Alexander Ct-CS080107 NATIONAL FLOOD INSURANCE PROGRAM FEMA NATIONAL SERVICE PROVIDER JanuaI)' 7, 2008 Mr. Michael H. Boyd, P.E. Executive Vice President Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, TX 75231 IN REPLY REFER TO: Case No.: 07-06-2203P Community: City of Coppell, TX Community No.: 480170 316-AD Dear Mr. Boyd: This is in regard to your submittal dated November 14, 2007, concerning a July 26, 2007, request that the Department of Homeland Security's Federal Emergency Management Agency (FEMA) issue a revision to the Flood Insurance Rate Map (FIRM) for the Dallas County, Texas and Incorporated Areas. Pertinent information about the request is listed below. Identifier: Grapevine Creek Flooding Source: Grapevine Creek FIRM Panel( s) Affected: 48113C0155 J The data required to complete our review, which must be submitted within 90 days of the date of this letter, are listed on the enclosed summary. If we do not receive the required data within 90 days, we will suspend our processing of your request Any data submitted after 90 days will be treated as an original submittal and will be subject to all submittal/payment procedures, including the flat review and processing fee for requests of this type established by the current fee schedule. A copy of the notice summarizing the current fee schedule, which was published in the Federal Register, is enclosed for your information~ FEMA receives a very large volume of requests and cannot maintain inactive requests for an indefinite period of time. Therefore, we are unable to grant extensions for the submission of required data for revision requests. If a requester is informed by letter that additional data are required to complete our review of a request, the data/fee must be submitted within 90 days of the date of the letter~ Any fees already paid will be forfeited for any request for which the requested data are not received within 90 days~ If you have general questions about your request, FEMA policy, or the National Flood Insurance Program, please call the FEMA Map Assistance Center, toll free, at 1-877-FEMA MAP (1-877-336-2627). If you have specific questions concerning your request, please contact your case reviewer, Mr. Kathirvel Arumugam, bye-mail at kathirveLarumugam@mapmodteam.com or by telephone at 3601 Eisenhower Avenue.. Alexandria.. VA 22304-6425 PH:1-877-FEMA MAP FX: 703~960.9125 The Mapping on Demand Team, under contract with the Federal Emergency Management Agency, is the National Service Provider for the National Flood Insurance Program 2 (703) 960-8800, extension 3026. You may also contact the Revisions Coordinator for your State, M. Saleem Ashraf, Ph.D., P.E., bye-mail at saleem.ashraf@mapmodteam.com or by telephone at (703) 317-6225. Sincerely, ~~v~ Syed Qayum, CFM National LOMR Technical Manager Michael Baker Jr., Inc. Enclosures cc: Mr. Ken Griffin, P.E. Director of Engineering Department of Public Works City of Coppell NATIONAL FLOOD INSURANCE PROGRAM FEMA NATIONAL SERVICE PROVIDER Summary of Additional Data Required to Support a Letter of Map Revision Case No.: 07-06-2203P Requester: Mr. Michael H. Boyd, P~E~ Community: City of Coppell, TX Community No.: 480170 The issues listed below must be addressed before we can continue the review of your request 1. Please submit a copy of the individual legal notice sent to all property owners affected by any widening and/or shifting of the Special Flood Hazard Area, the area that would be inundated by the base (I-percent annual-chance) flood, and/or any increases in the Base Flood Elevation (BFE). The notice must include a descriptive explanation of these changes~ Please follow the template for this letter on page 17 of the instructions for the MT -2 Application/Certification forms, which may be accessed at bttp://www. fema. gov /pdf/ fhmImt -2. pdf. 2. Paragraph 65.6(a)(2) of the National Flood Insurance Program regulations states that to avoid discontinuities between revised and unrevised flood data, hydraulic analyses must have a logical transition between revised BFEs and those developed previously for areas not affected by the revision. Our review revealed that the submitted post-project conditions hydraulic model for Grapevine Creek does not tie into the effective hydraulic analysis within O~5 foot at the upstream end of the revised reach. Please provide a revised hydraulic model for Grapevine Creek that ties into the effective hydraulic analysis within 0.5 foot, or within 0.0 feet ifpractical. 3~ Please address the following comments regarding the submitted post-project conditions HEC-RAS hydraulic models, or provide an explanation for each. a. Our review revealed that the contraction and expansion loss coefficients at Cross Sections 25550 and 27620, which were 0.1 and 0.3, respectively, do not reflect modeling practices generally accepted in HEC-RAS. Contraction and expansion loss coefficients of 0.3 and 0.5, respectively, may be more appropriate. b~ Please revise the post-project conditions hydraulic model so that the left and right encroachment stations at Cross Sections 23900, 27400, and 27900 are located at the left or right channel bank stations or in the floodway fringe, the area between the channel bank station and the limits of the base floodplain. 4. The submitted work map entitled, "'Sheet 1, Floodplain Work Map," dated November 2007, prepared by your firm, does not include the flow line, floodway and floodplain delineations between Cross Sections 27900 and 30130. Please submit a revised topographic work map, certified by a registered professional engineer, using an appropriate scale, that reflects any changes resulting from Items 2 and 3 above, and contains all applicable items listed in Section C of Application/Certification Form 2, entitled '~Riverine Hydrology & Hydraulics Form," including the following: a. The effective boundary delineations of the regulatory floodway, base floodplain, and O.2-percent-annuaI-chance floodplain and how they tie into the post-project conditions boundary delineations at the upstream and downstream limits of the revision area; 3601 Eisenhower Avenue, Alexandria, VA 223~25 PH:1-877-FEMA MAP FX: 703.960..9125 The Mapping on Demand Team, under contract with the Federal Emergency Management Agency, is the National Service Provider for the National Flood Insurance Program 2 b. The topographic information, with labeled contour lines, used for the floodway and floodplain boundary delineations; c. The locations and alignments of the cross sections used in the hydraulic analysis; d. A north arrow, the scale, and the vertical datum; and e. The flow line used in the hydraulic model. If digital data are submitted, please include any supporting documentation or metadata with the data submittal, including relevant projection information. Current mapping standards use the Unive~l Transverse Mercator (UTM) projection and State Plane Coordinate System, in accordance with Federal Emergency Management Agency mapping specifications. Data not submitted in ESRI mapping format can be submitted in any supported data format, which includes AutoCAD, Microstation, and MapInfo. 5. Please submit a copy of a certified, annotated Flood Insurance Rate Map (FIRM), at the scale of the effective FIRM, which reflects any revisions made to the floodway and floodplain boundary delineations as a result of Items 2 through 4. Please send the required data directly to us at the address shown at the bottom of the fIrSt page. For identification purposes, please include the case number referenced above on all correspondence. :j.": ? ~ i:::-!...., ~' -',,"': : .~~.. :- ~.~..\ C " " . ;.,"'/~ \.;- ., ~ ~-' .,."; (~"~J =-.l.~~ Federal Emergency Management Agency WAlhinponf DIe, IO~72 FEE SCHEDULE FOR PROCESSING REQUESTS FOR MAP CHANGES This notice contains the fee schedule for processing certain types of requests for changes to National Flood Insurance Program (NFIP) maps. The fee schedule allows FEMA to further reduce the expenses to the NFIP by more fully recovering the costs associated with processing conditional and final map change ~uests. The fee schedule for map changes is effective for all requests dated October I. 2007. or later and supersedes the fee schedule that was established on October 30, 2005. To develop the fee schedule for conditional and final map change requests~ FEMA evaluated the actual costs of reviewing and processing requests for Conditional Letters of Map Amendment (CWMAs), Conditional Letters of Map Revision = Based on Fill (CLOMR-Fs). CoDditionaJ Letters of Map Revision (CWMRs), Letters of Map Revision "'" Based on Fill (LOMR-Fs), and Letters of Map Revision (WMRs).. Based on OUT review of actual oost data for Fiscal Years 2005 and 2006. FEMA has maintained the following review and processing fees. which are to be sUbmitted with all requests that are not otherwise exempted under 44 eFR 72.5.. . Fee Scbedule for Requests for CLOMAs, CWMR-Fs, and LOMR-Fs RC<f1est for single-lotIsingle~structure C LO MA and CLO MR -F m_..... ...._ ____ __. __. ___. _. __ __ ____ __ __... _ __ _. __ __ . . . _. __ .. $500 Retluest for single-loti single structure LO MR -F.. -- . -- --... .. --. '''''''''''--'' __ __..... ___..... ..__. __..... "oo... __... ....oo. .. . . .. __ $425 Request for single-Iot/single-structure LOMR-F based on as-built infonnation (CLOMR-F previously issued by FEMA) oo.........-..--.._.oo_______.__oo_.____....__.......____._.oo..oo.__oo $325 Request for multiple-lotImultiple-structure C LO MA . -- --. ..oo...oo... ..... _ __. "'" .__....... ....m ....... ___.... . ____ ... ...... ___ $ 700 Request for multiple-lotImultiple-structure C LOMR -F and LOMR -F .--...... .___. ............... '''''' __....__.. .. . .. . __. $ 800 Request for multiple-lotImultiple-structure LOMR-F based on as-built information (CLOMR-F previously issued by FEMA) 4....~UH...._......uu....u-u...u.....UU.UhHUHU....H....HU....U. $700 Based on oue review of actual cost data for Fiscal Years 2005 and 2006. FEMA has established the following review and processing fees. which are to be submitted with all requests that are not otherwise exempted. Fee Schedule for Requests for CLOMRs Request based on new hydrology, bridge~ culvert, channel, or combination of any of these.................. ......................... ........... ............. """"'_"'" .......__.... .......... ....... """"" .......... $4.400 Request based on levee. berm, or other structural measure . ...........__..................... ............ .............. . .. .... $5.500 Fee Schedule for Requests (or Map Revisions Requesters must submit the review and processing fees shown below with requests for LOMRs that are not based on structural measures or alluvial fans.. Request based on bridge. cui vert, channel. or combination of these ... ........ ...... ~_ ............... ........ . ........... $4,800 Request based on levee, berm, or other structural measure ........-......._.........___..............._....................... $6,500 Request based on as-built information submitted as follow-up to CWMR................._......................... $4.800