Loading...
Duke Lesley-CS080115 Page 1 of 1 Keith Marvin - Dividend/Beltline gutter capacity From:   "Jack Evans" <jevans@pkce.com> To:   "Keith Marvin" <KMARVIN@ci.coppell.tx.us> Date:   1/14/2008 6:38 PM Subject:   Dividend/Beltline gutter capacity CC:   "Alex Bennett" <Alex.Bennett@dukerealty.com>   Keith,   I will be emailing you a letter on letterhead (with my seal) stating this in the morning, but for now here is what we have calculated.  The total contributing area to the first curb inlet just south of the intersection of Beltline and Dividend is 1.35 acres.  Assuming a C=0.9 and I = 8.88, the total Q is 10.78 cfs.  Based on the City of Dallas gutter capacity nomograph and the existing cross section of Beltline, we have determined the capacity to be approximately 12.5 cfs.  Working the nomograph backwards and starting with approximately 11 cfs you can expect a depth of flow to be around 0.4’ just before the inlet.   Please let me know if you have any questions and if you would like anything else other than this in a letter form.   Sincerely   C. Jack Evans, PE Associate Mobile 214.649.4130 jevans@pkce.com   Pacheco Koch Consulting Engineers 8350 N. Central Expwy, Suite 1000 Dallas, Texas 75206-1612 T 972.235.3031 • F 972.235.9544 www.pkce.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\478BAC31City_o...8/9/2010 Pacheco Koch January 15, 2008 PK No.: 2768-07.071 Mr. Keith Marvin, P.E. CITY OF COPPEll 255 Parkway Boulevard Cappello Texas 75019 ~~ Re: POINT WEST PARK Infrastructure Improvements Cappell, Texas Dear Mr. Marvin: In accordance with the drainage issue brought up by Larry Davis about the intersection of Dividend Drive and Beltline Road. we analyzed the condition and found the following: . The drainage area contributing to the intersection of Dividend Drive and Beltline Road is 1.35 acres. . Based on the City of Cappel! criteria for a 100 year storm the resulting a is 10.78 cfs. . Based on the City of Dallas gutter capacity nomograph and existing cross section of Beltline. the capacity of the gutter is approximately 12.5 cfs. . With the contributing flow of 11 cfs, the depth at the curb is expected to be 0.4' just before the inlet. We take no exceptions with the depth of flow in the street, as this is within normal design standards. If you have any questions regarding this issue or need any additional information, please call me at your convenience. CJSJ~c 2768-168 _...........'.."sincerely. ..- of'" OF r~Wl -Jl.~\ .........4:'~ ;' "'"'"'..... A.... , ~.' ~~ ". , : l .;:. "'l . * ~..............~., .;..... ..... ,. S_. C. ...t,\.l~~.. ~. oJ. ~"t:~"'9'3'840 ~. ~ ---...... ............