ST9905-CS071213 Page 1 of 1 Rhonda Adloo - Re: Bethel Business Park From: Ken Griffin To: Matt Goodwin Date: 12/13/2007 8:19 AM Subject: Re: Bethel Business Park CC: Keith Marvin; Rhonda Adloo Matt The way these situations are typically handled is that the development pours through their stamped concrete section and then transitions back to the existing road with asphalt. There is no need to provide the asphalt transition in this situation, but you would need to pour through the stamped concrete section. The time line for this section of Bethel Road was by the end of the year. With the recent weather change we do not believe they will make that schedule. Most likely this section will happen in mid to late January. Sorry I didn't get your call returned yesterday. Every Wednesday is non stop staff meetings. Is this what you needed to discuss or do we still need to touch base about something else? Let me know. Ken Griffin >>> "Matt Goodwin" <mgoodwin@gmcivil.com> 12/13/2007 7:52 AM >>> Ken - a question for you - on Bethel Road we have two driveway access points. It would appear we may pave before Bethel Road. What are our limits of construction? The most sense would be to pour to the curb returns and constructing a header. Then Tiseo paves from back of curb to the return. This is obviously not in their original scope, but would not be necessary if they were on schedule. For us to pour to the curb line would probably cause more problems than it solved. Any thoughts? What is the schedule for this section of Bethel Road? file://C:\Documents and Settings\rbrother\Local Settings\Temp\XPgrpwise\4760EAFFCity... 1/11/2008