Loading...
Duke Lesley 2A-CS080111 (2) Jan 11 08 09:39a TO: FROM: DATE: REF: Debbie Ingram 972-462-5199 p.1 I\\'\~~~ THE.CITY.OF COPPELL ~~... l' <lo e q .t i\ 6 . I" Larry Davis, Engineering Fj.J~ C:p'1 ttJ t. Vv F--L MEMORANDUM Danny Hightower, Public Works January 11,2008 Point West VII, Lot 2, Block A (Duke-Leslie Addition) Paint vault lids blue Vaults need to be 3" higher than ground grade Paperwork on two DC's in vaults. Meter number, meter reading, and serial number off DC's to Service Center. Check for two DC's paperwork Third FH from southwest vault needs blue street marker button Need to work three FH valves in north parking lot - covered by cars at the time of inspection. 7 _ Need extension on FH valve to Building 6, northeast of Building 7 8. Mark FHV in red on curb and paint lid red 9. First MH west of building needs chimney seal 10. Second MIl needs chimney seal ll. Third manhole needs chimney seal, rainpan, and grate. Pipe inside MH ,-"t. '1'" (j,~ \It " 1. 2. 3. 4. 5. 6. C&1/9:;'-4~2-F/; ~ ;;h;7;-FY t>7;O;t; check pW1Ch list aftet work is done.