Loading...
Vista Ridge Retail-CS080108 THE.CITY OF COPPELL ,A, .) January 8, 2008 !\1ichael Doggett P.E \Vinklemann & Associates 6750 Hillcrest Plaza Dr., Ste. 100 Dallas, TX 75230 RE: Vista Ridge Retail, Lots lAR-7 Block A Fee Assessment Letter Dear 1\1r. Doggett: Enclosed is a copy of the City of Coppell Development Fce Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $94.770.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2~'o & 4% construction inspection fee can be verified. The construction inspection fees must be raid prior to scheduling a pre-construction meeting. The additional fees for water and sewer taps, \vater meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters \vill be ordered when those fees arc paid. Appropriate payment of the required fees \vill help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely. \lichael Garza, EIT Graduate Engineer /~ cc: Jennifer Miller, Finance Director !vlary Beth Spletzer. Administrative Secretary, Building Inspections Glenn I Iollowell. Assistant Director of Public \Vorks Cireg Jones, Chief Building Official Brad Reid. Director of Parks and Recreation 2 '_; ':::: ;:C' L.. R K '<;, k Y * P 8 [J () j., 9 a -} 8 * C' P P L L '_ T ^ i 5 C I Y * -:- E L Cj 7 2 L1 C~' CJ 0 2 2 * t- A X 9 7 2 " ::3 0 <'1 ~1 6 7 3 DEVELOPMENT FEE TABLE Project: Date: Vista Ridge Retail Lots 6& 7 1l/14/2007rel'.(J 2/17/2007) TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fce $21,150.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $450.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $787.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $196.08 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $180.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $14,391.00 (100% due at Issuance of Building Permit) \Vastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $94,770.00 $94,770.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Stm1 of Construction) ITOTAL II $132,314.581 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $94,770.00 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: Vista Ridge Retail Lots 6& 7 11/14/2007rev. (12/17/2007) Water Impact Fee: Domestic Meter(s): Irrigation Meter(s) Fireline Meter(s): 3 - 2 inch 3 - 1 inch o 3 - 8 Inch = 15.99 ESU's = 501 ESU's = 0 ESU's = 2.5 ESU's Total #: 235 ESU's @ $90000 ea. (Due prior to issuance of building permit) $21,15000 Water Tap Inspection Fee: Total # 9 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $450.00 Domestic Water Meter Fee: Total # 3 Domestic Meter(s) @ $262.50 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $787.50 IrrigationlFireline Water Meter Fee: Total # 3 Irrigation Meter(s) @ Total # 0 Additional Irrigation Meter(s) @ Total # 3 Fireline Meter(s) @ (100% due prtor to issuance of water meters) $65.36 $0.00 n/a $196.08 $0.00 meter provided by developer Domestic Water Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $90.00 Irrigation/Fire Meter Deposit Fee: Total #: 6 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $180.00 Wastewater Impact Fee: Total Domestic Meters ESU's 1599 @ $90000 ea. (Due prior to issuance of building permit) $14,391.00 Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) $150.00 Utility Final Inspection Fee (All developments): Total #: 3 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $150.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 o o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T. U. Electric submits the lighting plan for the proposed development Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $94,770.00 Information not Available Information not Available Information not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Vista Ridge Retaillvts 6& 7 1l/14/2007rev. (/2/17/2007) ROADW A Y IMPACT FEE: Service Area * I Category * * Retail/Commercial Land Use ** Super market Building Area (sf) 90,000 Development Units ** 90.00 Vehicle Miles per Development Unit ** 7.02 Fee per Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $94,770.00 * (Figure 4. I - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) ** * (Schedule 2, Page 3 - The Master Fee Schedule) AMOUNT DUE.. $94,770.<:lO I