway, P.E., CFM ~_~.CFM Cc: Michael Boyd, P.E.; Nathan D. Maier Consulting Engineers, Inc. G:\HYDRO\PROJECTS\63124008\Alexander Court\20070821.doc